Home / Browse projects / Mumbai Suburban, Maharashtra / Eastern Groves Phase 2

Registered No litigation declared Others project

Eastern Groves Phase 2

By VL SAVLI DEVELOPERS LLP

RG-MH-05421 · RERA P51800051916 · Last updated on MahaRERA portal: 24 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
1 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 80%
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

Eastern Groves Phase 2 is a Others project by VL SAVLI DEVELOPERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051916 on 13 Jul 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameEastern Groves Phase 2
  • TypeOthers
  • Location
    • KANNAMWAR NAGAR 1
    • VIKHROLI EAST
    • Hariyali
    • Kurla
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800051916
  • ReraGenie IDRG-MH-05421

Builder

  • NameVL SAVLI DEVELOPERS LLP
  • Entity typePartnership
  • PartnersAmit Ajit Pangam, Aditya Ramdas Sangle, Ramdas Maruti Sangle, Anita Ramdas Sangle
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jul 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Eastern Groves Wing ANA240000
Eastern Groves Wing BNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 80%.

Eastern Groves Wing A13%
ActivityProgress
Excavation100%
Basement (if any)20%
Podiums (if any)0%
Plinth20%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Eastern Groves Wing B7%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed97

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots97
Closed/Covered97
BuildingClosed/CoveredTotal
Eastern Groves Wing A5252
Eastern Groves Wing B4545

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,451 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Kannamwar Nagar Savli CHSLHariyaliMumbai Suburban

Approvals and building plan

Sanctioning authorityBuilding Permission Cell, Greater Mumbai / MHADA
Permissible FSI16524.0
Proposed, not sanctioned11,524 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLBS Marg VIKHROLI WEST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEllora Consultant
EngineerAjay Mahale
Chartered AccountantKapure and Kapure Chartered Accountants
PartnerRole in project
VL SAVLI DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory 30 09 2023.pdf24 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory 31 12 2023.pdf24 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory 31 03 2024.pdf24 Jul 2025
Disclosure of sold/ booked inventoryFile: Discolsure of Sold Inventory 30 06 2024.pdf24 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory 30 09 2024.pdf24 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VL Savli Phase II Sep23 Q2.pdf23 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VL SAVLI PHASE II Dec 23 Q3.pdf23 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vl savli II Mar24 Q4.pdf23 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vl Savli Phase II June24 Q1.pdf23 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vl Savli Phase II Sept24 Q2.pdf23 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate Q3.PDF21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Phase II Q2.PDF21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Phase II Q3.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Phase II Q4.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Phase II Q1-2024 2025.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Phase II Q2 2024 2025.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Phase II Q3 2024 2025.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Phase II Q4 2024 2025.pdf21 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 VL Savli Sep 23 Q2.pdf21 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FOR EASTERN GROVES PHASE II June-2024.pdf20 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FOR EASTERN GROVES PHASE II Sept-2024.pdf20 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate_08-12-2022 (1) (1).PDF16 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate_ 04-03-2024 Phase II 30-09-2023.PDF16 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate_ 14-06-2024 Phase II 31-12-2023.pdf16 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate_ 31-12-2024.pdf16 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-09-2024.PDF16 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Phase II 31-03-2025.pdf16 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FOR EASTERN GROVES PHASE II 02-03-2024.pdf16 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FOR EASTERN GROVES PHASE II 30 SEP 2023.pdf16 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FOR EASTERN GROVES PHASE II 17-06-2024.pdf16 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FOR EASTERN GROVES PHASE II MARCH 2024.pdf16 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - VL SAVLI PHASE II Dec 23.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Vl savli II Mar 24.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vl Savli - June 24.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vl Savli - Sept 24_signed.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 - Vl Savli_compressed.pdf8 Mar 2024
Proforma of Agreement for saleFile: Agreement for Sale Eastern Groves_10072023.pdf10 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report Easten100723 1 to 10.pdf10 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report Easten 100723 11 to 22.pdf10 Jul 2023
Declaration about Commencement CertificateFile: Declaration About Commencemnt Certificate.pdf29 Jun 2023
CERSAI detailsFile: Cersai Report Eastern Groves Phase 2.pdf29 Jun 2023
Other - TechnicalFile: Explanation about FSI - Eastern Groves Phase 2.pdf29 Jun 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf21 Jun 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf21 Jun 2023
Details of encumbrances concerned to FinanceFile: DECLARATION OF ENCUMBRANCES.pdf20 Jun 2023
Details of encumbrances concerned to LegalFile: DECLARATION OF ENCUMBRANCES.pdf20 Jun 2023
Other - LegalFile: EXP ABOUT AREA OF PROJECT.pdf20 Jun 2023
Other - FinanceFile: EXPLAINATION FOR CERSAI REPORT.pdf20 Jun 2023
Other - TechnicalFile: EXP ABOUT AREA OF PROJECT.pdf20 Jun 2023
Other - TechnicalFile: Declaration parking.pdf20 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - signed-1-9_compressed.pdf13 Jun 2023
Other - LegalFile: Non Negotiable Clauses.pdf12 Jun 2023
Copy of the legal title reportFile: Legal Title Report - Phase II Revised 2-1-5.pdf9 Jun 2023
Copy of the legal title reportFile: Legal Title Report - Phase II Revised 2-6-9.pdf9 Jun 2023
Copy of the legal title reportFile: Legal Title Report - Phase II Revised 2-10-12.pdf9 Jun 2023
Copy of the legal title reportFile: Legal Title Report - Phase II Revised 2-13-16.pdf9 Jun 2023
Building plan approvalFile: 2nd Floor Plan marked.pdf7 Jun 2023
Building plan approvalFile: 16th-21st Plan marked.pdf7 Jun 2023
Building plan approvalFile: 1st Floor Plan marked.pdf7 Jun 2023
Building plan approvalFile: 2nd Floor Plan marked.pdf7 Jun 2023
Building plan approvalFile: 3rd-7th,9th-14th Plan_marked.pdf7 Jun 2023
Building plan approvalFile: 8th,15th Plan marked.pdf7 Jun 2023
Building plan approvalFile: 16th-21st Plan marked.pdf7 Jun 2023
Building plan approvalFile: 22nd,23rd Plan marked_compressed.pdf7 Jun 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Legal revised.pdf7 Jun 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Legal revised.pdf7 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 1st Floor Plan marked.pdf7 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 2nd Floor Plan marked.pdf7 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 3rd-7th,9th-14th Plan_marked.pdf7 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 8th,15th Plan marked.pdf7 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 16th-21st Plan marked.pdf7 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 22nd,23rd Plan marked_compressed.pdf7 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 2nd Floor Plan marked.pdf7 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 16th-21st Plan marked.pdf7 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank account latest.pdf17 May 2023
Declaration in FORM BFile: Affidavit - Developer.pdf11 May 2023
Commencement Certificates / NA Order for plotted developmentFile: SAVLI FULL CC for C,D,E,F Wing and PLINTH CC FOR A and B Wing 17 Jun 2022_compressed.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI_VL Savli Phase 1A_Aditya Sangle.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI_VL Savli Phase 1A_Amit Pangam.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI_VL Savli Phase 1A_Anita Sangle.pdf4 May 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Eastern Groves Phase 1BP51800028289Vikhroli East, Mumbai Suburban190Feb 2021OngoingJun 2027Not due yet
Eastern Groves Phase 1AP51800028005Vikhroli East, Mumbai Suburban189Jan 2021OngoingJun 2027Not due yet

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Eastern Groves Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIKHROLI EAST6,700+ in Mumbai Suburban

2 kmEastern Groves Phase 2Completed 46Lapsed / revoked 18Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 97 registered projects within 2 km.

Builder: VL SAVLI DEVELOPERS LLP

VL SAVLI DEVELOPERS LLP has 3 registrations on MahaRERA, including Eastern Groves Phase 1A and Eastern Groves Phase 1B. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Eastern Groves Phase 2 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Eastern Groves Phase 2?

The registered promoter entity is VL SAVLI DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Eastern Groves Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Eastern Groves Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Eastern Groves Phase 2?

The professionals named in the filing: Architect: Ellora Consultant; Engineer: Ajay Mahale; Chartered Accountant: Kapure and Kapure Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Eastern Groves Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Eastern Groves Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Eastern Groves Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.