Home / Browse projects / Amravati, Maharashtra / Dwarkadhish Residency

Completed No litigation declared Residential / Group Housing project

Dwarkadhish Residency

By Ashish Mohanrao Jirapure

RG-MH-67112 · RERA P50300046667 · Last updated on MahaRERA portal: 19 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Sep 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
10 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

Dwarkadhish Residency is a Residential / Group Housing project by Ashish Mohanrao Jirapure in Amravati, Maharashtra, registered with MahaRERA as P50300046667 on 26 Aug 2022. The registration is recorded completed; possession was promised by 30 Sep 2026. 2 of the 12 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameDwarkadhish Residency
  • TypeResidential / Group Housing
  • Location
    • Plot No. 7
    • Survey No. 3/2
    • Sai Nagar
    • Amravati
    • 444607
  • Pincode444607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50300046667
  • ReraGenie IDRG-MH-67112

Builder

  • NameAshish Mohanrao Jirapure
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2022PromisedSep 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Aug 2022
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed97 files

Current status

17%2 of 12 units booked
102.6%Work done, per cost certificate

Figures as on 19 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dwarkadhish ResidencyNA7612012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Dwarkadhish Residency: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area446 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Oct 2024
LandownerVillageDistrict
Thakur Babulal GohilAmravati (M Corp.)Amravati

Approvals and building plan

Sanctioning authorityAMRAVATI MUNICIAPAL CORPORATION
Permissible FSI1605.54
Proposed, not sanctioned1,606 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShyam Chowk, Amravati
Estimated costRs 2.35 cr
Cost incurredRs 2.41 cr
Work done102.59%
BuildingWingEstimatedIncurred
Dwarkadhish ResidencyNARs 2.35 crRs 2.41 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGIRISH NAGPURE
EngineerAMIT MEHARE
Chartered AccountantC A P & CO.
Chartered AccountantSHAILESH SUBHASH ZANWAR
PartnerRole in project
Ashish Mohanrao Jirapure-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: From 1.pdf19 Apr 2026
Withdrawal Update Form 2File: From 2.pdf19 Apr 2026
Withdrawal Update Form 3File: From 3.pdf19 Apr 2026
Occupational CertificateFile: Comp.pdf19 Apr 2026
Form 5 (FY 2025-2026)File: From 5.pdf8 Apr 2026
Withdrawal Update Form 1File: From 1.pdf11 Feb 2026
Withdrawal Update Form 1File: From 1.pdf11 Feb 2026
Withdrawal Update Form 1File: F1.pdf11 Feb 2026
Withdrawal Update Form 1File: F1.pdf11 Feb 2026
Withdrawal Update Form 2File: From 2.pdf11 Feb 2026
Withdrawal Update Form 2File: From 2.pdf11 Feb 2026
Withdrawal Update Form 2File: F2.pdf11 Feb 2026
Withdrawal Update Form 2File: F2.pdf11 Feb 2026
Withdrawal Update Form 3File: F3 31-03-24.pdf11 Feb 2026
Withdrawal Update Form 3File: F3 31-03-24.pdf11 Feb 2026
Withdrawal Update Form 3File: From 3 Q2.pdf11 Feb 2026
Withdrawal Update Form 3File: f3 Q3.pdf11 Feb 2026
Form 2A (FY 2024-2025)File: 2A24-25.pdf11 Feb 2026
Form 1File: From 1 311224.pdf18 Jun 2025
Form 2File: From 2 311224.pdf18 Jun 2025
Form 3File: F3 311225.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: STK.pdf18 Jun 2025
Form 1File: From 1 310325.pdf18 Jun 2025
Form 2File: From 2 310325.pdf18 Jun 2025
Form 3File: F3 310325.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: stk.pdf18 Jun 2025
Form 1File: f 1 30-6.pdf14 Jun 2025
Form 2File: f 2 30-6.pdf14 Jun 2025
Form 3File: f 3 30-6.pdf14 Jun 2025
Disclosure of Sold and Booked InventoryFile: Stock.pdf14 Jun 2025
Form 1File: From 1 300924.pdf14 Jun 2025
Form 2File: From 2 300924.pdf14 Jun 2025
Form 3File: From 3 30-09.pdf14 Jun 2025
Disclosure of Sold and Booked InventoryFile: Stock.pdf14 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: f 3 30-6.pdf20 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: q 30-6.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: f 2 30-6.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: f 1 30-6.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: f 3 30-6.pdf20 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: q 30-6.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: f 2 30-6.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: f 1 30-6.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: f 1 30-6.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: f 1 30-6.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: f 3 30-6.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: f 3 30-6.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: f 2 30-6.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: f 2 30-6.pdf20 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: q 30-6.pdf20 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: q 30-6.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2.pdf9 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: quality.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 31-03-24.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: quality.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 31-03-24.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: quality.pdf9 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: quality.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 30-09.pdf17 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 31-12.pdf17 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From2 30-09.pdf17 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 31-12.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From2 qu 30-9.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From2 qulity 31-12.pdf17 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 30-9.pdf17 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 31-12.pdf17 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: from 5.pdf17 Feb 2024
Disclosure of sold/ booked inventoryFile: stk3009.pdf14 Feb 2024
Disclosure of sold/ booked inventoryFile: stk3112.pdf14 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: pyramid f3q11.pdf28 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1_compressed.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2_compressed.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: quality cer_compressed.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Date.pdf19 Aug 2022
Building plan approvalFile: MAP New.pdf16 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: MAP New.pdf16 Aug 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
BHAIRAVI HERITAGEP50300066471RUKHMINI NAGAR, AmravatiJun 2024CompletedDec 2029Jan 1970

How this compares with Amravati

17%of this project is bookeddistrict median 0%
8%of Amravati projects moved their completion datethis one has not
33%of Amravati registrations have lapsed or been cancelledthis one is completed

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep Dwarkadhish Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sai Nagar450+ in Amravati

2 kmDwarkadhish ResidencyCompleted 20Lapsed / revoked 11Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 46 registered projects within 2 km.

Builder: Ashish Mohanrao Jirapure

Ashish Mohanrao Jirapure has 2 registrations on MahaRERA, including Dwarkadhish Residency and BHAIRAVI HERITAGE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What are my rights if Dwarkadhish Residency is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dwarkadhish Residency?

The registered promoter entity is Ashish Mohanrao Jirapure, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dwarkadhish Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dwarkadhish Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dwarkadhish Residency?

The professionals named in the filing: Architect: GIRISH NAGPURE; Engineer: AMIT MEHARE; Chartered Accountant: C A P & CO.; Chartered Accountant: SHAILESH SUBHASH ZANWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dwarkadhish Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dwarkadhish Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dwarkadhish Residency to a free account