Registered No litigation declared Residential / Group Housing project

Earth Residency Wing C and Wing D

By Earth Estate Developers Pvt Ltd

RG-MH-21022 · RERA P51800005913 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 67 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedmoved 67 months from the original
2 of 11Construction stages donefurthest along: Podiums (if any), 0%
229 of 229Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Earth Residency Wing C and Wing D is a Residential / Group Housing project by Earth Estate Developers Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005913 on 14 Aug 2017. Possession is promised by 31 Mar 2029. The completion date has moved by 67 months from the original filing. 0 of the 229 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameEarth Residency Wing C and Wing D
  • TypeResidential / Group Housing
  • Location
    • 0
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800005913
  • ReraGenie IDRG-MH-21022

Builder

  • NameEarth Estate Developers Pvt Ltd
  • Entity typeCompany
  • Managing DirectorsBhupesh Jain, Bharat Jain
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2017First promiseAug 2023Revised toMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2017
  • Promised completion31 Mar 2029
  • Revised completionRevised to 31 Mar 2029 (originally 28 Aug 2023)
  • Buildings1 building record
  • Documents filed75 files

Current status

0%0 of 229 units booked
14.6%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing C and Wing DNA39372290229

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Wing C and Wing D: 18% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed252

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots252
Closed/Covered232
Open Space20

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,707 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Nov 2025

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI11386.31
Proposed, not sanctioned3,122 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShastri Hall 292 Tardeo Road Tardeo Mumbai 400007
Estimated costRs 68.69 cr
Cost incurredRs 10.01 cr
Work done14.58%
BuildingWingEstimatedIncurred
Wing C and Wing DNARs 65.69 crRs 10.01 cr
-NARs 3.00 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnish Chouhan
EngineerSura & Associates
EngineerHEMENDRA BIDAMIA
Chartered AccountantMEGHAL JAIN & ASSOCIATES
PartnerRole in project
Earth Estate Developers Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800016479Aug 2023 → Mar 2029

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 31/03/2029

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: earth estate form 1 September 25.pdf21 May 2026
Withdrawal Update Form 1File: Earth estate form 1 december.pdf21 May 2026
Withdrawal Update Form 2File: Estate form -2 September 2025.pdf21 May 2026
Withdrawal Update Form 2File: Estate form-2 December 2025.pdf21 May 2026
Withdrawal Update Form 3File: Earth estate form 3 september 25.pdf21 May 2026
Withdrawal Update Form 3File: Earth estate form 3 december 25.pdf21 May 2026
Withdrawal Update Form 1File: Estate form-1 June 2025.pdf6 May 2026
Withdrawal Update Form 2File: Estate form-2 June 2025.pdf6 May 2026
Withdrawal Update Form 3File: earth estate form 3 june 25.pdf6 May 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 Earth Estate Developers.pdf22 Jan 2025
Certificates of CA (Form 3)File: Form - 3 earth Estate.pdf22 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Estate dec 2024.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Earth Estate Form 5.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Earth Estate Form 5.pdf21 Nov 2024
Certificates of CA (Form 3)File: Form -3 Earth Estate Developers Pvt Ltd.pdf30 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf29 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf12 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf12 Aug 2024
Certificates of CA (Form 3)File: form 3.pdf12 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 (4).pdf10 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: E Estate Form-2.pdf10 May 2024
Certificates of CA (Form 3)File: E Estate Developers Form3.pdf10 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: E Estate Dev Pvt Ltd Form 5 ( 01-04-2022 To 31-03-2023).pdf4 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 architect certificate DEC 2023.pdf16 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 engineer certificate DEC 2023.pdf16 Jan 2024
Certificates of CA (Form 3)File: Form 3 ca certificate DEC 2023.pdf16 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Estate form 1.pdf14 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Earth Estate FORM 2.pdf14 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booked Inventory.pdf14 Oct 2023
Certificates of CA (Form 3)File: E Estate Developer Pvt Ltd Form-3.pdf14 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT FORM 1.pdf17 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EARTH ESTATE FORM 2 JUNE QUARTER.pdf17 Jul 2023
Certificates of CA (Form 3)File: EARTH ESTATE FORM 3 JUNE QUARTER.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booked Inventory.pdf15 May 2023
Certificates of CA (Form 3)File: FORM 3 ESTATE MARCH 23_compressed.pdf28 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate sept 2022.pdf26 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate dec 2022.pdf26 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate march 2023.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booked Inventory.pdf26 Apr 2023
Declaration about Commencement CertificateFile: CC Declaration.pdf17 Dec 2022
CERSAI detailsFile: Cersai Declaration.pdf17 Dec 2022
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booked Inventory.pdf17 Dec 2022
Certificates of CA (Form 3)File: Estate Dev Pvt Ltd Form 31st March 2020.pdf17 Dec 2022
Certificates of CA (Form 3)File: Estate Dev Pvt Ltd Form 3 31st March 2021.pdf17 Dec 2022
Certificates of CA (Form 3)File: Estate Dev Pvt Ltd Form 3 31st March 2022.pdf17 Dec 2022
Certificates of CA (Form 3)File: Estate Dev Pvt Ltd Form 3 30 June 2022.pdf17 Dec 2022
Certificates of CA (Form 3)File: Estate Dev Pvt Ltd Form 3 30 Sept 2022.pdf17 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Earth Estate Dev Pvt Ltd FROM-5 01-April 2018 To 31st March 2019.pdf17 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Earth Estate Dev Pvt Ltd FROM-5 01-April 2019To 31st March 2020.pdf17 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Earth Estate Dev Pvt Ltd FROM-5 01-April 2021 To 31st March 2022.pdf17 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Earth Estate Dev Pvt Ltd FROM-5 01-April 2020 To 31st-March 2021.pdf17 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Earth Estate Dev Pvt Ltd FROM-5 01-April 2021 To 31st March 2022.pdf17 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 21Q2 Arch Cert.pdf17 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 19Q2 Arch Certificate.pdf19 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 19Q2 Eng Certificate.pdf19 Aug 2019
Form 2AFile: 19Q2 Form 2A.pdf19 Aug 2019
Certificates of CA (Form 3)File: 19Q2 CA Certificate.pdf19 Aug 2019
Form 2AFile: Estate Form 2A.pdf12 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 19Q1 Arch Certificate.pdf8 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 19Q1 Eng Certificate.pdf6 Apr 2019
Certificates of CA (Form 5)File: CA Certificate.pdf26 Oct 2018
Layout approvalFile: Estate Layout Approval.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Estate Layout Approval.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Estate Eng Certificate.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Estate Arch Certificate.pdf30 Jul 2017
Certificates of CA (Form 3)File: Estate CA Certificate.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Estate CC.pdf27 Jul 2017
Building plan approvalFile: Estate IOD.pdf25 Jul 2017
PAN CardFile: Estate PAN Card.pdf25 Jul 2017
Copy of the legal title reportFile: Estate Title Certificate.pdf25 Jul 2017
Details of encumbrancesFile: Estate Encumbrance Certificate.pdf25 Jul 2017
Building Plan Approval (IOD)File: Estate IOD.pdf25 Jul 2017
Declaration in FORM BFile: Estate FormB.pdf25 Jul 2017
Proforma of Allotment letterFile: Estate LOA Agg Self Declaration.pdf25 Jul 2017
OtherFile: Estate IGBC.pdf25 Jul 2017

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Earth Baug116 Shamaldas Gandhi Marg Princess Street Mumbai 400 00237CompletedDec 2017Late, Mar 2018
Earth ClassicDr Babasaheb Ambedkar Road Matunga East Mumbai 40001929CompletedOct 2017Late, Nov 2017
Earth Galaxy163 A Dr Babasaheb Ambedkar Road Dadar Mumbai 40001421CompletedApr 2014Apr 2014
Earth Pillar22 24B Junction of Khadilkar Road and Sadashiv Cross Road Girgaum Mumbai 40000454CompletedNov 2012Late, Apr 2015
Earth View12th Khetwadi Back Road Girgaon Mumbai 40000445CompletedAug 2012Aug 2012

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 67 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Earth Residency Wing C and Wing D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmEarth Residency Wing C aCompleted 126Lapsed / revoked 90Other 189Dot size: filed unitsN

Filed coordinates, straight-line distance. 405 registered projects within 2 km.

Builder: Earth Estate Developers Pvt Ltd

Earth Estate Developers Pvt Ltd has 1 registration on MahaRERA, including Earth Residency Wing C and Wing D. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Earth Residency Wing C and Wing D is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Earth Residency Wing C and Wing D?

The registered promoter entity is Earth Estate Developers Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Earth Residency Wing C and Wing D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Earth Residency Wing C and Wing D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Earth Residency Wing C and Wing D?

The professionals named in the filing: Architect: Anish Chouhan; Engineer: Sura & Associates; Engineer: HEMENDRA BIDAMIA; Chartered Accountant: MEGHAL JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Earth Residency Wing C and Wing D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Earth Residency Wing C and Wing D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Earth Residency Wing C and Wing D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.