Registration lapsed No litigation declared Commercial project

DUGAD HEIGHTS

By DUGAD REALITY

RG-MH-55250 · RERA P52100017665 · Last updated on MahaRERA portal: 31 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
6 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
74 of 89Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 120 documents Report an error

DUGAD HEIGHTS is a Commercial project by DUGAD REALITY in Pune, Maharashtra, registered with MahaRERA as P52100017665 on 4 Sep 2018. Possession was promised by 30 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 15 of the 89 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameDUGAD HEIGHTS
  • TypeCommercial
  • Location
    • KATRAJ KONDHWA ROAD
    • NEAR INDIAN OIL PETROL PUMP
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411046
  • Pincode411046
  • RERA no.P52100017665
  • ReraGenie IDRG-MH-55250

Builder

  • NameDUGAD REALITY
  • Entity typePartnership
  • PartnersTEJAS PRAVIN DUGAD, KIRTI MANIKCHAND DUGAD, PREM KIRTI DUGAD

Key dates

10 months past promisethis monthRegisteredSep 2018First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Sep 2018
  • Promised completion30 Dec 2025
  • Revised completionRevised to 30 Dec 2025 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed120 files

Current status

17%15 of 89 units booked
63.6%Work done, per cost certificate

Figures as on 31 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DUGAD HEIGHTSNA131308989

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

DUGAD HEIGHTS: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 31 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed76

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots76
Closed/Covered76

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Dec 2025

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI1680.97
Proposed, not sanctioned1,681 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Plot No 62,Araneshwar Chowk, Near Suparna Mangal Karyalaya, pune 411009
Estimated costRs 21.50 cr
Cost incurredRs 13.68 cr
Work done63.61%
BuildingWingEstimatedIncurred
-NARs 11.00 crRs 1.81 cr
DUGAD HEIGHTSNARs 10.50 crRs 11.86 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIKAS M DHERE
EngineerG A BHILARE CONSULTANTS PVT LTD
EngineerD L DHAWAD
Chartered AccountantCA VIDHI SHAH
Chartered AccountantSPCM AND ASSOCIATES
Chartered AccountantCA SIDDHANT A BORA
PartnerRole in project
DUGAD REALITY-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025315Dec 2024 → Dec 2025

Reason as filed by the promoterThe Promoter will require some more time to complete the final procedure of the project i.e., 30.12.2025

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed120

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q2 DUGAD REALITY.pdf31 Jan 2026
Withdrawal Update Form 1File: Form 1 31 12 25.pdf31 Jan 2026
Withdrawal Update Form 2File: Form 2 Q2 DUGAD REALITY.pdf31 Jan 2026
Withdrawal Update Form 2File: Form 2 3112 25.pdf31 Jan 2026
Withdrawal Update Form 3File: Form 3 Q2 DUGAD REALITY.pdf31 Jan 2026
Withdrawal Update Form 3File: SIGNED FORM 3.pdf31 Jan 2026
Form 2File: Form 2 singed.pdf20 Dec 2025
Form 1File: Form 1 Architect Cerrtificate.pdf20 Dec 2025
Form 3File: SIGNED FORM 3.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf20 Dec 2025
Withdrawal Update Form 1File: FORM 1 Q1 DUGAD REALITY.pdf20 Dec 2025
Withdrawal Update Form 2File: Form 2 Q1 DUGAD REALITY.pdf20 Dec 2025
Withdrawal Update Form 3File: SIGNED FORM 3 Q1 DUGAD REALTY.pdf20 Dec 2025
Declaration in FORM BFile: FORM B.pdf10 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 DUGAD HEIGHTS.pdf18 Jan 2025
Certificates of CA (Form 3)File: FORM 3 SIGNED (2).pdf18 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 DUGAD HEIGHTS.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf18 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A DUGAD HEIGHTS.pdf18 Jan 2025
Declaration in FORM BFile: Form B Affidevit_compressed.pdf2 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf19 Nov 2024
Certificates of CA (Form 3)File: FORM 3.pdf19 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf19 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf19 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked inventory.pdf19 Nov 2024
Certificates of CA (Form 3)File: FORM 3.pdf19 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf19 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf19 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf19 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf19 Nov 2024
Certificates of CA (Form 3)File: FORM 3.pdf19 Nov 2024
Certificates of CA (Form 3)File: FORM 3.pdf19 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf19 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked inventory.pdf19 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf19 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf19 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf26 Oct 2024
Certificates of CA (Form 3)File: FORM 3_compressed (9).pdf26 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf26 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf26 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf26 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SIGNED.pdf26 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 New with Sign.pdf23 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf23 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf23 Feb 2024
Certificates of CA (Form 3)File: FORM 3.pdf23 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: DUGAD REALTY FORM-5_compressed (1).pdf9 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf31 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf31 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf31 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf31 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf31 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf31 Oct 2023
Disclosure of sold/ booked inventoryFile: Discloure of Book Sold Summery.pdf31 Oct 2023
Disclosure of sold/ booked inventoryFile: Discloure of Book - Sold Summary.pdf31 Oct 2023
Certificates of CA (Form 3)File: FORM-3.pdf31 Oct 2023
Certificates of CA (Form 3)File: FORM 3.pdf31 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf19 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Engineer Certificate for Quality Assurance.pdf19 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf19 Apr 2023
Certificates of CA (Form 3)File: Disclosure of Sold Booked Inventory.pdf19 Apr 2023
Certificates of CA (Form 3)File: Form 3.pdf19 Apr 2023
Certificates of CA (Form 3)File: 1 (2)_compressed.pdf25 Mar 2023
Certificates of CA (Form 3)File: 2.pdf25 Mar 2023
Certificates of CA (Form 3)File: 3_compressed.pdf25 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SIGNED FORM 5 DUGAD.pdf25 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf13 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Ceritifate.pdf13 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf13 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf13 Feb 2023
Certificates of CA (Form 3)File: FORM 3.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SIGNED FORM 5 DUGAD REALTY.pdf12 Jan 2022
Building plan approvalFile: Plan 1696-1.pdf31 Aug 2021
Building plan approvalFile: Plan 1696-2.pdf31 Aug 2021

How this compares with Pune

17%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DUGAD HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR INDIAN OIL PETROL PUMP13,700+ in Pune

Builder: DUGAD REALITY

DUGAD REALITY has 1 registration on MahaRERA, including DUGAD HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that DUGAD HEIGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if DUGAD HEIGHTS is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DUGAD HEIGHTS?

The registered promoter entity is DUGAD REALITY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DUGAD HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DUGAD HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DUGAD HEIGHTS?

The professionals named in the filing: Architect: VIKAS M DHERE; Engineer: G A BHILARE CONSULTANTS PVT LTD; Engineer: D L DHAWAD; Chartered Accountant: CA VIDHI SHAH; Chartered Accountant: SPCM AND ASSOCIATES; Chartered Accountant: CA SIDDHANT A BORA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DUGAD HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DUGAD HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DUGAD HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.