Home / Browse projects / Mumbai Suburban, Maharashtra / EVERGREEN BY S RAHEJA

Registration lapsed No litigation declared Residential / Group Housing project

EVERGREEN BY S RAHEJA

By S RAHEJA CASA LLP

RG-MH-87583 · RERA P51800045921 · Last updated on MahaRERA portal: 9 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
0Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

EVERGREEN BY S RAHEJA is a Residential / Group Housing project by S RAHEJA CASA LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800045921 on 15 Jun 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameEVERGREEN BY S RAHEJA
  • TypeResidential / Group Housing
  • Location
    • PERRY ROAD
    • BANDRA WEST MUMBAI
    • Andheri
    • Mumbai Suburban
    • 400050
  • Pincode400050
  • RERA no.P51800045921
  • ReraGenie IDRG-MH-87583

Builder

  • NameS RAHEJA CASA LLP
  • Entity typeOthers
  • Named personsSHYAM GIRDHARIDAS RAHEJA, RAMKRISHNA SHYAM RAHEJA
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

10 months past promisethis monthRegisteredJun 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Jun 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed52 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EVERGREEN BY S RAHEJANA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

EVERGREEN BY S RAHEJA: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,127 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PERRY COOPERATIVE HOUSING SOCIETY LIMITEDAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3934.26
Proposed, not sanctioned3,734 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHAR WEST MUMBAI 400052

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJ T VATNANI
EngineerJ W CONSULTANT
Chartered AccountantANJ & CO
PartnerRole in project
S RAHEJA CASA LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert 7th April 2025.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Evergreen 15th February 2025.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Evergreen Form 3 CA Certificate 13th Feb 2025.pdf19 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Unit Evergreen 13th Feb 2025.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 dated 7th Jan 2025 Evergreen.pdf9 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Evergreen 31st March 2024.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Evergreen 5th Dec 2024.pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: Evergreen Sold unsold Nov 2024.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 S Raheja Casa LLP.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 8th Oct 2024.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 2022 TO 2023 EVERGREEN.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: Evergreen - Sold unsold - July 2024.pdf11 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 6th July 2024.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 - EVERGREEN 7th April 2024.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Form 2 - 18th January 2024.pdf30 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold -Jan2024.pdf23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Evergreen 11th January 2024.pdf23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Form 1 - CASA - 12 JANUARY 2024.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: EVERGREEN - SOLD UNSOLD - 2nd Sept 2023.pdf23 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Revised Form 5 - Evergreen 31st March 2023.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Audit Report - S Raheja Casa LLP - Evergreen.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cert EVERGREEN 2nd Sept 2023.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Evergreen 31st Aug 2023 compressed.pdf21 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dated 24th August 2023.pdf25 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Evergreen Rera Form 2 A Cert 6th March 2023.pdf12 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory 25th January 2023.pdf18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Evergreen 13th Feb 2023.pdf14 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: New Form - 2 - Engineers Certificate -Evergreen - 01February2023.pdf7 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 23 Jan 2023 Evergreen compressed.pdf7 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 04-10-2022.pdf10 Oct 2022
Layout approvalFile: IOD Issued 13-01-2022.pdf3 Jun 2022
Building plan approvalFile: IOD DRAWING 13-01-2022_1.pdf3 Jun 2022
Building plan approvalFile: IOD DRAWING 13-01-2022_2.pdf3 Jun 2022
Building plan approvalFile: IOD DRAWING 13-01-2022_3.pdf3 Jun 2022
Building plan approvalFile: IOD DRAWING 13-01-2022_4.pdf3 Jun 2022
Building plan approvalFile: IOD DRAWING 13-01-2022_5.pdf3 Jun 2022
PAN CardFile: Casa - PAN.pdf3 Jun 2022
Copy of the legal title reportFile: Title Certificate.pdf3 Jun 2022
Details of encumbrancesFile: Encumbrances.pdf3 Jun 2022
Copy of Layout Approval (in case of layout)File: IOD Issued 13-01-2022.pdf3 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD DRAWING 13-01-2022_1.pdf3 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD DRAWING 13-01-2022_2.pdf3 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD DRAWING 13-01-2022_3.pdf3 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD DRAWING 13-01-2022_4.pdf3 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD DRAWING 13-01-2022_5.pdf3 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CC issued 10-5-2022.pdf3 Jun 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificat- Perry.pdf3 Jun 2022
Declaration in FORM BFile: Affidavit Cum Declaration - Perry CHSL - RERA-.pdf3 Jun 2022
CERSAI detailsFile: CERSAI_Search_Report_200238788686_For_Asset_Based_Search_03_06_2022_13_55_45_174.pdf3 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate -.pdf3 Jun 2022
Proforma of Allotment letterFile: Perry CHS Draft Rera Agreement.pdf3 Jun 2022
Proforma of Allotment letterFile: Provisional Allottment Letter.pdf3 Jun 2022

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Z16CTS 463 FINAL PLOT NO 87-88 VILLAGE BANDRA 16TH ROAD TPS III BANDRA WEST MUMBAI 40005022CompletedJun 2024Dec 2021
HINDUJA HOSPITALMAHIM WEST MUMBAI1CompletedDec 2018Dec 2018
SDS REHAJA RESIDENCY21-31 DARIYA ASHRAM PANCHKOSHI ROAD PANDEYPUR VARANASI140CompletedJan 2018Late, Mar 2018
SHREE POOJA VIIMODEL TOWN SOCIETY GULMOHAR CROSS ROAD NO.7 JVPD SCHEME VILE PARLE WEST MUMBAI6CompletedNov 2017Feb 2017
SANTACRUZ SAPPHIRE CHS LTDPLOT NO 194 TPS IV JUNCTION OF EAST AVENUE MAIN AVENUE SANTACRUZ WEST MUMBAI22CompletedJul 2017Jul 2017
NATRAJ MADHU PARKPLOT NO 260 11TH ROAD OPPOSITE MADHU PARK KAHR WEST MUMBAI18CompletedOct 2016Aug 2016
GURUKRIPA KALINA NAPHANAGAR CHSLOPP. CANARA BANK KALINA SANTACRUZ WEST MUMBAI 40005435CompletedOct 2016Oct 2016
HARI BHUVANKHAR PALI ROAD KHAR WEST MUMBAI 4000529CompletedAug 2015Late, Sep 2015

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EVERGREEN BY S RAHEJA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BANDRA WEST MUMBAI6,700+ in Mumbai Suburban

Builder: S RAHEJA CASA LLP

S RAHEJA CASA LLP has 2 registrations on MahaRERA, including EVERGREEN BY S RAHEJA and VERDANA BY S RAHEJA. Its filings disclose 12 earlier MahaRERA projects: declares 10 of 12 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that EVERGREEN BY S RAHEJA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if EVERGREEN BY S RAHEJA is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EVERGREEN BY S RAHEJA?

The registered promoter entity is S RAHEJA CASA LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EVERGREEN BY S RAHEJA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EVERGREEN BY S RAHEJA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EVERGREEN BY S RAHEJA?

The professionals named in the filing: Architect: J T VATNANI; Engineer: J W CONSULTANT; Chartered Accountant: ANJ & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EVERGREEN BY S RAHEJA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EVERGREEN BY S RAHEJA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EVERGREEN BY S RAHEJA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.