Home / Browse projects / Pune, Maharashtra / EWS Building

Completed No litigation declared Residential / Group Housing project

EWS Building

By Farrokh Framji Wadia

RG-MH-22629 · RERA P52100031954 · Last updated on MahaRERA portal: 23 Apr 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 13 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

EWS Building is a Residential / Group Housing project by Farrokh Framji Wadia in Pune, Maharashtra, registered with MahaRERA as P52100031954 on 29 Nov 2021. The registration is recorded completed; possession was promised by 3 Jan 2025. The completion date has moved by 13 months from the original filing.

At a glance

Project

  • NameEWS Building
  • TypeResidential / Group Housing
  • Location
    • West Avenue
    • Kalyani Nagar
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411006
  • Pincode411006
  • RERA no.P52100031954
  • ReraGenie IDRG-MH-22629

Builder

  • NameFarrokh Framji Wadia
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2021First promiseDec 2023Revised toJan 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Nov 2021
  • Promised completion3 Jan 2025
  • Revised completionRevised to 3 Jan 2025 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EWS BuildingNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

EWS Building: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed67

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots67
Closed/Covered40
Open Space27

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,355 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8048.12
Proposed, not sanctioned8,048 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC Bank Kalyani Nagar Pune 411006

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPinnac AECL Consultancy Pvt Ltd
ArchitectI M Associates
EngineerKPM Engineering Consultant
EngineerWTP Cost Advisory Services India Private Ltd.
Chartered AccountantH Malkan & Associates
Chartered AccountantP.D. KUDVA & CO.
PartnerRole in project
Farrokh Framji Wadia-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012490Dec 2023 → Dec 2024

Reason as filed by the promoterStop Work Issued by Pune Municipal Corporation and Labour Department on 4th February 2022, NOC was received from Pune Municipal Corporation on 8th August 2022 and Labour Department on 18th may 2022. (Both NOC attached)

EXT52100027430Dec 2023 → Jan 2025

Reason as filed by the promoterWe had obtained a Part Occupation Certificate (OC) (encompassing 1st to 3rd floors) from the Pune Municipal Corporation on March 7, 2024. As the building has been fully constructed before the schedule time, we submitted an application for a full building OC (encompassing Ground, Podium, and 4th to 13th floors). The full building OC was subsequently granted by the Pune Municipal Corporation on January 3, 2025. Notwithstanding the foregoing, we acknowledge a minor delay of four (4) days in obtaining the Full OC beyond the validity period of the project registration. We attribute this delay to th

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Jan 2025

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 EWS as of 31st March 2025.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 EWS as of 31st March 2025.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold EWS as of 31st March 2025.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 EWS as of 31st March 2025.pdf15 Apr 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 EWS_merged.pdf11 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 EWS.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 EWS as of 31st Dec 2024.pdf29 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 EWS.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 EWS as of 31st Dec 2024.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 EWS as of 31st Dec 2024.pdf24 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC - EWS Building.pdf24 Jan 2025
Proforma of Agreement for saleFile: Agreement for Sale (RERA).pdf20 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Tower 1 Part OC.pdf26 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 EWS as of 30 Sept 2023.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 EWS as of 30 Sept 2023.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 EWS as of 30 Sept 2024.pdf16 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 EWS as of 30 Sept 2024.pdf16 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 EWS as of 30 Sept 2024.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 EWS as of 30 Sept 2024.pdf16 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold EWS as of 30 Sept 2024.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 EWS as of 31 Mar 2024.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 EWS as of 30 June 2024.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 EWS as of 30 June 2024.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 EWS as of 30 June 2024.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold EWS as of 30 June 2024.pdf9 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A EWS as of 31 Mar 2024.pdf15 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 EWS as of 31 Mar 2024.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 EWS as of 31 Mar 2024.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 EWS as of 31 Mar 2024.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 EWS as of 31 Mar 2024.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold EWS as of 31 March 2024.pdf11 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold EWS as of 31 Dec 2023.pdf8 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 EWS as of 31 Dec 2023.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 EWS as of 31 Dec 2023.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 EWS 31 DEC 22.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Architect Certificates EWS 31st March 23.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Architect Certificates EWS 30th June 2023.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 EWS as of 30 Sept 2023.pdf25 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold EWS as of 30 Sept 2023.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 EWS as of 30 Sept 2023.pdf11 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A Engineer Certificates EWS 31st March 23.pdf11 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 EWS RERA Form -03_March-23.pdf11 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 CA Certificates EWS 30th June 2023.pdf11 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form - 5 EWS RERA Form -03_March-231.pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2 Engineer certificates ews 31st Dec, 22.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineer Certificates EWS 31st March 23.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineer Certificates EWS 30th June 2023.pdf11 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 EWS 31 DEC 22.pdf5 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: EWS.pdf7 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: CC compressed.pdf3 Oct 2022
Declaration in FORM BFile: CC Declaration.pdf3 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect EWS.pdf3 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality 2A EWS Building.pdf3 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf3 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf3 Oct 2022
Copy of the legal title reportFile: 211124045433_0001_compressed.pdf24 Nov 2021
Building plan approvalFile: 50-51_compressed.pdf29 Oct 2021
Building plan approvalFile: 51-51_compressed.pdf29 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 50-51_compressed.pdf29 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 51-51_compressed.pdf29 Oct 2021
Layout approvalFile: Layout August 21_compressed (1)_compressed.pdf28 Oct 2021
Building plan approvalFile: NA DIRECTIVES.pdf28 Oct 2021
Building plan approvalFile: N A challan_Recipt.pdf28 Oct 2021
PAN CardFile: FFW_PAN_CARD.PDF28 Oct 2021
Details of encumbrancesFile: Encumbrances (5).pdf28 Oct 2021
Copy of Layout Approval (in case of layout)File: Layout August 21_compressed (1)_compressed.pdf28 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: NA DIRECTIVES.pdf28 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: N A challan_Recipt.pdf28 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf28 Oct 2021
Declaration about Commencement CertificateFile: CC Declaration.pdf28 Oct 2021
Declaration in FORM BFile: FORM B (EWS) Notary (1).pdf28 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Arch Cert - .pdf28 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate EWS- Compressed -Revised compressed.pdf28 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf28 Oct 2021
Proforma of Allotment letterFile: AllotmentLetter (72).pdf28 Oct 2021
Proforma of Allotment letterFile: Agreement for Sale (RERA).pdf28 Oct 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 13 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EWS Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyani Nagar13,700+ in Pune

Builder: Farrokh Framji Wadia

Farrokh Framji Wadia has 3 registrations on MahaRERA, including Bluegrass Business Park - Tower A and Bluegrass Business Park - Tower B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if EWS Building is delayed beyond 3 Jan 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EWS Building?

The registered promoter entity is Farrokh Framji Wadia, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EWS Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EWS Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EWS Building?

The professionals named in the filing: Architect: Pinnac AECL Consultancy Pvt Ltd; Architect: I M Associates; Engineer: KPM Engineering Consultant; Engineer: WTP Cost Advisory Services India Private Ltd.; Chartered Accountant: H Malkan & Associates; Chartered Accountant: P.D. KUDVA & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EWS Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EWS Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EWS Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.