Home / Browse projects / Nashik, Maharashtra / DSV PRESTIGE
DSV PRESTIGE
RG-MH-35339 · RERA P51600050753 · Last updated on MahaRERA portal: 20 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DSV PRESTIGE is a Residential / Group Housing project by DSV DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600050753 on 28 Apr 2023. Possession is promised by 31 Dec 2027. 31 of the 60 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameDSV PRESTIGE
- TypeResidential / Group Housing
- Location
- AL AQSA COLONY
- KHODE NAGAR WADALA NASHIK
- Nashik (M Corp.)
- Nashik
- 422006
- Pincode422006
- RERA no.P51600050753
- ReraGenie IDRG-MH-35339
Builder
- NameDSV DEVELOPERS
- Entity typePartnership
- PartnersDILIP NIVRUTTI TUPE, SUNANDA DILIP TUPE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Apr 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed73 files
Current status
Figures as on 20 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DSV PRESTIGE A WING AND B WING | NA | 7 | 6 | 60 | 0 | 60 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.
DSV PRESTIGE A WING AND B WING: 63% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed108
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| DSV PRESTIGE A WING AND B WING | NA | Rs 7.35 cr | Rs 5.99 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KAPIL THAKKAR AND ASSOCIATES Thakkar |
| Engineer | JAYESH MAKWANA |
| Engineer | MOHAMMED ARSHAD RASHID KHAN |
| Chartered Accountant | SHUBHAM MUNDADA |
| Chartered Accountant | MAYUR SUNIL KOTHAWADE |
| Chartered Accountant | AMRUTKAR BRAHMANKAR & CO LLP |
| Partner | Role in project |
|---|---|
| DSV DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 01 AR FORM 30-06-25.pdf | 20 Mar 2026 |
| Withdrawal Update Form 2File: RCC Consultant CERTIFICATE-31-03-2025-1-4 (1).pdf | 20 Mar 2026 |
| Withdrawal Update Form 3File: Certificate DSV Developers 1.pdf | 20 Mar 2026 |
| Form 5 (FY 2024-2025)File: Rera Letter Form -5 2024-25.pdf | 18 Mar 2026 |
| Form 1File: 01 AR FORM 30-09-25.pdf | 8 Dec 2025 |
| Form 2File: RCC Consultant CERTIFICATE-30-09-2025-1-4.pdf | 8 Dec 2025 |
| Form 3File: form 3.pdf | 8 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK,SOLD INVENTORY.pdf | 8 Dec 2025 |
| Form 2A (FY 2023-2024)File: Form 2A.pdf | 8 Dec 2025 |
| Withdrawal Update Form 1File: 01 AR FORM 30-06-25.pdf | 28 Aug 2025 |
| Withdrawal Update Form 2File: RCC Consultant CERTIFICATE-31-03-2025-1-4 (1).pdf | 28 Aug 2025 |
| Withdrawal Update Form 3File: Certificate DSV Developers 1.pdf | 28 Aug 2025 |
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 5 Jun 2025 |
| Form 1File: 01 AR FORM 31-03-25 (1).pdf | 4 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory 08-02-25-1.pdf | 15 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DSV Developer FORM 5.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 AR FORM 31-12-24.pdf | 1 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DSV Dev 3rd Quarter_compressed.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCC Consultant CERTIFICATE-31-12-2024-1-4-1.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 AR FORM 05-10-24.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3F.pdf | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCC Consultant CERTIFICATE-05-10-2024-1-4.pdf | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCC Consultant CERTIFICATE-30-06-2024-1-4-2.pdf | 2 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3_compressed.pdf | 2 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 AR FORM 30-06-24-1.pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure 30-06-24-1.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 final.pdf | 5 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold_Booked Inventory.pdf | 20 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 26 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QAFA.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QBFA.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QCFA.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QAFB.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QBFB.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QCFB.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: QAFCA.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: QBFC.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: QCFC.pdf | 6 Feb 2024 |
| Proforma of Agreement for saleFile: agreement-dsv prestige.pdf | 30 May 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBANCE.pdf | 20 Apr 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBANCE.pdf | 20 Apr 2023 |
| CERSAI detailsFile: NO CERSAI.pdf | 20 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate.pdf | 20 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DocScanner 18-Apr-2023 2-16 pm.pdf | 18 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate REVISE.pdf | 3 Apr 2023 |
| Building plan approvalFile: DSV PRESTIGE Blue Print.pdf | 28 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: DSV PRESTIGE Blue Print.pdf | 28 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank DSV.pdf | 18 Mar 2023 |
| PAN CardFile: dsv pan.pdf | 15 Mar 2023 |
| Layout approvalFile: ley out.pdf | 6 Mar 2023 |
| Building plan approvalFile: building plan.pdf | 6 Mar 2023 |
| Copy of the legal title reportFile: Title report.pdf | 6 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: self.pdf | 6 Mar 2023 |
| Details of encumbrances concerned to LegalFile: self.pdf | 6 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: ley out.pdf | 6 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: building plan.pdf | 6 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: c c .pdf | 6 Mar 2023 |
| Declaration about Commencement CertificateFile: commencement .pdf | 6 Mar 2023 |
| Declaration in FORM BFile: form B.pdf | 6 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC.pdf | 6 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer .pdf | 6 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A.pdf | 6 Mar 2023 |
| Proforma of Agreement for saleFile: agreement-DSV Prestige.pdf | 6 Mar 2023 |
| Proforma of Allotment letterFile: allotment letter-DSV Pretige.pdf | 6 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: Devi allotment.pdf | 6 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: devi agreement .pdf | 6 Mar 2023 |
| Other - LegalFile: LEGAL.pdf | 6 Mar 2023 |
| Other - FinanceFile: finance.pdf | 6 Mar 2023 |
| Other - TechnicalFile: technical issue .pdf | 6 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DSV PRESTIGE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KHODE NAGAR WADALA NASHIK4,100+ in Nashik
SIGNIFICANT
IND DEVELOPERS
Shree Parshwanath
Darshan Anil Lodha
Anandsagar Annex Phase 1 ( L and M Wing )
Ravi Mahajan Builders & Developers Pvt. Lt
SHREEJI INSPERIA
Shreeji Landmarks LLP
Pawa Blossom
Pawa Construction
Bait E Muhammad Phase 1
Onyx Constructions
See every Nashik project, with the district possession charts
Builder: DSV DEVELOPERS
DSV DEVELOPERS has 1 registration on MahaRERA, including DSV PRESTIGE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if DSV PRESTIGE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DSV PRESTIGE?
The registered promoter entity is DSV DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DSV PRESTIGE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DSV PRESTIGE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DSV PRESTIGE?
The professionals named in the filing: Architect: KAPIL THAKKAR AND ASSOCIATES Thakkar; Engineer: JAYESH MAKWANA; Engineer: MOHAMMED ARSHAD RASHID KHAN; Chartered Accountant: SHUBHAM MUNDADA; Chartered Accountant: MAYUR SUNIL KOTHAWADE; Chartered Accountant: AMRUTKAR BRAHMANKAR & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DSV PRESTIGE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback