Home / Browse projects / Raigarh, Maharashtra / ETERNIA SPACE PHASE II
ETERNIA SPACE PHASE II
By PLANET SPACE
RG-MH-03077 · RERA P52000020402 · Last updated on MahaRERA portal: 5 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ETERNIA SPACE PHASE II is a Residential / Group Housing project by PLANET SPACE in Raigarh, Maharashtra, registered with MahaRERA as P52000020402 on 9 Apr 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 197 of the 279 units on this registration are recorded sold or booked, and 33 of 33 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameETERNIA SPACE PHASE II
- TypeResidential / Group Housing
- Location
- OLD VENGAON ROAD
- KARJAT
- Dhakatevengaon
- Raigarh
- 410201
- Pincode410201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000020402
- ReraGenie IDRG-MH-03077
Builder
- NamePLANET SPACE
- Entity typePartnership
- PartnerPINKY KAMLESH JAIN
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Apr 2019
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
- Buildings3 building records
- Documents filed83 files
Current status
Figures as on 5 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No 3 Emerald | NA | 9 | 7 | 140 | 0 | 140 |
| Building No 4 Coral | NA | 9 | 7 | 98 | 0 | 98 |
| Building No 1 Topaz | NA | 9 | 7 | 35 | 6 | 41 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
33 of 33 construction stages are filed complete across 3 buildings.
Building No 3 Emerald100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building No 4 Coral100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building No 1 Topaz100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed61
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building No 3 Emerald | 30 | 30 |
| Building No 4 Coral | 25 | 25 |
| Building No 1 Topaz | 6 | 6 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building No 3 Emerald | NA | Rs 17.15 cr | Rs 15.13 cr |
| Building No 4 Coral | NA | Rs 14.37 cr | Rs 14.37 cr |
| Building No 1 Topaz | NA | Rs 6.17 cr | Rs 6.17 cr |
| - | NA | Rs 4.82 cr | Rs 2.17 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NEHA JAIN |
| Engineer | DHANRAJ SHEKATE |
| Engineer | S R CONSULTANTS |
| Chartered Accountant | PIYUSH BOLIA |
| Chartered Accountant | YASHWANT JAIN |
| Partner | Role in project |
|---|---|
| PLANET SPACE | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of the project u/s 7(3) in Format B. The project has been delayed as we have received the new commencement certificate and approved plans as per the increase in FSI from the competent authority. We have the required number of consents of the allottees for purpose of extension of RERA registration period of the said project.
Reason as filed by the promoterDUE TO MAJOR IMPACT IN COVID 19 AND LOW SALES WE WERE UNABLE TO REACH THE SALES TARGET ALSO NON AVAIBLABITY OF LABOURS IMPACTED THE PROJECT TO BE COMPLETED AS PER THE RESPECTED TIMELINE THEREFORE WE ARE REQUESTING THE AUTHORITY TO KINDLY GRANT US THE EXTENTION SO THAT WE WILL BE ABLE TO COMPLETE THE PROJECT AND OBTAIN FULL AND FINAL OC BEFORE 31/12/2026
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000500413 | VASANT SHRIRANG KHARAT | KAMLESH JAIN | 09/05/2024 |
| SM12600081 | Bhakti Achrekar | PLANET SPACE | 23/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Apr 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Dec 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed83
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 June2026.pdf | 5 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 June 2026.pdf | 5 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 June 2026.pdf | 5 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 March 2026.pdf | 6 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 March 2026.pdf | 6 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 March 2026.pdf | 6 Jun 2026 |
| Withdrawal Update Form 1File: Form 01 Architect - Dec 2025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: Form 02 Eng - Dec 2025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Form 03 CA - Dec 2025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - 30-06-2025.pdf | 23 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1 - 30-09-2025.pdf | 23 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 - 30-06-2025.pdf | 23 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 - 30-09-2025.pdf | 23 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 - 30-06-2025.pdf | 23 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3 - 30-09-2025.pdf | 23 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1 - 30-09-2025.pdf | 22 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 22 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3 - 30-09-2025.pdf | 22 Dec 2025 |
| Details of encumbrances concerned to FinanceFile: Title Report.pdf | 25 Apr 2025 |
| Details of encumbrances concerned to LegalFile: Title Report.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Rera Certificate 23-01-2025.pdf | 20 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Rera Certificated 17-07-2024.pdf | 6 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 25 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 25 May 2024 |
| Disclosure of sold/ booked inventoryFile: 4 Disclosure of sold booked inventory.pdf | 25 May 2024 |
| Certificates of CA (Form 3)File: 6 Certificates of CA (Form 3).pdf | 25 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 19 Oct 2023 |
| Certificates of CA (Form 3)File: RERA FORM -3 CA Certificate 31032023.PDF | 21 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Structural Engineers Cerificate 15092023.PDF | 15 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Rera Certificate 28-07-2023.PDF | 3 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate March 2023.pdf | 20 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 architect rera certificate 18-07-2023 (1).pdf | 19 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate March 2022.pdf | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Year March 2022.pdf | 6 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2023.pdf | 1 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 REERA Plot No 20 Vengaon TOPAZ EMERALD CORAL.pdf | 1 Apr 2023 |
| Certificates of CA (Form 3)File: Q4 2022 Form 3 .pdf | 1 Apr 2023 |
| Proforma of Allotment letterFile: Model Agreement.pdf | 24 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - Space Group Revised.pdf | 3 Jan 2022 |
| Layout approvalFile: Phase II_CC_01 Layout (1)_11zon.pdf | 28 Dec 2021 |
| Building plan approvalFile: Phase II_CC_02 Building 1_All_11zon.pdf | 28 Dec 2021 |
| Building plan approvalFile: Phase II_CC_03 Building 3_1-7 Floor Plan_11zon.pdf | 28 Dec 2021 |
| Building plan approvalFile: Phase II_CC_05 Building 4_All_11zon.pdf | 28 Dec 2021 |
| Building plan approvalFile: Phase II_CC_06 Comman Area Layout_11zon.pdf | 28 Dec 2021 |
| Copy of Layout Approval (in case of layout)File: Phase II_CC_01 Layout (1)_11zon.pdf | 28 Dec 2021 |
| Building Plan Approval (IOD)File: Phase II_CC_02 Building 1_All_11zon.pdf | 28 Dec 2021 |
| Building Plan Approval (IOD)File: Phase II_CC_03 Building 3_1-7 Floor Plan_11zon.pdf | 28 Dec 2021 |
| Building Plan Approval (IOD)File: Phase II_CC_05 Building 4_All_11zon.pdf | 28 Dec 2021 |
| Building Plan Approval (IOD)File: Phase II_CC_06 Comman Area Layout_11zon.pdf | 28 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Phase II_CC_Order_11zon.pdf | 28 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf | 28 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf | 28 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Sept 2021.pdf | 28 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Emerald- Sold Unsold.pdf | 28 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Coral- Sold Unsold.pdf | 28 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20.pdf | 25 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-21.pdf | 25 Dec 2021 |
| Declaration about Commencement CertificateFile: CC Declaration (1) (2).pdf | 23 Dec 2021 |
| CERSAI detailsFile: Cersai 201A.pdf | 17 Dec 2021 |
| CERSAI detailsFile: Cersai 201B.pdf | 17 Dec 2021 |
| Certificates of CA (Form 3)File: Rera form.pdf | 10 Dec 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEW ARCHITECH CERT.pdf | 14 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEW ENGG CERTIFICATE_.pdf | 14 Aug 2021 |
| Certificates of CA (Form 3)File: RERA CERTIFICATE- PLANET SPACE-.pdf | 14 Aug 2021 |
| Building plan approvalFile: ETERNIA SPACE COMPLETE CC.pdf | 4 Apr 2019 |
| Layout approvalFile: PLAN Layout approval.pdf | 4 Apr 2019 |
| Building plan approvalFile: PLAN Building No 3 EMERALD.pdf | 4 Apr 2019 |
| Building plan approvalFile: PLAN Building No 4 CORAL.pdf | 4 Apr 2019 |
| Building plan approvalFile: PLAN ETERNIA CLUB HOUSE.pdf | 4 Apr 2019 |
| PAN CardFile: ETERNIA PAN.PDF | 4 Apr 2019 |
| Copy of the legal title reportFile: LATEST TITLE ETERNIA SPACE.pdf | 4 Apr 2019 |
| Details of encumbrancesFile: LATEST TITLE ETERNIA SPACE.pdf | 4 Apr 2019 |
| Copy of Layout Approval (in case of layout)File: PLAN Layout approval.pdf | 4 Apr 2019 |
| Building Plan Approval (IOD)File: ETERNIA SPACE COMPLETE CC.pdf | 4 Apr 2019 |
| Building Plan Approval (IOD)File: PLAN Building No 3 EMERALD.pdf | 4 Apr 2019 |
| Building Plan Approval (IOD)File: PLAN Building No 4 CORAL.pdf | 4 Apr 2019 |
| Building Plan Approval (IOD)File: PLAN ETERNIA CLUB HOUSE.pdf | 4 Apr 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: ETERNIA SPACE COMPLETE CC.pdf | 4 Apr 2019 |
| Declaration in FORM BFile: Affidavit cum declaration.pdf | 4 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate EMERALD CORAL.PDF | 4 Apr 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 83 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ETERNIA SPACE PHASE II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KARJAT5,900+ in Raigarh
Filed coordinates, straight-line distance. 107 registered projects within 2 km.
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: PLANET SPACE
PLANET SPACE has 2 registrations on MahaRERA, including Eternia Space and ETERNIA SPACE PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if ETERNIA SPACE PHASE II is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ETERNIA SPACE PHASE II?
The registered promoter entity is PLANET SPACE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ETERNIA SPACE PHASE II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ETERNIA SPACE PHASE II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ETERNIA SPACE PHASE II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ETERNIA SPACE PHASE II?
The professionals named in the filing: Architect: NEHA JAIN; Engineer: DHANRAJ SHEKATE; Engineer: S R CONSULTANTS; Chartered Accountant: PIYUSH BOLIA; Chartered Accountant: YASHWANT JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ETERNIA SPACE PHASE II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback