Registration lapsed No litigation declared Residential / Group Housing project

ELITE DREAM

By GURUDATTA DEVELOPERS

RG-MH-24609 · RERA P52100007371 · Last updated on MahaRERA portal: 7 Feb 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 43 months past the filed date
  • Completion date moved by 26 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2023Possession promised43 months past this date
35 of 44Construction stages doneacross 4 buildings; furthest along: Installation of Lifts, 96%
0Complaints at MahaRERAon this registration
Jump to the 27 documents Report an error

ELITE DREAM is a Residential / Group Housing project by GURUDATTA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100007371 on 17 Aug 2017. Possession was promised by 30 Mar 2023 and is now 43 months past that date. The completion date has moved by 26 months from the original filing.

At a glance

Project

  • NameELITE DREAM
  • TypeResidential / Group Housing
  • Location
    • Fursungi
    • Haveli
    • Pune
    • 412308
  • Pincode412308
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100007371
  • ReraGenie IDRG-MH-24609

Builder

  • NameGURUDATTA DEVELOPERS
  • Entity typePartnership
  • PartnersRAJENDRA SAHEBRAO ZENDE, PRADIP VISHNU KHUTWAD
  • Other registrations6 more →
  • Completed3 of 7
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

43 months past promisethis monthRegisteredAug 2017First promiseJan 2021Revised toMar 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Aug 2017
  • Promised completion30 Mar 2023
  • Revised completionRevised to 30 Mar 2023 (originally 31 Jan 2021)
  • Buildings4 building records
  • Documents filed27 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING -1 WING ANA130000
BUILDING-2 WING -DNA130000
BUILDING-1 WING BNA100000
BUILDING-1 WING CNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 7 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

35 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Installation of Lifts, at 96%.

BUILDING -1 WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING-2 WING -D80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises78%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks72%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.72%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%
BUILDING-1 WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING-1 WING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes98%
Water SupplyYes96%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes99%
Storm Water DrainsYes99%
Landscaping & Tree PlantingYes99%
Street LightingYes97%
Community BuildingsYes98%
Treatment And Disposal Of Sewage And Sullage WaterYes99%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes98%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes97%
Electrical meter room, sub-station, receiving stationYes97%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed53

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots53
Closed/Covered53
BuildingClosed/CoveredTotal
BUILDING -1 WING A3030
BUILDING-2 WING -D2323

Land and ownership31

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,950 sq m
Land owned byThe promoter, with other names on the file
Named landowners31
LandownerVillageDistrict
27 CO PROMOTERPune (M Corp.)Pune
BHAUSAHEB GULAB DHAMALFursungiPune
NANASAHEB DASHARATH DHAMALFursungiPune
DATTATRAYDASHARATH DHAMALFursungiPune
MAHADEV DASHARATH DHAMALFursungiPune
PANDURANG GULABRAO DHAMALFursungiPune
SARUBAI GULAB DHAMALFursungiPune
SITABAI NANASAHEB DHAMALFursungiPune
ASHOK NANASAHEB DHAMALFursungiPune
PALLAVI ASHOK DHAMALFursungiPune
VASANT NANASAHEB DHAMALFursungiPune
GOURI VASANT DHAMALFursungiPune
BEBI MAHADEV DHAMALFursungiPune
BHARATI BALASAHEB GARUDFursungiPune
AARATI MAHADEV DHAMALFursungiPune
SANGEETA DATTATRAY DHAMALFursungiPune
NIRMALA BHAUSAHEB DHAMALFursungiPune
AMOL BHAUSAHEB DHAMALFursungiPune
PRIYANKA AMOL DHAMALFursungiPune
AMIT BHAUSAHEB DHAMALFursungiPune
CHAITRALI SANTOSH HARAPALEFursungiPune
MONIKA HANUMANT PAWARFursungiPune
MEENA PANDURANG DHAMALFursungiPune
GEETANJALI SANDIP GAIKWADFursungiPune
PRAMOD PANDURANG DHAMALFursungiPune
SHIVAJI DASHARATH DHAMALFursungiPune
BHEEMA SHIVAJI DHAMALFursungiPune
AJINKYA SHIVAJI DHAMALFursungiPune
GURUDATTA DEVELOPERSFursungiPune
Nirmala B DhamalFursungiPune
Mahadeo D DhamalFursungiPune

Approvals and building plan

Permissible FSI6424.92
Proposed, not sanctioned6,425 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANTOSH RASKAR
EngineerVK KAKADE
PartnerRole in project
GURUDATTA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100009096Jan 2021 → Sep 2022

Reason as filed by the promoter1. Lockdown due to Covid-19 Pandemic: As you are aware of that, there was nationwide lockdown due to Covid-19 pandemic, and complete shutdown which resulted into shut down in all activities. Though Government has given voluntary extension of 6 months, but work has been delayed due to various restrictions on movement of workforce, limited work capacity of various offices. 2. Labour Issues due to Covid-19 Pandemic: Due to uncertainty of lockdown and on health grounds, lot of labour force mainly from outside state has return to their respective home, which resulted into non-availability of labour

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed27

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Scan.pdf7 Feb 2023
Declaration about Commencement CertificateFile: Declaration of Commencement Certificate.pdf11 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineering Certificate 19-20.pdf11 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineering Certificate 20-21.pdf11 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold Inventory of ABC Building_compressed.pdf11 Aug 2021
Disclosure of sold/ booked inventoryFile: Declaration of Sold.pdf11 Aug 2021
Disclosure of sold/ booked inventoryFile: Declaration of sold D Building_compressed.pdf11 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2020-21.pdf10 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-20.pdf10 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5.pdf20 Nov 2019
Certificates of CA (Form 5)File: gurudatta.pdf30 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate for Rera 3-ilovepdf-compressed.pdf24 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engin Cert for Rera 3-ilovepdf-compressed (1).pdf24 May 2018
Certificates of CA (Form 3)File: RERA CERTIFICATE-GURUDATTA-ilovepdf-compressed (1).pdf24 May 2018
Commencement Certificates / NA Order for plotted developmentFile: ilovepdf_merged.pdf7 Mar 2018
Layout approvalFile: PLAN LAYOUT.pdf31 Jul 2017
Building plan approvalFile: bUILDING PAN.pdf31 Jul 2017
PAN CardFile: PAN CARD.pdf31 Jul 2017
Copy of the legal title reportFile: encumberance certificate.pdf31 Jul 2017
Details of encumbrancesFile: encumberance certificate.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: PLAN LAYOUT.pdf31 Jul 2017
Building Plan Approval (IOD)File: bUILDING PAN.pdf31 Jul 2017
Declaration in FORM BFile: fORM 3B.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer's certificate (form 2).pdf31 Jul 2017
Certificates of CA (Form 3)File: CA.pdf31 Jul 2017
Proforma of Allotment letterFile: dRAFT AGREEMENT.pdf31 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 26 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ELITE DREAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Fursungi13,700+ in Pune

2 kmELITE DREAMCompleted 35Lapsed / revoked 14Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 81 registered projects within 2 km.

Builder: GURUDATTA DEVELOPERS

GURUDATTA DEVELOPERS has 7 registrations on MahaRERA, including ELITE DREAM and GURUDATTA RESIDENCY. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that ELITE DREAM shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ELITE DREAM is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ELITE DREAM?

The registered promoter entity is GURUDATTA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ELITE DREAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ELITE DREAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ELITE DREAM?

The professionals named in the filing: Architect: SANTOSH RASKAR; Engineer: VK KAKADE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ELITE DREAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ELITE DREAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ELITE DREAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.