Completed No litigation declared Mixed project

FATEMA ELITE

By SAMEENA ANJUM SHAIKH

RG-MH-97348 · RERA P52200050092 · Last updated on MahaRERA portal: 12 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Ahmednagar registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedregistration recorded completed
27 of 33Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
4 of 27Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

FATEMA ELITE is a Mixed project by SAMEENA ANJUM SHAIKH in Ahmednagar, Maharashtra, registered with MahaRERA as P52200050092 on 15 Mar 2023. The registration is recorded completed; possession was promised by 31 Dec 2029. 23 of the 27 units on this registration are recorded sold or booked, and 27 of 33 construction stages are filed complete.

At a glance

Project

  • NameFATEMA ELITE
  • TypeMixed
  • Location
    • WESTON CITY ROAD
    • SHRIRAMPUR
    • Shrirampur (M Cl)
    • Ahmednagar
    • 413709
  • Pincode413709
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52200050092
  • ReraGenie IDRG-MH-97348

Builder

  • NameSAMEENA ANJUM SHAIKH
  • Entity typeIndividual

Key dates

this monthRegisteredMar 2023PromisedDec 2029Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Mar 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed95 files

Current status

85%23 of 27 units booked

Figures as on 12 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROW House on Plot No 12 to 19NA11808
Row house on plot no 20 to 27NA11808
Row House on Plot no 30 to 39NA1110010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 12 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

ROW House on Plot No 12 to 1982%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Row house on plot no 20 to 2782%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Row House on Plot no 30 to 3982%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 12 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,319 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityShrirampur Municipal Council
Permissible FSI2753.76
Proposed, not sanctioned2,754 sq m
Buildings approved10
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHRIRAMPUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSonal Nikhil Agrawal
EngineerAbid Ayyub Kureshi
Chartered AccountantSanjay Pagare
PartnerRole in project
SAMEENA ANJUM SHAIKH-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 May 2025

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf12 Sep 2025
Withdrawal Update Form 2File: Form 2_Fatema Elite.pdf12 Sep 2025
Withdrawal Update Form 3File: Form 3CA.pdf12 Sep 2025
Layout approvalFile: Plan for Plot No 12 to 19.pdf25 Jun 2025
Layout approvalFile: Plan for Plot No 20 to 27.pdf25 Jun 2025
Layout approvalFile: Plan for Plot No 30 to 39.pdf25 Jun 2025
Form 1File: Form 1.pdf4 Jun 2025
Form 2File: Form 2.pdf4 Jun 2025
Form 3File: Form 3CA.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf4 Jun 2025
Layout approvalFile: Shrirampur Nagar Parishad _Flat Letter.pdf13 May 2025
Layout approvalFile: Shriramur Nagar Parishad_Row House Letter.pdf13 May 2025
Copy of Layout Approval (in case of layout)File: Shrirampur Nagar Parishad _Flat Letter.pdf13 May 2025
Copy of Layout Approval (in case of layout)File: Shriramur Nagar Parishad_Row House Letter.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Form 3CA_Fatema Elite.pdf13 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Buuilding Number Change Dec merged.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3CA.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclouser of Inventory.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory _Dec 2024_Fatema Elite.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Fatema Elite.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3CA.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Fatema Elite.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Fatema Elite.pdf11 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Fatema Elite.pdf11 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 CA_Fatema Elite.pdf11 Jul 2024
Other - LegalFile: Approval of Cancellation.pdf10 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory Report_Fatema_March 2024.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf1 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3CA_Fatema_March 2024.pdf1 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf24 Apr 2024
Disclosure of sold/ booked inventoryFile: Fatema Elite.pdf29 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure D_page-0001.pdf27 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure Form 3_page-0001.pdf27 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-1.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-2.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 -1.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-2.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-3.pdf2 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5_Fatema Elite -Final.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Final.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Final -1.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3CA_Fatema Elite.pdf25 Jan 2024
Details of encumbrances concerned to FinanceFile: FE_Promoter.pdf8 Mar 2023
Details of encumbrances concerned to LegalFile: FE_Promoter.pdf8 Mar 2023
CERSAI detailsFile: CERSAI_Search_Report.pdf8 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3CA_Fatema Elite.pdf8 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration about Deposit and Withdrawal.pdf8 Mar 2023
Proforma of Agreement for saleFile: Model Sales Agreement_compressed.pdf8 Mar 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation in Model Agreement for Sale.pdf8 Mar 2023
Other - FinanceFile: Declaration about Deposit and Withdrawal.pdf8 Mar 2023
Layout approvalFile: Layout final1.pdf16 Feb 2023
Building plan approval or NA orderFile: Binder 1.pdf16 Feb 2023
Building plan approval or NA orderFile: Binder1 2.pdf16 Feb 2023
Building plan approval or NA orderFile: Binder1 3.pdf16 Feb 2023
Building plan approval or NA orderFile: Binder1 4.pdf16 Feb 2023
Building plan approval or NA orderFile: Binder1 5.pdf16 Feb 2023
Building plan approval or NA orderFile: Binder1_6.pdf16 Feb 2023
Building plan approval or NA orderFile: Binder1 7.pdf16 Feb 2023
Building plan approval or NA orderFile: Binder1 8.pdf16 Feb 2023
Building plan approval or NA orderFile: Binder1 9.pdf16 Feb 2023
Building plan approval or NA orderFile: Binder1 10.pdf16 Feb 2023
PAN CardFile: Pan.pdf16 Feb 2023
Copy of the legal title reportFile: Legal Title Report_Final.pdf16 Feb 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance_Promoter.pdf16 Feb 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance_Promoter.pdf16 Feb 2023
Copy of Layout Approval (in case of layout)File: Layout final1.pdf16 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Binder 1.pdf16 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Binder1 2.pdf16 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Binder1 3.pdf16 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Binder1 4.pdf16 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Binder1 5.pdf16 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Binder1_6.pdf16 Feb 2023

How this compares with Ahmednagar

85%of this project is bookeddistrict median 10%
7%of Ahmednagar projects moved their completion datethis one has not
28%of Ahmednagar registrations have lapsed or been cancelledthis one is completed

Computed across the 490+ Ahmednagar projects on ReraGenie, from their own filings.

Keep FATEMA ELITE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHRIRAMPUR490+ in Ahmednagar

Builder: SAMEENA ANJUM SHAIKH

SAMEENA ANJUM SHAIKH has 1 registration on MahaRERA, including FATEMA ELITE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ahmednagar district page.

Frequently asked questions

What are my rights if FATEMA ELITE is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FATEMA ELITE?

The registered promoter entity is SAMEENA ANJUM SHAIKH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FATEMA ELITE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FATEMA ELITE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FATEMA ELITE?

The professionals named in the filing: Architect: Sonal Nikhil Agrawal; Engineer: Abid Ayyub Kureshi; Chartered Accountant: Sanjay Pagare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FATEMA ELITE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FATEMA ELITE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FATEMA ELITE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.