Home / Browse projects / Bengaluru Rural, Karnataka / Emmay Environs Pride

Registration approved Residential/Group Housing project

Emmay Environs Pride

By Emmay environs

RG-KA-24210 · RERA PRM/KA/RERA/1250/304/PR/210323/004045

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 60 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2024Possession promisedmoved 60 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 40 documents Report an error

Emmay Environs Pride is a Residential/Group Housing project by Emmay environs in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/210323/004045 on 23 Mar 2021. Possession is promised by 31 Mar 2024. The completion date has moved by 60 months from the original filing.

At a glance

Project

  • NameEmmay Environs Pride
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/304/PR/210323/004045
  • ReraGenie IDRG-KA-24210

Builder

  • NameEmmay environs
  • Entity typePartnership Firm
  • Authorized SignatoryMuneer Ahmed S S

Key dates

this monthRegisteredMar 2021First promiseMar 2019Revised toMar 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Mar 2021
  • Promised completion31 Mar 2024
  • Revised completionRevised to 31 Mar 2024 (originally 31 Mar 2019)
  • Buildings1 building record
  • Documents filed40 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EMMAY ENVIRONS PRIDE---40040

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,023 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 5.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRamesha D B
EngineerG Praveen Kumar

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1250/304/PR/221219/004045Mar 2019 → Mar 2020

Reason as filed by the promoterothers; Shortage of Labour

ExtensionMar 2020 → Mar 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed40

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/210323/004045 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Firm Reg Certificate.pdf-
Project Details-
Architect Certificate for Work Completion Schedule till DateFile: Architect Certificate - work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engg Certificate Project Extn- Completed Work.pdf-
CA Certificate for Funds UtilizationFile: CA Funds Utilization Certified (PE).pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Certificate - Pending work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg Certificate Project Extension- Pending Work.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate for Funds Required.pdf-
AffidavitFile: Affidavit Under Section 18 of RERA Act.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsold Details.xlsx-
Document 1File: RERA Form B.pdf-
Document 2File: RERA Order Copy.pdf-
Sanction Plan-
Single Plot Approved Plan-
Sale Deed-Draft - E E Pride-
SALE AGREEMENT EE PRIDE-
Sale Deed - Gima-
Site Section Plan-
Sanction Plan-
ALLOTMENT LETTER-
E E broucher-
EMMAY ENVIRONS Specification-
EC-
Panchayath Katha-
JDA-
Single Plot Approved Plan-
Sanction Plan-
Conversion Order-
Cash Flow Statement 2016 - 2017File: Bank Statement.pdf-
Cash Flow Statement 2015 - 2016File: Bank Statement.pdf-
FORM B-
Appeal 1 Order CopyFile: 2323.pdf-
Prospectus/BrochureFile: 20220622 EmmayEnvirons e-BROUCHER_035816_compressed-1-compressed.pdf-
Tower Excel SheetFile: Unit Details.xlsx-
Occupancy CertificateFile: Occupancy Certificate.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: Electrical Approval.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: Panchayat NOC.pdf-
Architect certificate for having completed the work(in format no 5)File: Form-5 Closure Certificate.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form-4 CC.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Closure Affidavit.pdf-

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one moved by 60 months
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep Emmay Environs Pride on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmEmmay Environs PrideOther 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 21 registered projects within 2 km.

Builder: Emmay environs

Emmay environs has 1 registration on RERA Karnataka, including Emmay Environs Pride. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if Emmay Environs Pride is delayed beyond 31 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Emmay Environs Pride?

The registered promoter entity is Emmay environs, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Emmay Environs Pride?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Emmay Environs Pride?

The professionals named in the filing: Architect: Ramesha D B; Engineer: G Praveen Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Emmay Environs Pride?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Emmay Environs Pride. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Emmay Environs Pride to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.