Home / Browse projects / Mumbai Suburban, Maharashtra / DTG AVENUE 68

Registered No litigation declared Residential / Group Housing project

DTG AVENUE 68

By DHARIWAL THIRANI CONSTRUCTIONS LLP

RG-MH-18544 · RERA P51800077508 · Last updated on MahaRERA portal: 30 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 27.00 crore secured on the land, in favour of TRUHOME FINANCE LTD

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 65%
41 of 162Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

DTG AVENUE 68 is a Residential / Group Housing project by DHARIWAL THIRANI CONSTRUCTIONS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077508 on 20 Aug 2024. Possession is promised by 30 Jun 2028. 121 of the 162 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameDTG AVENUE 68
  • TypeResidential / Group Housing
  • Location
    • SHAILENDRA NAGAR
    • DAHOSAR EAST
    • Dahisar
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • RERA no.P51800077508
  • ReraGenie IDRG-MH-18544

Builder

  • NameDHARIWAL THIRANI CONSTRUCTIONS LLP
  • Entity typePartnership
  • PartnersSANJEEV MOTILAL MALHOTRA, DISHA navin thirani

Key dates

this monthRegisteredAug 2024PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Aug 2024
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed62 files

Current status

75%121 of 162 units booked
56.8%Work done, per cost certificate

Figures as on 30 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING - ANA181774074
WING - BNA181788088

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 65%.

WING - A58%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
WING - B58%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed126

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots126
Closed/Covered126
BuildingClosed/CoveredTotal
WING - A6363
WING - B6363

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,283 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofTRUHOME FINANCE LTD
Secured amountRs 27.00 crore
CERSAI search filedYes
Declared on18 Mar 2026
LandownerVillageDistrict
SHREE SHAILENDRA SADAN CHSLDahisarMumbai Suburban

Approvals and building plan

Sanctioning authorityBuilding Permission Cell, Greater Mumbai / MHADA
Permissible FSI9323.28
Proposed, not sanctioned7,323 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Reis Magos, Sutrale Road, Off. Chandavarkar Lane, Borivali W Mumbai.400092
Estimated costRs 44.00 cr
Cost incurredRs 25.00 cr
Work done56.81%
BuildingWingEstimatedIncurred
WING - ANARs 22.00 crRs 12.50 cr
WING - BNARs 22.00 crRs 12.50 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectINGENIOUS ARCHITECTS
Engineerpragnesh oza
Chartered AccountantNEHALI & CO
PartnerRole in project
DHARIWAL THIRANI CONSTRUCTIONS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 DTG Avenue 68 1st Jan to Mar 26.pdf30 May 2026
Withdrawal Update Form 2File: Form 2 RERA-DTG Avenue Mar 26.pdf30 May 2026
Withdrawal Update Form 3File: Form 3 CA Certificate DTG AVENUE_Mar26 sign.pdf30 May 2026
Withdrawal Update Form 1File: Form 1 (architect certificate) 1st Oct to Dec 25_DTG Avenue 68.pdf17 Mar 2026
Withdrawal Update Form 2File: RERA-DTG DEC 2025.pdf17 Mar 2026
Withdrawal Update Form 3File: Form 3 Signed CA Certificate DTG AVENUE_dec25.pdf17 Mar 2026
Withdrawal Update Form 1File: Form 1 (architect certificate) 1st Jul to 30th Sept, 2025.pdf31 Oct 2025
Withdrawal Update Form 1File: Form 1 (architect certificate) 1st Jul to 30th Sept, 2025.pdf31 Oct 2025
Withdrawal Update Form 2File: Form 2_July to Sept 25 Engg sign.pdf31 Oct 2025
Withdrawal Update Form 2File: Form 2_July to Sept 25 Engg sign.pdf31 Oct 2025
Withdrawal Update Form 3File: Signed CA Certificate DTG AVENUE_Sept25 sign.pdf31 Oct 2025
Withdrawal Update Form 3File: Signed CA Certificate DTG AVENUE_Sept25 sign.pdf31 Oct 2025
Withdrawal Update Form 1File: Form 1 DTG AVEUE 68.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2 Apr to Jun 25 DTG AVENUE.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 CA Certificate DTG AVENUE.pdf17 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (architect certificate) 1st January to 31st March-25 sign.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DTG Avenue FORM 3 March 25 (1).pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DTG Avenue FORM 2 March 25.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEP.pdf5 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEP.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 DEC.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEP.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC.pdf5 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Bldg No 2, Shree Shailendra SADAN CHSL.pdf12 Aug 2024
Other - TechnicalFile: cc DELARATION (2).pdf8 Aug 2024
Other - TechnicalFile: ANNEXURE (A).pdf2 Aug 2024
Copy of the legal title reportFile: final title.pdf18 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: 10719_firstcc_signed.pdf18 Jul 2024
Declaration about Commencement CertificateFile: cc declaration.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: no loan.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate.pdf18 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: DocScanner 13-Aug-2024 12-12 pm.pdf18 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: format B bank.pdf18 Jul 2024
Deviation Report with respect to Allotment letterFile: deviation allotment.pdf18 Jul 2024
Deviation Report with respect to model copy of AgreementFile: deviation agreement.pdf18 Jul 2024
Proforma of Agreement for saleFile: Salman Dhariwal DTG agreement for Sale.pdf17 Jul 2024
Proforma of Allotment letterFile: SALMAN DHARIWAL DTG ALLOTMENT LETTER.pdf17 Jul 2024
Layout approvalFile: 2 compress.pdf26 Jun 2024
Layout approvalFile: 3 (2) (1) (2).pdf26 Jun 2024
Layout approvalFile: 4 (2) (1) (2).pdf26 Jun 2024
Layout approvalFile: 5 compress.pdf26 Jun 2024
Layout approvalFile: 6 (1) (1) (1).pdf26 Jun 2024
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (5).pdf26 Jun 2024
Copy of Layout Approval (in case of layout)File: 2 compress.pdf26 Jun 2024
Copy of Layout Approval (in case of layout)File: 3 (2) (1) (2).pdf26 Jun 2024
Copy of Layout Approval (in case of layout)File: 4 (2) (1) (2).pdf26 Jun 2024
Copy of Layout Approval (in case of layout)File: 5 compress.pdf26 Jun 2024
Copy of Layout Approval (in case of layout)File: 6 (1) (1) (1).pdf26 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (5).pdf26 Jun 2024
CERSAI detailsFile: 1 CERSAI details (6) (2).pdf26 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI.pdf26 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: trirani ventures DOI.pdf26 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISHA doi.pdf26 Jun 2024
Layout approvalFile: 1 (2) (1).pdf25 Jun 2024
Copy of Layout Approval (in case of layout)File: 1 (2) (1).pdf25 Jun 2024
Declaration in FORM BFile: form b.pdf25 Jun 2024
PAN CardFile: DTC PAN copy.pdf24 Jun 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (9) (1).pdf24 Jun 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (9) (1).pdf24 Jun 2024

How this compares with Mumbai Suburban

75%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DTG AVENUE 68 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DAHOSAR EAST6,700+ in Mumbai Suburban

Builder: DHARIWAL THIRANI CONSTRUCTIONS LLP

DHARIWAL THIRANI CONSTRUCTIONS LLP has 1 registration on MahaRERA, including DTG AVENUE 68. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if DTG AVENUE 68 is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DTG AVENUE 68?

The registered promoter entity is DHARIWAL THIRANI CONSTRUCTIONS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DTG AVENUE 68?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DTG AVENUE 68?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DTG AVENUE 68?

The professionals named in the filing: Architect: INGENIOUS ARCHITECTS; Engineer: pragnesh oza; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DTG AVENUE 68?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DTG AVENUE 68. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DTG AVENUE 68 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.