ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Eastern Groves Phase 1A

Registered No litigation declared Others project

Eastern Groves Phase 1A

By VL SAVLI DEVELOPERS LLP

RG-MH-29156 · RERA P51800028005 · Last updated on MahaRERA portal: 28 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
56 of 189Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Eastern Groves Phase 1A is a Others project by VL SAVLI DEVELOPERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028005 on 25 Jan 2021. Possession is promised by 30 Jun 2027. 133 of the 189 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameEastern Groves Phase 1A
  • TypeOthers
  • Location
    • Kannamwar Nagar
    • Vikhroli East
    • Kurla
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • RERA no.P51800028005
  • ReraGenie IDRG-MH-29156

Builder

  • NameVL SAVLI DEVELOPERS LLP
  • Entity typePartnership
  • PartnersAmit Ajit Pangam, Aditya Ramdas Sangle, Ramdas Maruti Sangle, Anita Ramdas Sangle
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2021PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2021
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed68 files

Current status

70%133 of 189 units booked

Figures as on 28 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ENA252588795
Wing FNA252589594

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

Wing E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing F0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed62

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots62
Closed/Covered62
BuildingClosed/CoveredTotal
Wing E2020
Wing F4242

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,451 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jul 2025
LandownerVillageDistrict
Kannamwar nagar savli chs ltdKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityBuilding Permission Cell, Greater Mumbai/ MHADA
Permissible FSI10500.0
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIKHROLI WEST

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJitendra Dewoolkar
ArchitectEllora Project Consultant Pvt.Ltd
EngineerAjay Mahale
Chartered AccountantNarendra KADAV
Chartered AccountantV.C.Shah & Co.
Chartered AccountantKapure & Kapure Chartered Accountant
PartnerRole in project
VL SAVLI DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Architect Certificate Sept 2022 Q2.pdf28 Jul 2025
Form 2File: Form 2 Eng Certificate VL Savli Phase 1A Sept 2022 Q2.pdf28 Jul 2025
Form 3File: Form 3 VL Savli Phase 1A Sept 2022 Q2.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold unsold Savli Phase 1A Sept 2022 Q2.pdf28 Jul 2025
Form 1File: Form 1 Architect Certificate Dec 2022 Q3.PDF28 Jul 2025
Form 2File: Form 2 Eng Certificate VL Savli Phase 1A Dec 2022 Q3.pdf28 Jul 2025
Form 3File: Form 3 VL Savli Phase 1A Dec 2022 Q3.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold unsold Savli Phase 1A Dec 2022 Q3.pdf28 Jul 2025
Form 1File: Form 1 Architect Certificate March 2023 Q4.pdf28 Jul 2025
Form 2File: Form 2 Eng Certificate VL Savli Phase 1A March 2023 Q4.pdf28 Jul 2025
Form 3File: Form 3 VL Savli Phase 1A March 2023 Q4.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold unsold Savli Phase 1A March 2023 Q4.pdf28 Jul 2025
Form 1File: Form 1 Architect Certificate June 2023 Q1.pdf28 Jul 2025
Form 2File: Form 2 Eng Certificate VL Savli Phase 1A June 2023 Q1.pdf28 Jul 2025
Form 3File: Form 3 VL Savli Phase 1A June 2023 Q1.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold unsold Savli Phase 1A June 2023 Q1.pdf28 Jul 2025
Form 1File: Form 1 Architect Certificate Sept 2023 Q2.pdf28 Jul 2025
Form 2File: Form 2 Eng Certificate VL Savli Phase 1A Sept 2023 Q2.pdf28 Jul 2025
Form 3File: Form 3 VL Savli Phase 1A Sept 2023 Q2.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold unsold Savli Phase 1A Sept 2023 Q2.pdf28 Jul 2025
Form 1File: Form 1 Architect Certificate Dec 2023 Q3.pdf28 Jul 2025
Form 2File: Form 2 Eng Certificate VL Savli Phase 1A Dec 2023 Q3.pdf28 Jul 2025
Form 3File: Form 3 VL Savli Phase 1A Dec 2023 Q3.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold unsold Savli Phase 1A Dec 2023 Q3.pdf28 Jul 2025
Form 1File: Form 1 Architect Certificate March 2024 Q4.pdf28 Jul 2025
Form 2File: Form 2 Eng Certificate VL Savli Phase 1A March 2024 Q4.pdf28 Jul 2025
Form 3File: Form 3 VL Savli Phase 1A March 2024 Q4.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold unsold Savli Phase 1A March 2024 Q4.pdf28 Jul 2025
Form 1File: Form 1 Architect Certificate June 2024 Q1..pdf28 Jul 2025
Form 2File: Form 2 Eng Certificate VL Savli Phase 1A June 2024 Q1.pdf28 Jul 2025
Form 3File: Form 3 VL Savli Phase 1A June 2024 Q1.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold unsold Savli Phase 1A June 2024 Q1.pdf28 Jul 2025
Form 1File: Form 1 Architect Certificate Sept 2024 Q2.pdf28 Jul 2025
Form 2File: Form 2 Eng Certificate VL Savli Phase 1A Sept 2024 Q2.pdf28 Jul 2025
Form 3File: Form 3 VL Savli Phase 1A Sept 2024 Q2.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold unsold Savli Phase 1A Sept 2024 Q2.pdf28 Jul 2025
Form 1File: Form 1 Architect Certificate Savli Phase Dec24 Q3.pdf24 Jul 2025
Form 2File: Form 2 Savli Phase 1A 31 Dec 2024.pdf24 Jul 2025
Form 3File: Form 3 Savli Phase 1A Dec 24 Q3.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: 1A sold unsold Dec-2024 Q3.pdf24 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 V L Savli Eastern Group Phase 1A Nov 20.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 1A - Jun 21_compressed.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 1A - Sep 21_compressed.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Eastern phase 1A - mar 22_compressed.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Eastern 1A - jun 22_compressed.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase -1A Sep 22_compressed.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase -1A Dec 22_compressed.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 1A March 2023_compressed.pdf29 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI_VL Savli Phase 1A_Aditya Sangle.pdf20 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI_VL Savli Phase 1A_Amit Pangam.pdf20 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI_VL Savli Phase 1A_Ramdas M Sangle.pdf20 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI_VL Savli Phase 1A_Anita Sangle.pdf20 Apr 2023
CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200213679421_For_Registration_Of_Security_Interest_10_05_202119 Apr 2023
CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200213679427_For_Registration_Of_Security_Interest_10_05_202119 Apr 2023
CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200213871509_For_Registration_Of_Security_Interest_10_05_202119 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Rera Bank Declaration_VL Savli Phase 1A.pdf18 Mar 2023
Details of encumbrancesFile: ENCUMBRANCES LETTER.pdf5 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Savli CHSL PLINTH CC 18 Jan 2021.pdf18 Jan 2021
Building plan approvalFile: zero FSI IOA PLAN.PDF26 Dec 2020
Layout approvalFile: IOA Plan1.pdf26 Dec 2020
PAN CardFile: vl savli pan card.pdf26 Dec 2020
Copy of the legal title reportFile: Title Report Final (1)_compressed.pdf26 Dec 2020
Details of encumbrancesFile: Details of Encumbrance.pdf26 Dec 2020
Copy of Layout Approval (in case of layout)File: IOA Plan1.pdf26 Dec 2020
Building Plan Approval / NA Order for plotted developmentFile: zero FSI IOA PLAN.PDF26 Dec 2020
Declaration in FORM BFile: Form B Developer_compressed.pdf26 Dec 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form B Developer_compressed.pdf26 Dec 2020
Proforma of Allotment letterFile: Declaration (2).pdf26 Dec 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Eastern Groves Phase 1BP51800028289Vikhroli East, Mumbai Suburban190Feb 2021OngoingJun 2027Not due yet

How this compares with Mumbai Suburban

70%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Eastern Groves Phase 1A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vikhroli East6,700+ in Mumbai Suburban

Builder: VL SAVLI DEVELOPERS LLP

VL SAVLI DEVELOPERS LLP has 3 registrations on MahaRERA, including Eastern Groves Phase 1A and Eastern Groves Phase 1B. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Eastern Groves Phase 1A is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Eastern Groves Phase 1A?

The registered promoter entity is VL SAVLI DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Eastern Groves Phase 1A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Eastern Groves Phase 1A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Eastern Groves Phase 1A?

The professionals named in the filing: Architect: Jitendra Dewoolkar; Architect: Ellora Project Consultant Pvt.Ltd; Engineer: Ajay Mahale; Chartered Accountant: Narendra KADAV; Chartered Accountant: V.C.Shah & Co.; Chartered Accountant: Kapure & Kapure Chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Eastern Groves Phase 1A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Eastern Groves Phase 1A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Eastern Groves Phase 1A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.