Home / Browse projects / Mumbai Suburban, Maharashtra / EUPHORIA
EUPHORIA
By FAIRMONT CONSTRUCTIONS PRIVATE LIMITED
RG-MH-30679 · RERA P51800030945 · Last updated on MahaRERA portal: 12 Oct 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 42 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EUPHORIA is a Residential / Group Housing project by FAIRMONT CONSTRUCTIONS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800030945 on 29 Sep 2021. Possession is promised by 31 Dec 2028. The completion date has moved by 42 months from the original filing. 32 of the 136 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameEUPHORIA
- TypeResidential / Group Housing
- Location
- CTS 75B Bandivali Hill Raod Off S V Road Jogeshwari West
- Jogeshwari
- Borivali
- Mumbai Suburban
- 400102
- Pincode400102
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800030945
- ReraGenie IDRG-MH-30679
Builder
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Sep 2021
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 30 Jun 2025)
- Buildings1 building record
- Documents filed93 files
Current status
Figures as on 12 Oct 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| EUPHORIA | NA | 16 | 16 | 129 | 7 | 136 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 90%.
EUPHORIA: 22% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 90% |
| Basement (if any) | 75% |
| Podiums (if any) | 0% |
| Plinth | 75% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| EUPHORIA | NA | Rs 56.61 cr | Rs 7.36 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ellora Project Consultants Private Limited |
| Engineer | Ellora Project Consultants Private Limited |
| Chartered Accountant | A R Sodha |
| Partner | Role in project |
|---|---|
| FAIRMONT CONSTRUCTIONS PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterCovid Situation on Construction of project
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000303469 | AJAZ ISHTIYAQ QURESHI | FAIRMONT CONSTRUCTION PVT LTD | 01/12/2022 |
| CC12600765 | Ajaz ISTIYAQHUSAIN QURESHI | FAIRMONT CONSTRUCTIONS PRIVATE LIMITED | 10/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Sep 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Sep 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2021-2022)File: Form 5 2021-22.pdf | 12 Oct 2025 |
| Form 5 (FY 2022-2023)File: Form 5 2022-23.pdf | 12 Oct 2025 |
| Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf | 12 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 2024-25.pdf | 12 Oct 2025 |
| Withdrawal Update Form 1File: Revised Layout Building Plans.pdf | 11 Oct 2025 |
| Withdrawal Update Form 2File: CC CTS 75 revised --.pdf | 11 Oct 2025 |
| Withdrawal Update Form 3File: RERA- Form-3.pdf | 11 Oct 2025 |
| Form 1File: Form -1 Sep-21.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -Sep-21.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -Sep-21.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Sep-21.pdf | 8 Oct 2025 |
| Form 1File: Form -1 Dec-21.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -Dec-21.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -Dec-21.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec-21.pdf | 8 Oct 2025 |
| Form 1File: Form -1 Mar-22.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -Mar-22.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -EUPHORIA-Mar-22.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Mar-22.pdf | 8 Oct 2025 |
| Form 1File: Form -1 June-22.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -June-22.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -June-22.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold June-22.pdf | 8 Oct 2025 |
| Form 1File: Form -1 Sep-22.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -Sep-22.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -EUPHORIA-Sep-22.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Sep-22.pdf | 8 Oct 2025 |
| Form 1File: Form -1 Dec-22.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -Dec-22.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -EUPHORIA-Dec-22.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec-22.pdf | 8 Oct 2025 |
| Form 1File: Form -1 Mar-23.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -Mar-23.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -Mar-23.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Mar-23.pdf | 8 Oct 2025 |
| Form 1File: Form -1 June-23.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -June-23.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -EUPHORIA-June-23.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold June-23.pdf | 8 Oct 2025 |
| Form 1File: Form -1 Sep-23.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -Sep-23.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -EUPHORIA-Sep-23.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Sep-23.pdf | 8 Oct 2025 |
| Form 1File: Form -1 Dec-23.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -Dec-23.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -EUPHORIA-Dec-23.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold -Dec-23.pdf | 8 Oct 2025 |
| Form 1File: Form -1 Mar-24.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -Mar-24.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -EUPHORIA-Mar-24.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Mar-24.pdf | 8 Oct 2025 |
| Form 1File: Form -1 Sep-24.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -Sep-24.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -EUPHORIA-Sep-24.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Sep-24.pdf | 8 Oct 2025 |
| Form 1File: Form -1 Dec-24.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -Dec-24.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -EUPHORIA.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 31-12-24.pdf | 8 Oct 2025 |
| Form 1File: Form -1 Mar-25.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -Mar-25.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -EUPHORIA-Mar-25.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Mar-25.pdf | 8 Oct 2025 |
| Form 1File: Form -1 Mar-24.pdf | 8 Oct 2025 |
| Form 2File: Form 2 -Mar-24.pdf | 8 Oct 2025 |
| Form 3File: FORM 3 -EUPHORIA-Mar-24.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Mar-24.pdf | 8 Oct 2025 |
| Form 1File: Form-1 June-25 FF.pdf | 8 Oct 2025 |
| Form 2File: Form-2 June-25 FF.pdf | 8 Oct 2025 |
| Form 3File: RERA- Form-3.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Annex june-25.pdf | 8 Oct 2025 |
| Building plan approvalFile: Layout 1 Euphoria.pdf | 23 Sep 2021 |
| Building plan approvalFile: Layout 2 Euphoria.pdf | 23 Sep 2021 |
| Building plan approvalFile: Layout 3 Euphoria.pdf | 23 Sep 2021 |
| Building plan approvalFile: Layout 4 Euphoria.pdf | 23 Sep 2021 |
| Details of encumbrancesFile: Letter of Encumbrance Euphoria.pdf | 23 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout 1 Euphoria.pdf | 23 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout 2 Euphoria.pdf | 23 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout 3 Euphoria.pdf | 23 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout 4 Euphoria.pdf | 23 Sep 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| REYHAAN TOWER | SAHAKAR BANDIVALI HILL ROAD OFF. S.V. ROAD JOGESHWARI WEST MUMBAI 400102 | 100 | Completed | Nov 2010 | Nov 2010 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep EUPHORIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Jogeshwari6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 331 registered projects within 2 km.
ROSWALT ZAIDEN
A S HIGHTECH LLP
Dream Signature
Prime Realtors
Sayba Noor
Star Raises
Gurukrupa Ekam
GURUKRUPA REALCON INFRABUILD LLP
The Westpark Phase-1
WESTPARK DEVELOPERS PRIVATE LIMITED
Kalpataru Hrushikesh
Kalpataru Townships Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: FAIRMONT CONSTRUCTIONS PRIVATE LIMITED
FAIRMONT CONSTRUCTIONS PRIVATE LIMITED has 3 registrations on MahaRERA, including FAIRMONT MOKSH and CASAROYALE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if EUPHORIA is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EUPHORIA?
The registered promoter entity is FAIRMONT CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EUPHORIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against EUPHORIA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for EUPHORIA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at EUPHORIA?
The professionals named in the filing: Architect: Ellora Project Consultants Private Limited; Engineer: Ellora Project Consultants Private Limited; Chartered Accountant: A R Sodha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EUPHORIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback