Home / Browse projects / Nashik, Maharashtra / FAIZ-E-RASUL PARK

Registered No litigation declared Residential / Group Housing project

FAIZ-E-RASUL PARK

By SHAUKATALI ISMAIL GHASWALA

RG-MH-62890 · RERA P51600052978 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
10 of 44Construction stages doneacross 4 buildings; furthest along: External plumbing and external plaster, 70%
57 of 59Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

FAIZ-E-RASUL PARK is a Residential / Group Housing project by SHAUKATALI ISMAIL GHASWALA in Nashik, Maharashtra, registered with MahaRERA as P51600052978 on 10 Oct 2023. Possession is promised by 31 Mar 2028. 2 of the 59 units on this registration are recorded sold or booked, and 10 of 44 construction stages are filed complete.

At a glance

Project

  • NameFAIZ-E-RASUL PARK
  • TypeResidential / Group Housing
  • Location
    • WADALA
    • MADINA NAGAR
    • Nashik Road
    • Nashik
    • 422006
  • Pincode422006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600052978
  • ReraGenie IDRG-MH-62890

Builder

  • NameSHAUKATALI ISMAIL GHASWALA
  • Entity typeIndividual

Key dates

this monthRegisteredOct 2023PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Oct 2023
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed135 files

Current status

3%2 of 59 units booked
18.0%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA3317017
BUILDING-INA4310010
BUILDING -IINA4316016
BUILDING-IIINA4316016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is External plumbing and external plaster, at 70%.

BUILDING A79%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING-I24%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING -II0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING-III0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed113

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots113
Closed/Covered61
Open Space52
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A181735
BUILDING-I27936
BUILDING -II81321
BUILDING-III81321

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,695 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Nov 2025

Approvals and building plan

Sanctioning authorityNASHIK MUNCIPAL CORPORATION
Permissible FSI3573.06
Proposed, not sanctioned3,573 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGOREGAON WEST MUMBAI 400062
Estimated costRs 8.63 cr
Cost incurredRs 1.55 cr
Work done17.99%
BuildingWingEstimatedIncurred
-NARs 2.00 crRs 55,898
BUILDING -IINARs 1.73 cr-
BUILDING-IIINARs 1.73 cr-
BUILDING-INARs 1.65 crRs 63.69 lakh
BUILDING ANARs 1.51 crRs 90.95 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHWAVE DESIGNS
EngineerARCH WAVE DESIGNS
Chartered AccountantSDP AND COMPANY
Chartered AccountantRSPH & Associates
Chartered AccountantR H Pothiwal & Associates
PartnerRole in project
SHAUKATALI ISMAIL GHASWALA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE 30062026.pdf15 Jul 2026
Withdrawal Update Form 2File: ENGINEER CERTIFIATE 300626.pdf15 Jul 2026
Withdrawal Update Form 3File: CA CERTIFICATE 300626.pdf15 Jul 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 31032026.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE 31032026.pdf24 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE.pdf24 Apr 2026
Form 2A (FY 2025-2026)File: FORM 2A 31032026.pdf10 Apr 2026
Withdrawal Update Form 1File: ARCHITECTURAL CERTIFICATE Q3 NEW.pdf20 Jan 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE Q3 NEW.pdf20 Jan 2026
Withdrawal Update Form 3File: CA CERTIFICATE.pdf20 Jan 2026
Withdrawal Update Form 1File: ARCHITECT FORM 1 30092025.pdf19 Jan 2026
Withdrawal Update Form 1File: ARCHITECT FORM 1 30092025.pdf19 Jan 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 30092025.pdf19 Jan 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 30092025.pdf19 Jan 2026
Withdrawal Update Form 3File: CA CERTIFICATE 30092025.pdf19 Jan 2026
Withdrawal Update Form 3File: CA CERTIFICATE 30092025.pdf19 Jan 2026
Withdrawal Update Form 1File: ARCHITECT FORM 1 30092025.pdf1 Dec 2025
Withdrawal Update Form 2File: ENGINEER FORM 2 30092025.pdf1 Dec 2025
Withdrawal Update Form 3File: CA CERTIFICATE 30092025.pdf1 Dec 2025
Form 2A (FY 2023-2024)File: FORM 2A 31.03.2024.pdf20 Nov 2025
Form 2A (FY 2024-2025)File: FORM 2A 31.03.2025.pdf20 Nov 2025
Form 5 (FY 2024-2025)File: RERA Audit Report_24-25.pdf19 Nov 2025
Withdrawal Update Form 1File: ARCHITECT FORM 1 30092025.pdf29 Oct 2025
Withdrawal Update Form 2File: ENGINEER FORM 2 30092025.pdf29 Oct 2025
Withdrawal Update Form 3File: CA CERTIFICATE 30092025.pdf29 Oct 2025
Withdrawal Update Form 1File: ARCHITECT FORM 1 30092025.pdf15 Oct 2025
Withdrawal Update Form 2File: ENGINEER FORM 2 30092025.pdf15 Oct 2025
Withdrawal Update Form 3File: CA CERTIFICATE 30092025.pdf15 Oct 2025
Withdrawal Update Form 1File: ARCHITECT FORM 1 30092025.pdf10 Oct 2025
Withdrawal Update Form 2File: ENGINEER FORM 2 30092025.pdf10 Oct 2025
Withdrawal Update Form 3File: CA FORM 3 30092025.pdf10 Oct 2025
Form 1File: FORM 1 30092024.pdf7 Aug 2025
Form 2File: FOMR 2 30092024.pdf7 Aug 2025
Form 3File: FORM 3 30092024.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: unsold.pdf7 Aug 2025
Form 1File: FORM 1 31122024.pdf7 Aug 2025
Form 2File: FORM 2 31122024.pdf7 Aug 2025
Form 3File: FOMR 3 31122024.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: unsold.pdf7 Aug 2025
Form 1File: FORM 1 31032025.pdf7 Aug 2025
Form 2File: FORM 2 31032025.pdf7 Aug 2025
Form 3File: FORM 3 31032025.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: unsold.pdf7 Aug 2025
Form 1File: FORM 1 30062025.pdf7 Aug 2025
Form 2File: FORM 2 30062025.pdf7 Aug 2025
Form 3File: FORM 3 30062025.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: unsold.pdf7 Aug 2025
Form 5 (FY 2023-2024)File: Signed RERA Audit Report final.pdf4 Aug 2025
Form 1File: ARCHITECT CERTIFICATE 30062024.pdf31 Jul 2025
Form 2File: ENGINEER CERTIFICATE 30062024.pdf31 Jul 2025
Form 3File: CA CERTIFICATE 30062024.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: unsold.pdf31 Jul 2025
Form 1File: ARCHITECT CERTIFICATE.pdf31 Jul 2025
Form 2File: ENGINEER CERTIFICATE.pdf31 Jul 2025
Form 3File: CA CERTIFICATE.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: unsold.pdf31 Jul 2025
Form 1File: Architect Certificate.pdf31 Jul 2025
Form 2File: ENGINEER CERTIFICATE.pdf31 Jul 2025
Form 3File: CA CERTIFICATE.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: UNSOLD.pdf31 Jul 2025
Building plan approvalFile: BUILDING PLAN1.pdf23 Apr 2025
Building plan approvalFile: BUILDING PLAN2.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINNER CERTIFICATE.pdf23 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf23 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN1.pdf23 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN2.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf2 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Architect Certificate.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf17 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf6 Oct 2023
Declaration about Commencement CertificateFile: FORMAT D.pdf6 Oct 2023

How this compares with Nashik

3%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FAIZ-E-RASUL PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MADINA NAGAR4,100+ in Nashik

2 kmFAIZ-E-RASUL PARKCompleted 183Lapsed / revoked 49Other 118Dot size: filed unitsN

Filed coordinates, straight-line distance. 350 registered projects within 2 km.

Builder: SHAUKATALI ISMAIL GHASWALA

SHAUKATALI ISMAIL GHASWALA has 1 registration on MahaRERA, including FAIZ-E-RASUL PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if FAIZ-E-RASUL PARK is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FAIZ-E-RASUL PARK?

The registered promoter entity is SHAUKATALI ISMAIL GHASWALA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FAIZ-E-RASUL PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FAIZ-E-RASUL PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FAIZ-E-RASUL PARK?

The professionals named in the filing: Architect: ARCHWAVE DESIGNS; Engineer: ARCH WAVE DESIGNS; Chartered Accountant: SDP AND COMPANY; Chartered Accountant: RSPH & Associates; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FAIZ-E-RASUL PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FAIZ-E-RASUL PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FAIZ-E-RASUL PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.