Home / Browse projects / Nagpur, Maharashtra / DURVANG VASANT IMPERIAL
DURVANG VASANT IMPERIAL
RG-MH-14775 · RERA P50500046741 · Last updated on MahaRERA portal: 18 May 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DURVANG VASANT IMPERIAL is a Residential / Group Housing project by PINNACLE CONSTRUCTION in Nagpur, Maharashtra, registered with MahaRERA as P50500046741 on 5 Sep 2022. The registration is recorded completed; possession was promised by 31 Dec 2025.
At a glance
Project
- NameDURVANG VASANT IMPERIAL
- TypeResidential / Group Housing
- Location
- MANISH NAGAR RAILWAY CROSSING ROAD
- MANISH NAGAR SOMALWADA
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440015
- Pincode440015
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500046741
- ReraGenie IDRG-MH-14775
Builder
- NamePINNACLE CONSTRUCTION
- Entity typeOthers
- Named personPANKAJ RAMKRUSHNA KOLHE
- Other registrations6 more →
- Completed5 of 7
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Sep 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed70 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DURVANG VASANT IMPERIAL | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
DURVANG VASANT IMPERIAL: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 18 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed111
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PANKAJ RAMKRUSHNA KOLHE | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SURESH BHAIYAJI BHOMLE |
| Engineer | NILESH DEORAOJI DHARMARE |
| Chartered Accountant | SANDEEP MUNDHADA |
| Partner | Role in project |
|---|---|
| PINNACLE CONSTRUCTION | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 7 May 2024
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form-4 Architect Completion Certificate 09-05-2024.pdf | 18 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form-2 30-04-2024.pdf | 7 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form-3 30-04-2024_compressed.pdf | 7 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate Form-5 30-04-2024.pdf | 7 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DVI Occupation Certificate 05-03-2024.pdf | 7 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DVI Engineers Certificate (Upto 31st Dec 2023).pdf | 19 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: DVI Form-5- CA Certificate (Upto 31st Dec 2023).pdf | 19 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-DVI Quality Assurance Certifiate.pdf | 25 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: DVI CA Certificate for Annual Update (2022-2023).pdf | 18 Dec 2023 |
| Proforma of Allotment letterFile: Schedule-A.pdf | 13 Sep 2022 |
| Proforma of Allotment letterFile: Schedule-B.pdf | 13 Sep 2022 |
| Proforma of Allotment letterFile: Annexure A- Legal Title Report from advocate.pdf | 13 Sep 2022 |
| Proforma of Allotment letterFile: Annexure C-2 a.pdf | 13 Sep 2022 |
| Proforma of Allotment letterFile: Annexure C-2 b.pdf | 13 Sep 2022 |
| Proforma of Allotment letterFile: Annexure C-2 c.pdf | 13 Sep 2022 |
| Proforma of Allotment letterFile: Annexure-C-1.pdf | 13 Sep 2022 |
| Proforma of Allotment letterFile: Annexure-D.pdf | 13 Sep 2022 |
| Proforma of Allotment letterFile: Annexure-E.pdf | 13 Sep 2022 |
| Proforma of Allotment letterFile: Annexure-F.pdf | 13 Sep 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Annexure A RERA Account Details.pdf | 13 Sep 2022 |
| Other - LegalFile: Part 2 of 4.pdf | 21 Aug 2022 |
| Other - LegalFile: Part 3 of 4.pdf | 21 Aug 2022 |
| Other - LegalFile: Part 4 of 4.pdf | 21 Aug 2022 |
| Other - LegalFile: DVI Old 20,21,27,28,29.pdf | 21 Aug 2022 |
| Other - LegalFile: DVI Old 22,23,24,25,26.pdf | 21 Aug 2022 |
| Other - LegalFile: Durvang Imperial Amulgamation Letter.pdf | 21 Aug 2022 |
| Other - LegalFile: Durvang Imperial Amulgamation Map.pdf | 21 Aug 2022 |
| Other - FinanceFile: DVI NIT Charges Receipts.pdf | 21 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report on Annexure A.pdf | 17 Aug 2022 |
| PAN CardFile: PINNACLE CONSTRUCTION GST CERTIFICATE.pdf | 13 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 01 To 05.pdf | 13 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 06 To 09.pdf | 13 Aug 2022 |
| Proforma of Allotment letterFile: Annexure A AFS Rule 10(1).pdf | 7 Aug 2022 |
| Copy of the legal title reportFile: Format A DVI Legal Title Report and Flow of Title_compressed (1).pdf | 31 Jul 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A DVI Separate Bank account Details.pdf | 29 Jul 2022 |
| Deviation Report with respect to Allotment letterFile: DVI Deviation to Allotment Letter.pdf | 15 Jul 2022 |
| Layout approvalFile: DVI Layout Map.pdf | 11 Jul 2022 |
| Copy of Layout Approval (in case of layout)File: DVI Layout Map.pdf | 11 Jul 2022 |
| CERSAI detailsFile: DVI Undertaking.pdf | 11 Jul 2022 |
| Declaration about Commencement CertificateFile: DVI Format D.pdf | 7 Jul 2022 |
| Other - LegalFile: DVI DOD Part 1 of 8.pdf | 7 Jul 2022 |
| Other - LegalFile: DVI DOD Part 2 of 8.pdf | 7 Jul 2022 |
| Other - LegalFile: DVI DOD Part 3 of 8.pdf | 7 Jul 2022 |
| Other - LegalFile: DVI DOD Part 4 of 8.pdf | 7 Jul 2022 |
| Other - LegalFile: DVI DOD Part 5 of 8.pdf | 7 Jul 2022 |
| Other - LegalFile: DVI DOD Part 6 of 8.pdf | 7 Jul 2022 |
| Other - LegalFile: DVI DOD Part 7 of 8.pdf | 7 Jul 2022 |
| Other - LegalFile: DVI DOD Part 8 of 8.pdf | 7 Jul 2022 |
| Other - LegalFile: Part 1 of 4.pdf | 7 Jul 2022 |
| Other - TechnicalFile: Durvang Imperial Amulgamation Letter.pdf | 7 Jul 2022 |
| Other - TechnicalFile: Durvang Imperial Amulgamation Map.pdf | 7 Jul 2022 |
| Other - TechnicalFile: DVI Plot RL 20 To 24.pdf | 7 Jul 2022 |
| Other - TechnicalFile: DVI Plot RL 25 To 29.pdf | 7 Jul 2022 |
| Other - TechnicalFile: DVI Layout Map.pdf | 7 Jul 2022 |
| Details of encumbrances concerned to LegalFile: DVI No Litigation Certificate.pdf | 6 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: DVI Building Permit.pdf | 6 Jul 2022 |
| Proforma of Allotment letterFile: DVI New Allotment Performa.pdf | 6 Jul 2022 |
| Building plan approvalFile: DVI 1 OF 3.pdf | 4 Jul 2022 |
| Building plan approvalFile: DVI 2 OF 3.pdf | 4 Jul 2022 |
| Building plan approvalFile: DVI 3 OF 3.pdf | 4 Jul 2022 |
| PAN CardFile: Pankaj Kolhe_PAN CARD pdf.pdf | 4 Jul 2022 |
| Details of encumbrances concerned to FinanceFile: DVI No Litigation Certificate.pdf | 4 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: DVI 1 OF 3.pdf | 4 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: DVI 2 OF 3.pdf | 4 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: DVI 3 OF 3.pdf | 4 Jul 2022 |
| Declaration in FORM BFile: DVI Form B Affidevit.pdf | 4 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DVI Architect Certificate.pdf | 4 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DVI Engineer Certificate.pdf | 4 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DVI Annexure A AND B.pdf | 4 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: DVI Annexure A AND B.pdf | 4 Jul 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
Keep DURVANG VASANT IMPERIAL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MANISH NAGAR SOMALWADA2,800+ in Nagpur
Filed coordinates, straight-line distance. 102 registered projects within 2 km.
STRAWBERRY FARM
MEGHA AMOL WALKE
OFFICERS ENCLAVE
R SANDESH INFRASTRUCTURES PRIVATE LIMITED
WHITE TIGER AND WILD FLOWER
MILINDKUMAR BHAURAO MESHRAM
PALAZZO ROYAL
INTERCONTINENTAL OASIS INFRA LLP
gokul
surendra mangaldas chadda
Sai Villa 5
Earth Infra Venture
See every Nagpur project, with the district possession charts
Builder: PINNACLE CONSTRUCTION
PINNACLE CONSTRUCTION has 7 registrations on MahaRERA, including INNOVATIVE PLAZA-I and INNOVATIVE RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if DURVANG VASANT IMPERIAL is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DURVANG VASANT IMPERIAL?
The registered promoter entity is PINNACLE CONSTRUCTION, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DURVANG VASANT IMPERIAL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DURVANG VASANT IMPERIAL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DURVANG VASANT IMPERIAL?
The professionals named in the filing: Architect: SURESH BHAIYAJI BHOMLE; Engineer: NILESH DEORAOJI DHARMARE; Chartered Accountant: SANDEEP MUNDHADA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DURVANG VASANT IMPERIAL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback