Home / Browse projects / Thane, Maharashtra / EV 9 Square

Registered No litigation declared Others project

EV 9 Square

By EV HOMES CONSTRUCTIONS PVT LTD

RG-MH-07019 · RERA P51700055650 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 115.00 crore secured on the land, in favour of INFINA Finance Private Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Staircases, 36%
117 of 144Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

EV 9 Square is a Others project by EV HOMES CONSTRUCTIONS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700055650 on 5 Apr 2024. Possession is promised by 31 Dec 2028. 27 of the 144 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameEV 9 Square
  • TypeOthers
  • Location
    • Sector 9
    • Vashi
    • Navi Mumbai (M Corp.)
    • Thane
    • 400703
  • Pincode400703
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700055650
  • ReraGenie IDRG-MH-07019

Builder

  • NameEV HOMES CONSTRUCTIONS PVT LTD
  • Entity typeCompany
  • CINU45200MH2005PTC155637
  • GSTIN27AABCE5013H1Z0
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorsELENJIKAMALIL VARKEY THOMAS, JOISE THOMAS, VICKY THOMAS, RICKI THOMAS
  • Other registrations5 more →
  • Completed2 of 6
  • Declared earlier projects6 →

Key dates

this monthRegisteredApr 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed100 files

Current status

19%27 of 144 units booked
45.1%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sale/Incentive - EV 9 SquareNA292912519144

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 36%.

Sale/Incentive - EV 9 Square: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises16%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks36%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed293

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots293
Closed/Covered293

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,330 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofINFINA Finance Private Limited
Secured amountRs 115.00 crore
CERSAI search filedYes
Declared on20 May 2026
LandownerVillageDistrict
Avani Co-operative Housing Society LimitedNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityNavi Mumbai Municipal Corporation
Permissible FSI12712.6
Proposed, not sanctioned12,713 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNear Avlon School,Sector 19B, Navi Mumbai - 400703
Estimated costRs 134.95 cr
Cost incurredRs 60.93 cr
Work done45.15%
BuildingWingEstimatedIncurred
Sale/Incentive - EV 9 SquareNARs 132.25 crRs 60.93 cr
-NARs 2.70 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDessin2000 Architect and Interior Designers
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed & Associates
Chartered AccountantJayesh Sanghrajka & Co.LLP
PartnerRole in project
EV HOMES CONSTRUCTIONS PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - EV 9 Square as on Dec 2025.pdf20 May 2026
Withdrawal Update Form 2File: Form 2 Dec 2025 -9 Square.pdf20 May 2026
Withdrawal Update Form 3File: Form 3 Dec 2025 -9 Square.pdf20 May 2026
Form 5 (FY 2024-2025)File: Form 5 9 SQUARE FY 24-25.pdf29 Dec 2025
Withdrawal Update Form 1File: Form 1- EV 9 Square as on Sep 2025.pdf11 Nov 2025
Withdrawal Update Form 2File: Form 2- EV 9 Square as on Sep 2025.pdf11 Nov 2025
Withdrawal Update Form 3File: Form 3-EV 9 Square as on Sep 2025.pdf11 Nov 2025
Building plan approvalFile: Plan 1_compressed.pdf25 Sep 2025
Building plan approvalFile: Plan 2_compressed.pdf25 Sep 2025
Building plan approvalFile: Plan 3_compressed.pdf25 Sep 2025
Building plan approvalFile: Plan 4_compressed.pdf25 Sep 2025
Building plan approvalFile: Plan 5_compressed.pdf25 Sep 2025
Building plan approvalFile: Plan 6_compressed.pdf25 Sep 2025
Building plan approvalFile: Plan 7_compressed.pdf25 Sep 2025
Building plan approvalFile: Plan 8_compressed.pdf25 Sep 2025
Building plan approvalFile: Plan 9_compressed.pdf25 Sep 2025
Building plan approvalFile: Plan 10_compressed.pdf25 Sep 2025
Building plan approvalFile: Plan 11_compressed.pdf25 Sep 2025
Form 1File: Form 1 - EV 9 Square as on June 2025.pdf20 Jul 2025
Form 2File: Form 2 - EV 9 Square as on June 2025.pdf20 Jul 2025
Form 3File: Form 3 - EV 9 Square as on June 2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - EV 9 Square as on June 2025.pdf20 Jul 2025
Details of encumbrances concerned to FinanceFile: EV 9 Square - Encumbrance Certificate.pdf27 May 2025
Details of encumbrances concerned to LegalFile: EV 9 Square - Encumbrance Certificate.pdf27 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - EV 9 Square - Sep 24_11zon.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - EV 9 Square - Dec 24_11zon.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Mar 2025_11zon (2).pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - EV 9 Square - Sep 24.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - EV 9 Square - Dec 24.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mar 2025.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Mar 2025.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-EV 9 Square as on 31-03-2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - EV 9 Square as on March 2025.pdf20 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - EV 9 Square for FY 2023-24.pdf5 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - EV 9 Square as on March 2025.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - EV 9 Square as on Dec 2024.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - EV 9 Square as on Dec 2024.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - EV 9 Square as on Sep 2024.pdf19 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Unsold inventory -EV 9 Square - 30-09-2024.pdf4 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-EV 9 Square as on 30-09-2024.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - EV 9 Square as on 30th Sep 2024.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 EV 9 Square June 2024_0001 (1).pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 - EV 9 Square - Jun'24 (1)_compressed.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PF (1).pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: bbbbbbbbb.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - EV 9 Square as on June 2024.pdf16 Jul 2024
Building plan approvalFile: Section-Elevation-Bldg-B-Sales-Incentive.pdf1 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Section-Elevation-Bldg-B-Sales-Incentive.pdf1 Apr 2024
Declaration about Commencement CertificateFile: Decl of CC-EV 9 Square.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-EV 9 Square.pdf1 Apr 2024
Other - TechnicalFile: Annexure-A-EV 9 Square.pdf1 Apr 2024
Other - TechnicalFile: Rev-Plan-1.pdf21 Mar 2024
Other - TechnicalFile: Rev-Plan-2.pdf21 Mar 2024
Other - TechnicalFile: Rev-Plan-3.pdf21 Mar 2024
Other - TechnicalFile: Rev-Plan-4.pdf21 Mar 2024
Other - TechnicalFile: Rev-Plan-5.pdf21 Mar 2024
Other - TechnicalFile: RERA Registration Application.pdf21 Mar 2024
Disclosure of sold/ booked inventoryFile: Decl-Sold-Unsold.pdf19 Mar 2024
Copy of the legal title reportFile: Avani Title Report.pdf21 Feb 2024
Copy of the legal title reportFile: Deed of Lease.pdf21 Feb 2024
Copy of the legal title reportFile: Covering Letter for Lease Agreement.pdf21 Feb 2024
Proforma of Agreement for saleFile: Avani AFS.pdf21 Feb 2024
Deviation Report with respect to model copy of AgreementFile: AFS Deviation Report .pdf21 Feb 2024
Building plan approvalFile: Plans-7.pdf9 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Plans-7.pdf9 Jan 2024
Layout approvalFile: Plan-1.pdf28 Dec 2023
Details of encumbrances concerned to FinanceFile: Decl-Encum-Legal.pdf28 Dec 2023
Details of encumbrances concerned to LegalFile: Decl-Encum-Legal.pdf28 Dec 2023
Copy of Layout Approval (in case of layout)File: Plan-1.pdf28 Dec 2023
Proforma of Allotment letterFile: RERA Allotment.pdf11 Dec 2023
CERSAI detailsFile: CERSAI Declaration.pdf8 Dec 2023
Building plan approvalFile: Approved Plan-3_compressed.pdf21 Nov 2023
Building plan approvalFile: Approved Plan-4_compressed.pdf21 Nov 2023
Building plan approvalFile: Approved Plan-5_compressed.pdf21 Nov 2023
Building plan approvalFile: Approved Plan-6_compressed.pdf21 Nov 2023
Building plan approvalFile: Approved Plan-8_compressed.pdf21 Nov 2023
Building plan approvalFile: Approved Plan-9_compressed.pdf21 Nov 2023
Building plan approvalFile: Approved Plan-10_compressed.pdf21 Nov 2023
Building plan approvalFile: Approved Plan-11_compressed.pdf21 Nov 2023
Building plan approvalFile: Approved Plan-12_compressed.pdf21 Nov 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SINAI TOWERKAKINAD KOCHI KERALA 68201738CompletedJul 2017Feb 2017
E V CASTLEPLOT NO 110 SECTOR 9 ULVE TALUKA PANVEL DISTT RAIGAD 41020626CompletedApr 2016Apr 2016
ZION I AND IIPLOT NO 29 AND 30 SECTOR 25 NERUL EAST NAVI MUMBAI 40070659CompletedMar 2016Late, May 2017
SAFFIRE HEIGHTSPLOT NO 32A AND 33A SECTOR 12 KALAMBOLI TALUKA PANVEL DISTT RAGIAD 41020970CompletedMar 2010Late, May 2012

How this compares with Thane

19%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EV 9 Square on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vashi7,600+ in Thane

2 kmEV 9 SquareCompleted 11Lapsed / revoked 4Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: EV HOMES CONSTRUCTIONS PVT LTD

EV HOMES CONSTRUCTIONS PVT LTD has 6 registrations on MahaRERA, including EV CITY CENTRE and EV Heart City. Its filings disclose 6 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if EV 9 Square is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EV 9 Square?

The registered promoter entity is EV HOMES CONSTRUCTIONS PVT LTD, a company as per the filing. Its CIN U45200MH2005PTC155637 and GSTIN 27AABCE5013H1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EV 9 Square?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EV 9 Square?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EV 9 Square?

The professionals named in the filing: Architect: Dessin2000 Architect and Interior Designers; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Jayesh Sanghrajka & Co.LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EV 9 Square?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EV 9 Square. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EV 9 Square to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.