Registration lapsed No litigation declared Others project

DURVANKUR RESIDENCY C WING

By DURVANKUR DEVELOPERS

RG-MH-42865 · RERA P52100052822 · Last updated on MahaRERA portal: 30 Mar 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 5 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2026Possession promised5 months past this date
3 of 11Construction stages donefurthest along: Internal walls, 75%
10 of 34Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

DURVANKUR RESIDENCY C WING is a Others project by DURVANKUR DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100052822 on 5 Oct 2023. Possession was promised by 25 May 2026 and is now 5 months past that date. The completion date has moved by 12 months from the original filing. 24 of the 34 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameDURVANKUR RESIDENCY C WING
  • TypeOthers
  • Location
    • S.NO 28/17 AMGEGAON BK
    • AMBEGAON BK
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052822
  • ReraGenie IDRG-MH-42865

Builder

  • NameDURVANKUR DEVELOPERS
  • Entity typePartnership
  • PartnersBALASAHEB RANGANATH WALSEPATIL, SARJERAO GANPAT SHILIMKAR, BALASAHEB MAHADEV MOHOL, RAJESH BABANRAO MOHOL
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked

Key dates

5 months past promisethis monthRegisteredOct 2023First promiseMay 2025Revised toMay 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Oct 2023
  • Promised completion25 May 2026
  • Revised completionRevised to 25 May 2026 (originally 31 May 2025)
  • Buildings1 building record
  • Documents filed76 files

Current status

71%24 of 34 units booked
62.6%Work done, per cost certificate

Figures as on 30 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DURVANKUR RESIDENCY C WINGNA9728634

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.

DURVANKUR RESIDENCY C WING: 60% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 30 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Open Space16

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
Bhau Kondiba PawarAMBEGAON BkPune
MACHINDRA KONDIBA PAWARAMBEGAON BkPune
SHAKUNTALA KONDIBA PAWARAMBEGAON BkPune
CHANDRABHAGA KONDIBA PAWARAMBEGAON BkPune

Approvals and building plan

Sanctioning authorityPMC
Permissible FSI2440.64
Proposed, not sanctioned2,441 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAMBEGAON BK
Estimated costRs 14.00 cr
Cost incurredRs 8.76 cr
Work done62.6%
BuildingWingEstimatedIncurred
DURVANKUR RESIDENCY C WINGNARs 13.40 crRs 8.21 cr
-NARs 60.00 lakhRs 55.90 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr.Rushikesh Gorakh Zagade GORAKH ZAGADE
EngineerSubhash Mangori & Associates
Chartered AccountantCA B B AWARI B AWARI
Chartered AccountantNEHA KATARIYA
PartnerRole in project
DURVANKUR DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA12092502569May 2025 → May 2026

Reason as filed by the promoterThere is some labours issue .Due to time delay getting the relevant approval of FSI & revise plan we are not able to complete the project on committed dated as mentioned in RERA i.e. 31/05/2025. Therefore, we want to extend project completion date to 25/05/2026

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 AR Certifiacte Q2 SEP-2025.pdf30 Mar 2026
Withdrawal Update Form 1File: FORM 1 AR Certifiacte Q3 DEC-2025.pdf30 Mar 2026
Withdrawal Update Form 2File: FORM 2 EGG Certificate Q2 SEP-2025.pdf30 Mar 2026
Withdrawal Update Form 2File: FORM 2 EGG Certificate Q3 DEC-2025.pdf30 Mar 2026
Withdrawal Update Form 3File: FORM 3 CA Certificate Q2 SEP-2025.pdf30 Mar 2026
Withdrawal Update Form 3File: FORM 3 CA Certificate Q3 DEC-2025_.pdf30 Mar 2026
Withdrawal Update Form 1File: FORM 1 AR Certifiacte Q2 SEP-2025.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1 AR Certifiacte Q2 SEP-2025.pdf28 Mar 2026
Withdrawal Update Form 2File: FORM 2 EGG Certificate Q2 SEP-2025.pdf28 Mar 2026
Withdrawal Update Form 2File: FORM 2 EGG Certificate Q2 SEP-2025.pdf28 Mar 2026
Withdrawal Update Form 3File: FORM 3 CA Certificate Q2 SEP-2025.pdf28 Mar 2026
Withdrawal Update Form 3File: FORM 3 CA Certificate Q2 SEP-2025.pdf28 Mar 2026
Withdrawal Update Form 1File: ARCHITECT LETTER DURVANKUR DEVELOPERS.pdf11 Sep 2025
Withdrawal Update Form 1File: ARCHITECT LETTER FORM 1_page-0001.pdf11 Sep 2025
Withdrawal Update Form 2File: ENGEENER LETTER DURVANKUR DEVELOPERS.pdf11 Sep 2025
Withdrawal Update Form 2File: ENGEENER LETTER DURVANKUR DEVELOPERS.pdf11 Sep 2025
Withdrawal Update Form 3File: ca certificate_merged.pdf11 Sep 2025
Withdrawal Update Form 3File: Durvankur developers Form no 3.pdf11 Sep 2025
Form 1File: Form no 1.pdf17 Jun 2025
Form 2File: Form no 2.pdf17 Jun 2025
Form 3File: Form no 3.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf17 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form no 1.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form no 3_compressed (1).pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form no2.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archect Certificate.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE-1-5_merged_compressed.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH 24-25 Q1.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 24-25 Q1.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH 24-25 Q1.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 24-25 Q1.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Q4_compressed.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificates 23-24 Q4_page-0001.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificates durvankur developer_page-0001.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificates durvankur developer_page-0001.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Q4_compressed.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificates 23-24 Q4_page-0001.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT LETTER DURVANKUR DEVELOPERS.pdf26 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGEENER LETTER DURVANKUR DEVELOPERS.pdf26 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate_merged.pdf26 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: mail.pdf26 Sep 2023
Copy of the legal title reportFile: Title final.pdf27 Jun 2023
Details of encumbrances concerned to FinanceFile: Declaration for Legal Encumbrances_Scan.pdf27 Jun 2023
Details of encumbrances concerned to FinanceFile: Declaration for Financial Encumbrances Scan.pdf27 Jun 2023
Details of encumbrances concerned to LegalFile: Declaration for Legal Encumbrances_Scan.pdf27 Jun 2023
Details of encumbrances concerned to LegalFile: Declaration for Financial Encumbrances Scan.pdf27 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: PLINTH Checking Certificate.pdf27 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Discl of Inttt of Oth Real Estate Org.pdf27 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: BW_Discl of Intt of Oth Real Estate Org.pdf27 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SS_Discl of Intt of Oth Real Estate Org.pdf27 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RM_Discl of Intt of Oth Real Estate Org.pdf27 Jun 2023
Declaration about Commencement CertificateFile: Format D.pdf31 May 2023
CERSAI detailsFile: Self Declaration CERSAI Reports Scan.pdf31 May 2023
Proforma of Allotment letterFile: Model Allotment Letter Scan.pdf31 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration abour Separate Bank Acc Scan.pdf31 May 2023
Deviation Report with respect to Allotment letterFile: Declaration for No Deviation in Model Allotment Letter Scan.pdf31 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation wrt agreement to sale.pdf31 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA CERTIFICATE FORM 2_compressed.pdf30 May 2023
Building plan approvalFile: BUILDING PLAN_Temp00001.PDF26 May 2023
Building plan approvalFile: BUILDING PLAN_Temp00002.PDF26 May 2023
Building plan approvalFile: BUILDING PLAN_Temp00003.PDF26 May 2023
Layout approvalFile: BUILDING PLAN_Temp00001.PDF26 May 2023
PAN CardFile: PAN CARD.pdf26 May 2023
Copy of Layout Approval (in case of layout)File: BUILDING PLAN_Temp00001.PDF26 May 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_Temp00001.PDF26 May 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_Temp00002.PDF26 May 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_Temp00003.PDF26 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Scan_compressed.pdf26 May 2023
Declaration in FORM BFile: FORM B_BALASAHEB MOHOL.pdf26 May 2023
Declaration in FORM BFile: FORM B_BALASAHEB WALSEPATIL.pdf26 May 2023
Declaration in FORM BFile: FORM B_RAJESH MOHOL.pdf26 May 2023
Declaration in FORM BFile: FORM B_SARJERAO SHILIMKAR.pdf26 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Letter_compressed.pdf26 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf26 May 2023
Proforma of Agreement for saleFile: Rera standered format Durwankur Developers.pdf26 May 2023

How this compares with Pune

71%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DURVANKUR RESIDENCY C WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBEGAON BK13,700+ in Pune

2 kmDURVANKUR RESIDENCY C WICompleted 163Lapsed / revoked 118Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: DURVANKUR DEVELOPERS

Durvankur Developers has 3 registrations on MahaRERA, including Omkar Apartments and SWAPANPURTI HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that DURVANKUR RESIDENCY C WING shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if DURVANKUR RESIDENCY C WING is delayed beyond 25 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DURVANKUR RESIDENCY C WING?

The registered promoter entity is DURVANKUR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DURVANKUR RESIDENCY C WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DURVANKUR RESIDENCY C WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DURVANKUR RESIDENCY C WING?

The professionals named in the filing: Architect: Mr.Rushikesh Gorakh Zagade GORAKH ZAGADE; Engineer: Subhash Mangori & Associates; Chartered Accountant: CA B B AWARI B AWARI; Chartered Accountant: NEHA KATARIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DURVANKUR RESIDENCY C WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DURVANKUR RESIDENCY C WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DURVANKUR RESIDENCY C WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.