ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Eternia Space

Completed No litigation declared Residential / Group Housing project

Eternia Space

By PLANET SPACE

RG-MH-12344 · RERA P52000008057 · Last updated on MahaRERA portal: 25 Apr 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Eternia Space is a Residential / Group Housing project by PLANET SPACE in Raigarh, Maharashtra, registered with MahaRERA as P52000008057 on 18 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. 1 complaint is on record with the regulator.

At a glance

Project

  • NameEternia Space
  • TypeResidential / Group Housing
  • Location
    • Old Vengaon Road
    • Karjat
    • Dhakatevengaon
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000008057
  • ReraGenie IDRG-MH-12344

Builder

  • NamePLANET SPACE
  • Entity typePartnership
  • PartnersKumarpal Parasmal Jain, Kamlesh Parasmal Jain, Parambodh Jain, Swayambodh Jain
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredAug 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 2 SapphireNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Building No 2 Sapphire: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,590 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12710.07
Proposed, not sanctioned3,321 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKotak Mahindra Bank Ltd Jai Building C A Road Diamond Garden Chembur E Mumbai 71

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
PLANET SPACE-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000199208Yogesh PanditMr. Kamlesh Jain30/11/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Apr 2023

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Proforma of Agreement for saleFile: Model Agreement.pdf25 Apr 2025
Certificates of CA (Form 3)File: 11 Certificates of CA (Form 3).pdf13 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Certificates of Engineer (Form 2).pdf13 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 RERA Eternia Space Karjat.pdf10 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 RERA Eternia Space Karjat.pdf10 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf12 Feb 2025
Certificates of CA (Form 3)File: 10 Certificates of CA (Form 3).pdf12 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 1Architech RERA Certificate 20-07-2024.pdf23 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC order 3.pdf4 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 for Phase 1.pdf1 Apr 2023
Certificates of CA (Form 3)File: form3.PDF12 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Adobe Scan 09 Apr 2021 (1).pdf12 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Oct-Dec_compressed.pdf3 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Oct-Dec 19_compressed.pdf3 Feb 2020
Certificates of CA (Form 3)File: CA certificate Dec Quarter end 2019_compressed.pdf3 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate11072019-min.pdf23 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect Certificate RERA-min.pdf23 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Quarter ended June.PDF23 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Quarter ended September.PDF23 Dec 2019
Certificates of CA (Form 3)File: CA certificate June.PDF23 Dec 2019
Certificates of CA (Form 3)File: CA certificate September.PDF23 Dec 2019
Certificates of CA (Form 5)File: Form 5 A.PDF30 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 A.PDF30 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Jan-mar 19_compressed.pdf22 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Jan-mar 19_compressed.pdf22 Nov 2019
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate Jan-mar 19_compressed.pdf22 Nov 2019
Certificates of CA (Form 3)File: CA Certificate Jan - March 2019_compressed.pdf22 Nov 2019
Copy of the legal title reportFile: Title Certificate 20032019.PDF20 Mar 2019
Building plan approvalFile: Building No 2 SAPPHIRE.pdf1 Mar 2019
Layout approvalFile: ETERNIA LAYOUT 1.pdf1 Mar 2019
Building plan approvalFile: SAPPHIRE FSI.pdf1 Mar 2019
Building plan approvalFile: ETERNIA CLUB HOUSE.pdf1 Mar 2019
Copy of Layout Approval (in case of layout)File: ETERNIA LAYOUT 1.pdf1 Mar 2019
Building Plan Approval (IOD)File: SAPPHIRE FSI.pdf1 Mar 2019
Building Plan Approval (IOD)File: ETERNIA CLUB HOUSE.pdf1 Mar 2019
Building Plan Approval (IOD)File: Building No 2 SAPPHIRE.pdf1 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: NA Order 2.pdf1 Mar 2019
OtherFile: DECLARATION 2.PDF1 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CERTIFICATE OF ARCHITECT.pdf16 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Oct-Dec.PDF16 Jan 2019
Certificates of CA (Form 3)File: CA Certificate Oct - Dec.PDF16 Jan 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation Application.pdf30 Nov 2018
Certificates of CA (Form 5)File: Form 5.PDF15 Oct 2018
Certificates of CA (Form 3)File: CA Certificate Form 3.PDF4 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.PDF1 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf1 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect certificate.PDF27 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.PDF27 Apr 2018
Certificates of CA (Form 3)File: Schedule 3 CA Certificate.PDF27 Apr 2018
Layout approvalFile: NA PLAN5.pdf30 Jul 2017
Building plan approvalFile: NA PLAN4.pdf30 Jul 2017
Building plan approvalFile: NA PLAN3.pdf30 Jul 2017
Building plan approvalFile: NA PLAN2.pdf30 Jul 2017
Building plan approvalFile: NA PLAN1.pdf30 Jul 2017
Copy of the legal title reportFile: Title report.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: NA PLAN5.pdf30 Jul 2017
Building Plan Approval (IOD)File: NA PLAN4.pdf30 Jul 2017
Building Plan Approval (IOD)File: NA PLAN3.pdf30 Jul 2017
Building Plan Approval (IOD)File: NA PLAN2.pdf30 Jul 2017
Building Plan Approval (IOD)File: NA PLAN1.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA Certificate ETERNIA.PDF30 Jul 2017
Proforma of Allotment letterFile: Sale Agreement Draft ETERNIA SPACE.pdf30 Jul 2017
OtherFile: NA Order.pdf30 Jul 2017
OtherFile: DECLARATION ETERNIA.PDF30 Jul 2017
PAN CardFile: ETERNIA PAN.PDF29 Jul 2017
Details of encumbrancesFile: No Encumbrance ETERNIA.PDF29 Jul 2017
Declaration in FORM BFile: Aff cum Declaration.PDF29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.PDF29 Jul 2017
Proforma of Allotment letterFile: Eternia ALLOTMENT LETTER .pdf29 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Eternia Space on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Karjat5,900+ in Raigarh

2 kmEternia SpaceCompleted 43Lapsed / revoked 35Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 107 registered projects within 2 km.

Builder: PLANET SPACE

PLANET SPACE has 2 registrations on MahaRERA, including Eternia Space and ETERNIA SPACE PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Eternia Space is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Eternia Space?

The registered promoter entity is PLANET SPACE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Eternia Space?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Eternia Space?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Eternia Space?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Eternia Space?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Eternia Space. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Eternia Space to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.