Registration approved Litigation declared Residential/Group Housing project

Embassy Springs - Phase 2A, Apartments

By EMBASSY DEVELOPMENTS LIMITED

RG-KA-81226 · RERA PRM/KA/RERA/1250/303/PR/180526/001825 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Litigation declared, 30 cases
  • 5 complaints at RERA Karnataka
  • Completion date moved by 58 months
  • 3 extensions taken

Clear

  • Separate project account declared
Dec 2027Possession promisedmoved 58 months from the original
8 of 19Construction stages donefurthest along: Railing and Grill fixing, 60%
103 of 826Units unsoldnot recorded sold or booked
5Complaints at RERA Karnatakaon this registration
Jump to the 92 documents Report an error

Embassy Springs - Phase 2A, Apartments is a Residential/Group Housing project by EMBASSY DEVELOPMENTS LIMITED in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/303/PR/180526/001825 on 26 May 2018. Possession is promised by 31 Dec 2027. The completion date has moved by 58 months from the original filing. 723 of the 826 units on this registration are recorded sold or booked, and 8 of 19 construction stages are filed complete. 5 complaints are on record with the regulator.

At a glance

Project

  • NameEmbassy Springs - Phase 2A, Apartments
  • TypeResidential/Group Housing
  • Location
    • Devanahalli
    • Bengaluru Rural
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1250/303/PR/180526/001825
  • ReraGenie IDRG-KA-81226

Builder

  • NameEMBASSY DEVELOPMENTS LIMITED
  • Entity typeCompany
  • CINU85110KA1995PTC017950
  • Authorized SignatoryRamakrishnan PR
  • DirectorsRamakrishnan PR, Rajesh Ramchand Bajaj
  • Other registrations4 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredMay 2018First promiseFeb 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on26 May 2018
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 28 Feb 2023)
  • Buildings5 building records
  • Documents filed92 files

Current status

88%723 of 826 units booked
81.6%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Gardenia---2520252
Hibiscus---1120112
Fucshia---1120112
Daisy---1960196
Elderberry---1540154

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 19 construction stages are filed complete. The stage furthest along is Railing and Grill fixing, at 60%.

Building: 48% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Retaining wall (All types)100%
Plinth level Beam100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
RCC or MS Framed structure100%
Masonry construction: Bricks, Concrete blocks etc100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc8%
Basic work of Water supply, Sanitary and Electrification5%
Dadoing, Skirting, Flooring, Tiles work (All types)10%
Railing and Grill fixing60%
Electrification, Water supply and Sanitary Finishing5%
Wardrobe, Showcase, Kitchen cabinet, Puja work0%
Fire prevention and fire fighting fitting and fixture with network5%
Weather Proof work(tile,concrete)5%
Painting2%
Elevation work3%
Internal and External work including landscapes as per santioned drawings0%

Progress on shared amenities41

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Internal Roads & FootpathsYes5%
Sewage and Drainage SystemYes5%
Parks & Tree plantingYes0%
Street LightingYes0%
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalYes0%
Water conservationYes0%
Energy managementYes0%
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes0%
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes10%
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes10%
Smart Home AutomationYes0%
CCTV SurveillanceYes0%
Club HouseYes10%
Community HallNoNot applicable
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
GasYes0%
Water and SanitationYes0%
Air Conditioning And incerntionNoNot applicable
StaircasesYes50%
LiftsYes20%
Staircases and Lift lobbies, corridor,lobbies, corridorYes50%
Fire escapesYes30%
Common entrance and exit for the building / common portico/foyer/verandahYes10%
BasementNoNot applicable
TerraceYes60%
Outer WallYes10%
Open parking areas and common storage spacesYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area31,461 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 366.75 cr
Cost incurredRs 299.27 cr
Spent of the estimate81.6%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 304.13 crRs 249.67 cr
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 62.61 crRs 47.69 cr
Payment of taxes-Rs 1.91 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSynergy Property Development Private Limited
EngineerNadig Consulting Private Limited

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionFeb 2023 → Nov 2023

No reason recorded in the filing

EX/PRM/KA/RERA/1250/303/PR/231207/001825Nov 2023 → Nov 2024

Reason as filed by the promoterForce Majeure

ExtensionNov 2024 → Dec 2027

No reason recorded in the filing

Litigation declared30

CaseCourtStatus
SLP No.25505/2024/2024Hon'ble Ms.Justice Bela.M.Trivedi and Hon'ble Mr.Justice Sathish Chandra Sharma-
O.S.137/2011/2011Senior Civil Judge Devanahalli Hon'ble Judge Kumar.G-
O.S.647/2014/2014Senior Civil Judge Devanahalli Hon'ble Judge Kumar.G-
O.S.1329/2006/2006Senior Civil Judge Devanahalli Hon'ble Judge Kumar.G-
O.S.345/2015/2015Senior Civil Judge Devanahalli Hon'ble Judge Kumar.G-
O.S.490/2015/2015Senior Civil Judge Devanahalli Hon'ble Judge Kumar.G-
O.S.675/2015/2015Senior Civil Judge Devanahalli Hon'ble Judge Kumar.G-
O.S.179/2019/2019Senior Civil Judge Devanahalli Hon'ble Judge Kumar.G-
O.S.826/2020/20201 st Additional Senior Civil Judge Devanahalli Hon'ble Judge Praveen Naik-
O.S.770/2016/2016Senior Civil Judge Devanahalli Hon'ble Judge Kumar.G-
O.S.No.1144/2022/2022The Principal Senior Civil Judge, Devanahalli-
O.S.685/2021/20212 Additional Senior Civil Judge Devanahalli-
O.S.2122/2006/2006Senior Civil Judge Devanahalli Hon'ble Judge Kumar.G-
O.S.759/2020/2020Senior Civil Judge Devanahalli Hon'ble Judge Kumar.G-
O.S. 349/15Principal Civil Judge & JMFC Devanahalli-
O.S.770/2016/2016Senior Civil Judge Devanahalli-
O.S 152/16Additional Civil Judge & JMFC Devanahalli-
O.S 466/16Senior Civil Judge Devanahalli-
RSA.No.2496/2017/2017High court of Karnataka-
RFA.No.1741/2018 (OS.No.752/2015)The High Court of Karnataka-
O.S.179/2019/2019Senior Civil Judge Devanahalli-
O.S. 385/2019/2019The Principal Civil Judge & JMFC, Devanahalli-
R.F.A.No.2259/2019/2019The High Court of Karnataka-
O.S.826/2020/20201 st Additional Senior Civil Judge Devanahalli-
O.S.759/2020/2020Senior Civil Judge Devanahalli-
O.S.685/2021/20212 Additional Senior Civil Judge Devanahalli-
O.S.No.1144/2022/2022The Principal Senior Civil Judge, Devanahalli-
W.P.No.19800/2025/2025The Hon'ble High Court of Karnataka-
O.S.No.455/2025/2025The Additional Civil Judge, Devanahalli-
O.S.No.143/2025/2025III Additional Senior Civil Judge, Devanahalli-

Complaints filed with RERA Karnataka5

Case no.ComplainantRespondentFiled
CMP/211206/0008692-NAM Estates Private Limited06/12/2021
CMP/221014/0010102-NAM Estates Private Limited14/10/2022
00320/2024-NAM Estates Private Limited26/03/2024
00607/2024-NAM Estates Private Limited18/06/2024
01228/2024-NAM Estates Private Limited20/11/2024

Documents filed92

As listed on the registration, under the names the promoter filed them with; the newest 80 of 92 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/303/PR/180526/001825 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Embassy Springs Ph2A Apts_CA Certificate_Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Embassy Springs Ph2A Apts_Architect CErtificate_Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Embassy Springs Ph2A Apts_Engineer Certificate_Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Horticulture department15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Emabssy Springs Ph2A Apts_CA Certificate_1st Qtly_FY 2026-27.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Embassy Springs Ph2A Apt_Archi Certificate_1st Qtly_FY 2026-27.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Embassy Springs Ph2A Apts_Engineer Certificate_1st Qtly_FY 2026-27.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Horticulture department15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Embassy Springs Ph2A Apts_CA certificate_4th Qtly_FY 2025-26.pdf14 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Embassy Springs Ph2A Apts_Architect Certificate_4th Qtly_FY 2025-26.pdf14 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Embassy Springs Ph2A Apts_Engineer Certificate_4th Qtly_FY 2025-26.pdf14 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Embassy Springs Ph2A_CA Certificate_3rd Qtly_FY 2025-26.pdf14 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Embassy Springs Ph2A Apt_Architect Certificate_3rd Qtly_FY 2025-26.pdf14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Embassy Springs Ph2A Apt_Engineer Certificate_3rd Qtly_FY 2025-26.pdf14 Jan 2026
CertificateFile: Incorporation.PDF-
Project Details-
Architect Certificate for Work Completion Schedule till DateFile: Embassy Edge_Architect Certificate_Work Completed_30-09-2023.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Embassy Edge_Engineer Certificate_Work Completed_30-09-2023.pdf-
CA Certificate for Funds UtilizationFile: Embassy Edge - Fund Utilization_CA Certificate_30-09-2023.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Embassy Edge_Architect Certificate _Work Pending_30-09-2023.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Embassy Edge_Engineer Certificate_Work Pending_30-09-2023.pdf-
CA Certificate for Funds required for Project CompletionFile: Embassy Edge - Fund Required_CA Certificate_30-09-2023.pdf-
AffidavitFile: Embassy Edge_Affidavit cum Declaration_30-09-2023.pdf-
Details Of Sold/ Un-sold UnitsFile: Embassy Edge_Sold and Unsold_30-09-2023.xlsx-
Document 1File: AIA NOC.pdf-
Document 2File: SEIAA NOC.pdf-
Document 3File: FIRE NOC.pdf-
Document 4File: Horticulture NOC.pdf-
Document 5File: BESCOM NOC for 100 release.pdf-
Document 6File: BSNL NOC.pdf-
Document 7File: EC for Sy No 72-2 72-3 and 67-287.pdf-
Document 8File: Embassy Edge_Affdavit_Form B_30-09-2023.pdf-
Annexure - 4 - CC-
Annexure - 5 - Building plan-
Spring Development Plan-
Annexure - 14 - Sale deed-
Annexure - 7 - Proforma of ATS-
Sale Deed Dated 14-07-2004 compressed-
Annexure - 9 - Section plan-
Spring Development Plan-
Annexure - 11 - Allotment letter-
Brochure-
Annexure - 13 - Amenities-
EC last 13 years-
Conversion Mutation Document compressed-
Conversion Order-
Annexure - 17 -Relinquishment-
Fire Noc-
Airport Noc-
Bescom ACK-
CGWA-
KSPCB-
Environment Clearance-
BSNL Noc-
Annexure - 6 - Layout plan-
Annexure - 9 - Section plan-
Annexure - 18 - Conversion order-
Balance Sheet 2016 - 2017File: Nam Estates - Balance Sheet.pdf-
Balance Sheet 2015 - 2016File: Annexure 1 - Nam BS 15-16.pdf-
Balance Sheet 2014 - 2015File: Annexure 1 - Nam BS 14-15.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Nam Estates - P&L Statement.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Annexure 2 - Nam P&L 15-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Annexure 2 - Nam P&L 14-15.pdf-
Director's Report 2016 - 2017File: Nam Estates - Director Report.pdf-
Director's Report 2015 - 2016File: Annexure 3 - Nam - Directors Report - FY 2015-16.pdf-
Director's Report 2014 - 2015File: Annexure 3 - Nam Directors Report 14-15.pdf-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
Embassy Springs - Phase 1, Plotted Development-OngoingAug 2018Not delivered

How this compares with Bengaluru Rural

88%of this project is bookeddistrict median 45%
20%of Bengaluru Rural projects moved their completion datethis one moved by 58 months
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep Embassy Springs - Phase 2A, Apartments on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

Builder: EMBASSY DEVELOPMENTS LIMITED

EMBASSY DEVELOPMENTS LIMITED has 5 registrations on RERA Karnataka, including EMBASSY VERDE and Embassy Springs - Phase 2A, Apartments. Its filings declare 4 earlier projects, none of them declared completed. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if Embassy Springs - Phase 2A, Apartments is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Embassy Springs - Phase 2A, Apartments?

The registered promoter entity is EMBASSY DEVELOPMENTS LIMITED, a company as per the filing. Its CIN U85110KA1995PTC017950 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Embassy Springs - Phase 2A, Apartments?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Embassy Springs - Phase 2A, Apartments?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Embassy Springs - Phase 2A, Apartments?

The professionals named in the filing: Architect: Synergy Property Development Private Limited; Engineer: Nadig Consulting Private Limited. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Embassy Springs - Phase 2A, Apartments?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Embassy Springs - Phase 2A, Apartments. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Embassy Springs - Phase 2A, Apartments to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.