Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
2 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 90%
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

Earth Terrace is a Residential / Group Housing project by M/s. Earth Graphics in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51900004900 on 9 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameEarth Terrace
  • TypeResidential / Group Housing
  • Location
    • Gajanan Colony Road
    • Goregaon
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900004900
  • ReraGenie IDRG-MH-11408

Builder

  • NameM/s. Earth Graphics
  • Entity typeOthers
  • PartnersBhupesh Babulal Jain, Bharat Babulal Jain
  • Named personsBhupesh Babulal Jain, Bharat Babulal Jain, Earth Corporation Limited
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • Buildings3 building records
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA270000
B WingNA250000
C WingNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Mar 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

A Wing46%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)80%
Plinth80%
Stilt Floor80%
Slabs of Super Structure48%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B Wing26%
ActivityProgress
Excavation80%
Basement (if any)80%
Podiums (if any)10%
Plinth80%
Stilt Floor0%
Slabs of Super Structure23%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C Wing45%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 18 Mar 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Swiming PoolYes0%
Fitness CentreYes0%

Parking filed164

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots164
Closed/Covered118
Open Space46

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,183 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI19747.95
Proposed, not sanctioned19,748 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchState Bank of india commercial branch B N Agrawal Market Shyam Kamal Trade Center Ville Parle East M

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRasik P Hingoo Associates
EngineerStruct Bombay Consultants
Chartered AccountantSanket R Shah
Chartered AccountantAMIT D SHETH
PartnerRole in project
M/s. Earth Graphics-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800001121Dec 2019 → Dec 2020

Reason as filed by the promoterThe reason for delay of completion is earlier pending litigation related to construction of project and project are on hold and now just short out the litigation and also some financial crises, therefore we have require to extend our proposed completion date of project

Litigation declared3

CaseCourtStatus
126/2015Court Of Small Causes Bandra Branch MumbaiPending
367/2014Court Of Small Causes Bandra Branch MumbaiPending
326/2015Court Of Small Causes Bandra Branch MumbaiPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 May 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Mar 2021

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: FORM_III_DEC-20 - EARTH TERRACE.pdf18 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Earth Terrace Form V March-19_compressed.pdf18 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Earth Terrace Form V March-20_compressed.pdf18 Mar 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_signed.pdf18 Mar 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form-4 Architects Certificate Hingo.pdf18 Mar 2021
Details of encumbrancesFile: Declaration of Encumbrances - Eath Terrace.pdf3 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: Full CC.pdf12 May 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_compressed.pdf20 May 2019
Certificates of CA (Form 5)File: Certificate of CA Form-5.pdf22 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT LETTER.pdf8 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 30-09-2017.pdf8 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 31-12-2017.pdf8 Feb 2018
Certificates of CA (Form 3)File: CA CERTIFICATE 30-09-2017.pdf8 Feb 2018
Certificates of CA (Form 3)File: CA CERTIFICATE 31-12-2017.pdf8 Feb 2018
Commencement Certificates / NA Order for plotted developmentFile: 2098856_furthercc_signed GOREGAON.pdf25 Nov 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 29-07-2017.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Earth Terrace Groegaon Engineers Certificate.pdf29 Jul 2017
Certificates of CA (Form 3)File: EARTH TERRACE CA CERTIFICATE.pdf29 Jul 2017
Proforma of Allotment letterFile: Agreement for sale goregaon-ilovepdf-compressed.pdf29 Jul 2017
Layout approvalFile: Layout Plan- 178KB.pdf27 Jul 2017
Building plan approvalFile: MYSCAN_20170721_0007.pdf27 Jul 2017
Building plan approvalFile: MYSCAN_20170721_0008.pdf27 Jul 2017
Building plan approvalFile: MYSCAN_20170721_0009.pdf27 Jul 2017
Building plan approvalFile: MYSCAN_20170721_0004-894 KB.pdf27 Jul 2017
Building plan approvalFile: MYSCAN_20170721_0005.pdf27 Jul 2017
Building plan approvalFile: MYSCAN_20170721_0006- 190KB.pdf27 Jul 2017
Building plan approvalFile: First IOD Dated 30 jul 2014.pdf27 Jul 2017
Building plan approvalFile: Final IOD.pdf27 Jul 2017
Building plan approvalFile: Layout Plan- 178KB.pdf27 Jul 2017
Building plan approvalFile: MYSCAN_20170721_0002.pdf27 Jul 2017
Building plan approvalFile: MYSCAN_20170721_0003.pdf27 Jul 2017
Building plan approvalFile: MYSCAN_20170721_0010- 886KB.pdf27 Jul 2017
Building plan approvalFile: MYSCAN_20170721_0014.pdf27 Jul 2017
Building plan approvalFile: MYSCAN_20170721_0015- 124KB.pdf27 Jul 2017
Building plan approvalFile: MYSCAN_20170721_0011- 169 KB.pdf27 Jul 2017
Building plan approvalFile: MYSCAN_20170721_0012- 253KB.pdf27 Jul 2017
Building plan approvalFile: MYSCAN_20170721_0013.pdf27 Jul 2017
PAN CardFile: EARTH GRAPHICS PAN CARD.pdf27 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf27 Jul 2017
Details of encumbrancesFile: encumbrances.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan- 178KB.pdf27 Jul 2017
Building Plan Approval (IOD)File: First IOD Dated 30 jul 2014.pdf27 Jul 2017
Building Plan Approval (IOD)File: Final IOD.pdf27 Jul 2017
Building Plan Approval (IOD)File: Layout Plan- 178KB.pdf27 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170721_0002.pdf27 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170721_0003.pdf27 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170721_0004-894 KB.pdf27 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170721_0005.pdf27 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170721_0006- 190KB.pdf27 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170721_0007.pdf27 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170721_0008.pdf27 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170721_0009.pdf27 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170721_0010- 886KB.pdf27 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170721_0011- 169 KB.pdf27 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170721_0012- 253KB.pdf27 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170721_0013.pdf27 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170721_0014.pdf27 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170721_0015- 124KB.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf27 Jul 2017
Declaration in FORM BFile: Affidavit Signed 600KB.pdf27 Jul 2017
OtherFile: Airport Authority.pdf27 Jul 2017
OtherFile: Fire NOC.pdf27 Jul 2017
OtherFile: Traffic NOC.pdf27 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Earth Galaxy163 A Dr BA Road Dadar Mumbai 40001421CompletedApr 2014Apr 2014
Earth Pillar22 24B Junction of khadilkar road and sadashiv cross road girgaum mumbai 40000454CompletedNov 2012Late, Apr 2015
Earth View12th Khetwadi Back Road Girgaon Mumbai 40000445CompletedAug 2012Aug 2012

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Earth Terrace on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Goregaon6,700+ in Mumbai Suburban

2 kmEarth TerraceCompleted 135Lapsed / revoked 62Other 139Dot size: filed unitsN

Filed coordinates, straight-line distance. 336 registered projects within 2 km.

Builder: M/s. Earth Graphics

M/s. Earth Graphics has 3 registrations on MahaRERA, including Earth Darshan and Earth Terrace. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Earth Terrace is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Earth Terrace?

The registered promoter entity is M/s. Earth Graphics, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Earth Terrace?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Earth Terrace?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Earth Terrace?

The professionals named in the filing: Architect: Rasik P Hingoo Associates; Engineer: Struct Bombay Consultants; Chartered Accountant: Sanket R Shah; Chartered Accountant: AMIT D SHETH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Earth Terrace?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Earth Terrace. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Earth Terrace to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.