Home / Browse projects / Pune, Maharashtra / ECO CITY

Registered No litigation declared Residential / Group Housing project

ECO CITY

By NAMRATA PROMOTERS AND BUILDERS

RG-MH-65772 · RERA P52100050644 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 2 months past the filed date
  • Completion date moved by 7 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2026Possession promised2 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0 of 95Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

ECO CITY is a Residential / Group Housing project by NAMRATA PROMOTERS AND BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100050644 on 21 Apr 2023. Possession was promised by 30 Aug 2026 and is now 2 months past that date. The completion date has moved by 7 months from the original filing. 95 of the 95 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameECO CITY
  • TypeResidential / Group Housing
  • Location
    • Talegaon varale road
    • Near D Y patil college
    • Varale
    • Mawal
    • Pune
    • 410507
  • Pincode410507
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050644
  • ReraGenie IDRG-MH-65772

Builder

  • NameNAMRATA PROMOTERS AND BUILDERS
  • Entity typePartnership
  • GSTIN27AABFN1737A1ZS
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerJAY SHAILESH SHAH
  • Other registrations1 more →
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

2 months past promisethis monthRegisteredApr 2023First promiseJan 2026Revised toAug 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Apr 2023
  • Promised completion30 Aug 2026
  • Revised completionRevised to 30 Aug 2026 (originally 30 Jan 2026)
  • Buildings1 building record
  • Documents filed98 files

Current status

100%95 of 95 units booked
100.0%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B6 BuildingNA131295095

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

B6 Building: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes70%
Street LightingYes80%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes66%
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes70%
Open ParkingNoNot applicable

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered15

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,232 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jul 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority, Pune
Permissible FSI4499.06
Proposed, not sanctioned4,499 sq m
Buildings approved3
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCTS NO 93,BY B PLOT NO 8SENAPATI BAPAT RD,PUNE,411016
Estimated costRs 12.29 cr
Cost incurredRs 12.29 cr
Work done100.0%
BuildingWingEstimatedIncurred
B6 BuildingNARs 11.37 crRs 11.37 cr
-NARs 92.19 lakhRs 92.19 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLaxman Thite AOP
EngineerSumant Chorey
EngineerSanjivani Ade
Chartered AccountantSSAP & Associates LLP
PartnerRole in project
NAMRATA PROMOTERS AND BUILDERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA31032620501Jan 2026 → Aug 2026

Reason as filed by the promoterWe would like to inform you that the construction work of Eco City (B6 Building) has been 100% completed. We have already applied for the Occupancy Certificate (OC) with the planning authority, i.e., PMRDA. However, as of today, we have not yet received the Occupancy Certificate. We are expecting to receive the same on or before 30 April 2026. In view of the above, we kindly request you to grant us an extension for submitting the Occupancy Certificate and completing the RERA process.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Apr 2023

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A_March 2026_Eco City B6 BLDG.pdf18 Jul 2026
Form 2A (FY 2026-2027)File: Form 2A_March 2027_Eco City B6 BLDG.pdf18 Jul 2026
Form 5 (FY 2025-2026)File: Form 5_March 2026_Eco City B6 BLDG.pdf18 Jul 2026
Withdrawal Update Form 1File: Eco City B6 BLDG_Form 1_30062026.pdf17 Jul 2026
Withdrawal Update Form 2File: Eco CIty B6 BLDG_Form 2_30062026.pdf17 Jul 2026
Withdrawal Update Form 3File: Eco City B6 BLDG_Form3_300062026.pdf17 Jul 2026
Withdrawal Update Form 1File: Eco City B6 Form 1_Signed.pdf28 Mar 2026
Withdrawal Update Form 2File: Form 2_Eco City B6 BLDG.pdf28 Mar 2026
Withdrawal Update Form 3File: NPB B6 BLDG_Form 3.pdf28 Mar 2026
Withdrawal Update Form 1File: Eco City_Form 1_Dec 2025.pdf13 Jan 2026
Withdrawal Update Form 2File: Eco City_Form 2_Dec 2025.pdf13 Jan 2026
Withdrawal Update Form 3File: Eco City_Form 3_Dec 2025.pdf13 Jan 2026
Withdrawal Update Form 1File: Eco CIty B6 BLDG_Form 1_Sept 2025.pdf17 Oct 2025
Withdrawal Update Form 2File: Eco CIty B8 BLDG_Form 2_Sept 2025.pdf17 Oct 2025
Withdrawal Update Form 3File: Eco City B6 BLDG_Form 3_Sept 2025.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: NPB Eco City Form 5_2024_25.pdf6 Oct 2025
Withdrawal Update Form 1File: Eco CIty_Architect certificate_form 1_30062025.pdf10 Jul 2025
Withdrawal Update Form 2File: Eco City Form2_Signed_30062025.pdf10 Jul 2025
Withdrawal Update Form 3File: Eco CIty B6 BLDG_CA Certiticate_Form 3_30062025.pdf10 Jul 2025
Form 119 Jun 2025
Form 219 Jun 2025
Form 3File: 9 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory (1).pdf19 Jun 2025
Form 2A (FY 2024-2025)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (1).pdf19 Jun 2025
Form 2A (FY 2023-2024)File: 5.pdf19 Jun 2025
Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf19 Jun 2025
Disclosure of sold/ booked inventoryFile: Eco CIty B6 BLDG_Information of sold_booked Inventory.pdf25 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Eco City B6 BLDG_Form 2A_2024-25.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco City Form 1_March 2025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Eco City Form 3_March 2025.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eco City Form 2_March 2025.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Eco City B6 BLDG_Declaration of sold_unsold inventory.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NPB B6 BLDG_CA Certificate_Dec 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NPB B6 BLDG_Engg Certificate_Dec 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco City B6 BLDG_Architect Cert_Dec 2024.pdf13 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Namrata Promoters and Builders.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B6 BLDG_Form 3 _Signed_30092024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B6 BLDG_Form 2_Signed_30092024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NPB B6 BLDG_Form 1_Sept 2024 Signed.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eco CIty B6_Form2_30062024_Signed.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Eco city B6_Form3_30062024_Signed.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NPB_B6 BLDG_Form1_June 2024_Signed.pdf5 Jul 2024
Building plan approvalFile: Plan2_compressed.pdf8 May 2024
Building plan approvalFile: Plan3_compressed.pdf8 May 2024
Building plan approvalFile: Plan4_compressed.pdf8 May 2024
Building plan approvalFile: Plan8_compressed.pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan2_compressed.pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan3_compressed.pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan4_compressed.pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan8_compressed.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aquagem_Engg Certificate_MArch 2024.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eco CIty_Engg Cert_March 2024_Signed.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Eco CIty_March 2024_Signed.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2430_001.pdf10 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: NPB Eco City Form 2A_2023_24.pdf5 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Namrata Eco City Engg Certificate_Dec 2023.pdf20 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NPB_ECO CITY_RERA_31122023 SIGNED.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NPB Architect Certificate_Dec 2023.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eco City_Engg certificate_Sept 2023_compressed.pdf24 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Eco CIty B6 BLDG CA Certificate_Sept 2023.pdf24 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco city Rera Certificate_Sept 2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eco City Engineering certificate_June 2023.pdf16 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NPB_ECO CITY_RERA_30062023.pdf16 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NPB Rera Architect Certificate Form1_June 2023.pdf5 Aug 2023
Layout approvalFile: Plan 1_17042023.pdf17 Apr 2023
Copy of Layout Approval (in case of layout)File: Plan 1_17042023.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NPB Architect certificate Form1.pdf17 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Eco City B6 BLDG Plinth Completion Certificate.pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NPB_CA Certificate_06042023.pdf6 Apr 2023
CERSAI detailsFile: CERSAI Report_29032023.pdf29 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report AGS_17032023.pdf18 Mar 2023
Proforma of Agreement for saleFile: Draft Agr to Sell_Eco City_17032023.pdf17 Mar 2023
Declaration about Commencement CertificateFile: Declaration abour commenement certificate_New.pdf13 Mar 2023
Layout approvalFile: Plan1_Highlighted.pdf9 Mar 2023
Copy of Layout Approval (in case of layout)File: Plan1_Highlighted.pdf9 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Dicslosure_compressed.pdf23 Feb 2023
Layout approvalFile: RERA requirement B6 BLDG.pdf20 Feb 2023
Copy of Layout Approval (in case of layout)File: RERA requirement B6 BLDG.pdf20 Feb 2023
Proforma of Allotment letterFile: Allotment letter Draft_Eco City_compressed.pdf15 Feb 2023
Copy of the legal title reportFile: Ecocity_RERA_Legal_Title_Report_Compressed.pdf13 Feb 2023

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 7 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ECO CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near D Y patil college13,700+ in Pune

2 kmECO CITYCompleted 30Lapsed / revoked 17Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 80 registered projects within 2 km.

Builder: NAMRATA PROMOTERS AND BUILDERS

NAMRATA PROMOTERS AND BUILDERS has 2 registrations on MahaRERA, including ECO CITY and Eco Shoppy 2.0. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ECO CITY is delayed beyond 30 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ECO CITY?

The registered promoter entity is NAMRATA PROMOTERS AND BUILDERS, a partnership as per the filing. Its GSTIN 27AABFN1737A1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ECO CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ECO CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ECO CITY?

The professionals named in the filing: Architect: Laxman Thite AOP; Engineer: Sumant Chorey; Engineer: Sanjivani Ade; Chartered Accountant: SSAP & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ECO CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ECO CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ECO CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.