Home / Browse projects / Mumbai Suburban, Maharashtra / Elanza

Completed No litigation declared Residential / Group Housing project

Elanza

By PRAVIN SATRA

RG-MH-27061 · RERA P51800007425 · Last updated on MahaRERA portal: 5 Oct 2021

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2019Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

Elanza is a Residential / Group Housing project by PRAVIN SATRA in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007425 on 17 Aug 2017. The registration is recorded completed; possession was promised by 31 Mar 2019. The completion date has moved by 15 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameElanza
  • TypeResidential / Group Housing
  • Location
    • Nehru Road
    • Vakola
    • Santacruz East
    • Andheri
    • Mumbai Suburban
    • 400055
  • Pincode400055
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007425
  • ReraGenie IDRG-MH-27061

Builder

  • NamePRAVIN SATRA
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2017First promiseDec 2017Revised toMar 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion31 Mar 2019
  • Revised completionRevised to 31 Mar 2019 (originally 31 Dec 2017)
  • Buildings1 building record
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ElanzaNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Oct 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Elanza: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Oct 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed92

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots92
Closed/Covered62
Open Space30

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,667 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shamik Enterprises Pvt LtdAndheriMumbai Suburban

Approvals and building plan

Permissible FSI6053.75
Proposed, not sanctioned6,054 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKadamgiri Complex, Hanuman Road, Vile Parle East Mumbai 400057

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s ESSAR Group
EngineerM/s Sura and Associates
PartnerRole in project
PRAVIN Viram SATRA-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800000203Dec 2017 → Mar 2019

Reason as filed by the promoterRequest for Extension: The Promoter has constructed sale building under DCR 33(10) having the wings both the wings are having 13th floors and to the no of flats 98 the construction of both the wings is completed and part occupation certificate has been obtaineddtd. 28.09.17 copy of which is uploaded along with this request. The OC of only three flats of B wing having no 101, 103 and 303 is yet to obtained. The handling any of possession of flats having OC is in progress. We are also in process of firming the legal entity of flat purchasers. For reasons request for execution of project completi

Litigation declared1

CaseCourtStatus
WPST/14592/2018/2018HIGH COURT OF BOMBAYFRESH ADMISSION

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000057147Ashutosh PaibhalePravin Satra06/12/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Elanza Society Registration Certificate.pdf5 Oct 2021
Details of encumbrancesFile: Encumbrances Piramal.pdf1 Jun 2018
Declaration in FORM BFile: Elanza Form-B Affidavit cum Declaration Piramal.PDF1 Jun 2018
Declaration in FORM BFile: Form- B Declaration Piramal.pdf1 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Elanza Arch Certif_M_2018.PDF1 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Elanza Eng Certif_M_2018_New.PDF1 Jun 2018
Certificates of CA (Form 3)File: Elanza_CA_M-2018.pdf1 Jun 2018
Certificates of Architect (Form 4)File: Form 4 Arch Certificate.PDF31 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch certificate elanza 2018.pdf19 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng CertifElanza 2018_New.PDF19 Mar 2018
Certificates of CA (Form 3)File: CA Certif 2018 Elanza.pdf19 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ELANZA ARCH Certi updated.pdf14 Nov 2017
Proforma of Allotment letterFile: RERA AGREEMENT FINAL Elanza.pdf31 Oct 2017
OtherFile: Part OC 1.PDF31 Oct 2017
OtherFile: Part OC Plan 1.pdf31 Oct 2017
OtherFile: Part OC plan 2.pdf31 Oct 2017
OtherFile: Part OC plan 3.pdf31 Oct 2017
OtherFile: Part OC plan 4.pdf31 Oct 2017
OtherFile: Part OC plan 5.pdf31 Oct 2017
OtherFile: Part OC plan 6.pdf31 Oct 2017
OtherFile: Part OC plan7.pdf31 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Elanza Final.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Cert for RERA Elanza new.pdf31 Jul 2017
Building plan approvalFile: IOD Plan 9.pdf29 Jul 2017
Building plan approvalFile: IOD Plan 8.pdf29 Jul 2017
Building plan approvalFile: IOD Plan 6.pdf29 Jul 2017
Building plan approvalFile: IOD Plan 7.pdf29 Jul 2017
Building plan approvalFile: IOD Plan 4.pdf29 Jul 2017
Building plan approvalFile: IOD Plan 5.pdf29 Jul 2017
Building plan approvalFile: IOD Plan 1.pdf29 Jul 2017
Building plan approvalFile: IOD Plan 2.pdf29 Jul 2017
Building plan approvalFile: IOD Plan 3.pdf29 Jul 2017
Layout approvalFile: IOD Plan 1.pdf29 Jul 2017
PAN CardFile: SHAMIK PAN NEW (1).pdf29 Jul 2017
PAN CardFile: Pan card copy of darshan developers.pdf29 Jul 2017
Copy of the legal title reportFile: Title certificate and DA.pdf29 Jul 2017
Details of encumbrancesFile: ENCUNBRANCES CRRTIFICATE.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: IOD Plan 1.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 1.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 2.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 3.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 4.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 5.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 6.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 7.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 8.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 9.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf29 Jul 2017
Declaration in FORM BFile: form B (1).pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Elanza- Architect Certiicate.pdf29 Jul 2017
Proforma of Allotment letterFile: Declaration for Agreement- Elanza.pdf29 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 15 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Elanza on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Santacruz East6,700+ in Mumbai Suburban

2 kmElanzaCompleted 113Lapsed / revoked 65Other 113Dot size: filed unitsN

Filed coordinates, straight-line distance. 291 registered projects within 2 km.

Builder: PRAVIN SATRA

PRAVIN SATRA has 1 registration on MahaRERA, including Elanza. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Elanza is delayed beyond 31 Mar 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Elanza?

The registered promoter entity is PRAVIN SATRA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Elanza?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Elanza?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Elanza?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Elanza?

The professionals named in the filing: Architect: M/s ESSAR Group; Engineer: M/s Sura and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Elanza?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Elanza. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Elanza to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.