ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / ELEGANT PHASE - I

Registered No litigation declared Residential / Group Housing project

ELEGANT PHASE - I

By DGAINS BHOOMI NIRMAAN LIMITED

RG-MH-27885 · RERA P52000024571 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
45 of 110Construction stages doneacross 10 buildings; furthest along: Internal walls, 90%
14 of 27Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

ELEGANT PHASE - I is a Residential / Group Housing project by DGAINS BHOOMI NIRMAAN LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000024571 on 24 Feb 2020. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 13 of the 27 units on this registration are recorded sold or booked, and 45 of 110 construction stages are filed complete.

At a glance

Project

  • NameELEGANT PHASE - I
  • TypeResidential / Group Housing
  • Location
    • JAMBRUNG
    • HIREWADI
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000024571
  • ReraGenie IDRG-MH-27885

Builder

  • NameDGAINS BHOOMI NIRMAAN LIMITED
  • Entity typeCompany
  • PartnerNOVANILAK DHIREN SARMAH
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2020First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Feb 2020
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings10 building records
  • Documents filed70 files

Current status

48%13 of 27 units booked
88.5%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
151NA21303
152NA21303
215,218,219NA21404
126,127NA21202
128NA21202
140NA21101
142NA21101
186NA21101
229NA21101
172 -173,193NA53909

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

45 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Internal walls, at 90%.

15166%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
15259%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
215,218,21966%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
126,12753%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
12849%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
14064%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
14264%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
18690%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
22941%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
172 -173,19364%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered1
Open Space23
BuildingClosed/CoveredOpen SpaceTotal
151033
152033
215,218,219044
126,127022
128022
140011
142011
186011
229011
172 -173,193156

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,453 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Jan 2026
LandownerVillageDistrict
DGAINS BHOOMI NIRMAAN LIMITEDBHAYANDARThane

Approvals and building plan

Sanctioning authorityRAIGAD DISTRICT COLLECTOR
Permissible FSI2305.0
Proposed, not sanctioned2,305 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHAYANDER WEST
Estimated costRs 5.27 cr
Cost incurredRs 4.66 cr
Work done88.49%
BuildingWingEstimatedIncurred
172 -173,193NARs 97.49 lakhRs 86.10 lakh
215,218,219NARs 92.25 lakhRs 80.99 lakh
151NARs 50.05 lakhRs 44.16 lakh
152NARs 50.05 lakhRs 44.16 lakh
126,127NARs 48.30 lakhRs 42.67 lakh
128NARs 48.30 lakhRs 42.67 lakh
140NARs 34.10 lakhRs 30.64 lakh
142NARs 34.10 lakhRs 30.64 lakh
229NARs 34.10 lakhRs 30.64 lakh
186NARs 33.83 lakhRs 30.37 lakh
-NARs 4.31 lakhRs 3.23 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGIRISH GOHIL
EngineerMd Anshari
EngineerRAJA GHOSH
Chartered AccountantShivkumar Associates
Chartered AccountantJB PATEL & ASSOCIATES
Chartered AccountantRSL & CO.
Chartered AccountantCHETAN S TAK & COMPANY
Chartered AccountantManish Ramawati and company
PartnerRole in project
DGAINS BHOOMI NIRMAAN LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000018723Dec 2023 → Dec 2026

Reason as filed by the promoterUnsold inventory

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Elegant Phase I - Q3 - Form 1_compressed.pdf22 Apr 2026
Withdrawal Update Form 2File: Elegant Phase I - Q3 - Form 2.pdf22 Apr 2026
Withdrawal Update Form 3File: Elegant Phase I - Q3 - Form 3.pdf22 Apr 2026
Withdrawal Update Form 1File: Elegant Phase I - Q2 - Form 1_compressed.pdf1 Apr 2026
Withdrawal Update Form 2File: Elegant Phase I - Q2 - Form 2.pdf1 Apr 2026
Withdrawal Update Form 3File: Elegant Phase I - Q2 - Form 3.pdf1 Apr 2026
Form 2A (FY 2024-2025)File: DGAINS - FORM 2A.pdf13 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 24-25.pdf7 Nov 2025
Form 1File: Architect Certificate - JUNE 24_compressed.pdf24 Sep 2025
Form 2File: Engineer Certificate - JUNE 24.pdf24 Sep 2025
Form 3File: FORM 3.pdf24 Sep 2025
Disclosure of Sold and Booked InventoryFile: sold unsold june 24.pdf24 Sep 2025
Form 1File: Architect Certificate June 25_compressed.pdf28 Jul 2025
Form 2File: Engineer Certificate June 25.pdf28 Jul 2025
Form 3File: CA Certificate June 25.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DISCLOSURE June 25.pdf28 Jul 2025
Self-declaration of Quarterly ProgressFile: Self-Declaration for Quaterly Progress.pdf28 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2024 Form 2 (A).pdf10 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-22 form 5.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf9 Jul 2024
CERSAI detailsFile: CERSAI.pdf9 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf9 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 20-21.pdf9 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf9 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf9 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf9 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf9 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 21-22.pdf9 Jul 2024
Proforma of Agreement for saleFile: Model_AFS.pdf9 Jul 2024
Details of encumbrances concerned to FinanceFile: No encumbrances Certificate.pdf8 Jul 2024
Details of encumbrances concerned to LegalFile: No encumbrances Certificate.pdf8 Jul 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf8 Jul 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC (1).pdf8 Jul 2024
Declaration in FORM BFile: Form B declaration PROMOTER.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -June 24.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Dec 23.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - March 24.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2- Dec 23.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - March 24.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - June 24.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD UNSOLD INVENTORY.pdf8 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations Jagdish Verma final.pdf8 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Separate bank details.pdf8 Jul 2024
Deviation Report with respect to Allotment letterFile: No Deviation from Allotment Letter.pdf8 Jul 2024
Deviation Report with respect to model copy of AgreementFile: no deviation from agreement for sale.pdf8 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: phase-1-2019-20.pdf6 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: phase-1-2020-21.pdf6 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: phase-1-2021-22.pdf6 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: phase-1-2022-23.pdf6 Jan 2024
Layout approvalFile: N A layout.pdf29 Jan 2020
Building plan approvalFile: N A OREDER.pdf29 Jan 2020
PAN CardFile: DBNL PAN CARD opt.pdf29 Jan 2020
Copy of the legal title reportFile: TITLE CERTIFICATE (ADVOCATE)_opt.pdf29 Jan 2020
Details of encumbrancesFile: encumbrances letter.pdf29 Jan 2020
Copy of Layout Approval (in case of layout)File: N A layout.pdf29 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: N A OREDER.pdf29 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: N A OREDER.pdf29 Jan 2020
Declaration in FORM BFile: form b affidavit_opt.pdf29 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GIRISH GOHIL 1st part_opt.pdf29 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GIRISH GOHIL 2nd part_opt.pdf29 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GIRISH GOHIL 3rd Part_opt.pdf29 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Md Anshari 1st part_opt.pdf29 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Md Anshari 2nd part_opt.pdf29 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Md Anshari 1st part_opt.pdf29 Jan 2020
Proforma of Allotment letterFile: Allotment letter.pdf29 Jan 2020
Proforma of Allotment letterFile: DRAFT AGREEMNT TWIN.pdf29 Jan 2020
Proforma of Allotment letterFile: DRAFT AGREEMNT ROW HOUSE.pdf29 Jan 2020
Proforma of Allotment letterFile: DRAFT AGREEMENT PREMIUM.pdf29 Jan 2020
Proforma of Allotment letterFile: DRAFT AGREEMENT 1 RK.pdf29 Jan 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
ELEGANTP52000009434Jambrung, RaigarhAug 2017Certificate SignedDec 2019Dec 2019

How this compares with Raigarh

48%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 36 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ELEGANT PHASE - I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HIREWADI5,900+ in Raigarh

2 kmELEGANT PHASE - ILapsed / revoked 3Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: DGAINS BHOOMI NIRMAAN LIMITED

DGAINS BHOOMI NIRMAAN LIMITED has 2 registrations on MahaRERA, including ELEGANT and ELEGANT PHASE - I. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ELEGANT PHASE - I is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ELEGANT PHASE - I?

The registered promoter entity is DGAINS BHOOMI NIRMAAN LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ELEGANT PHASE - I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ELEGANT PHASE - I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ELEGANT PHASE - I?

The professionals named in the filing: Architect: GIRISH GOHIL; Engineer: Md Anshari; Engineer: RAJA GHOSH; Chartered Accountant: Shivkumar Associates; Chartered Accountant: JB PATEL & ASSOCIATES; Chartered Accountant: RSL & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ELEGANT PHASE - I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ELEGANT PHASE - I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ELEGANT PHASE - I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.