DSK MAYURBAN

By D S Kulkarni Developers Limited

RG-MH-20372 · RERA P52100004304 · Last updated on MahaRERA portal: 31 Jul 2017

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 72 months past the filed date
  • 61 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2020Possession promised72 months past this date
15 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 46%
61Complaints at MahaRERAon this registration
Jump to the 18 documents Report an error

DSK MAYURBAN is a Residential / Group Housing project by D S Kulkarni Developers Limited in Pune, Maharashtra, registered with MahaRERA as P52100004304 on 9 Aug 2017. Possession was promised by 30 Oct 2020 and is now 72 months past that date. 61 complaints are on record with the regulator.

At a glance

Project

  • NameDSK MAYURBAN
  • TypeResidential / Group Housing
  • Location
    • Pirangut
    • Mulshi
    • Pune
    • 411042
  • Pincode411042
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004304
  • ReraGenie IDRG-MH-20372

Builder

  • NameD S Kulkarni Developers Limited
  • Entity typeCompany
  • Managing DirectorBhushan Vilas Palresha
  • Other registrations5 more →
  • No longer live6 lapsed, de-registered or revoked

Key dates

72 months past promisethis monthRegisteredAug 2017PromisedOct 2020

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2017
  • Promised completion30 Oct 2020
  • Revised completionNone
  • Buildings3 building records
  • Documents filed18 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA150000
BNA150000
CNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 31 Jul 2017, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 46%.

A49%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure42%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B50%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure46%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C49%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure39%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Jul 2017, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes15%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes10%
Open ParkingYes10%

Parking filed334

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots334
Closed/Covered193
Open Space141
BuildingClosed/CoveredOpen SpaceTotal
A6047107
B6747114
C6647113

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,900 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15563.33
Proposed, not sanctioned15,550 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBajirao Road

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPLANARC
PartnerRole in project
D S Kulkarni Developers Limited-

Litigation declared1

CaseCourtStatus
32/2014District and Session Court PuneRemand

Complaints filed with MahaRERA61

Case no.ComplainantRespondentFiled
CC005000000000317Ganesh LonkarD.S.Kulkarni Developers Limited28/09/2017
CC005000000010862Harshal BhatDeepak Sakharam Kulkarni14/01/2018
CC005000000011048Mrs Ranjan Ratnakar DeshpandeD. S. KULKARNI DEVELOPERS LIMITED19/02/2018
CC005000000011232Onkar MangaonkarD. S. Kulkarni Developers Ltd.21/03/2018
CC005000000010815Ninad DeshpandeD.S. Kulkarni developers limited19/01/2018
CC005000000010899Manali Deepak DeshpandeD.S.Kulkarni Developers Ltd.22/07/2018
CC005000000010858Mrs. Renuka Ganesh Choudhari and Mr. Ganesh Bhaurao ChoudhariD. S. KULKARNI DEVELOPERS LIMITED, PUNE and Mrs. Hemanti Kulkarni28/02/2018
CC005000000010855Narendra BhagathD S Kulkarni Developers Limited18/01/2018
CC005000000010856SANDEEP WAGHD.S.KULKARNI DEVELOPERS LTD22/01/2018
CC005000000010869Vinay Vishwas PeshaveDeepak Sakharam Kulkarni14/01/2018
CC005000000010860SHRIKANT RAMESH CHANDURKARDeepak Sakharam Kulkarni15/01/2018
CC005000000010863Ramesh PardhiDeepak Sakharam Kulkarni14/01/2018
CC005000000010868Vivek Sharad ChavareDeepak Sakharam Kulkarni13/01/2018
CC005000000010865Ashwini Sharad PoreDeepak Sakharam Kulkarni14/01/2018
CC005000000010866Virendra Dhananjay KhardeDeepak Sakharam Kulkarni13/01/2018
CC005000000010871Aniruddh Ganesh ChandwankarDEEPAK SAKHARAM KULKARNI14/01/2018
CC005000000010867UMESH SHAMRAO BHOSALEDEEPAK SAKHARAM KULKARNI15/01/2018
CC005000000010877Amol Ashok LadDeepak Sakharam Kulkarni14/01/2018
CC005000000010876Sumit NavreDeepak Sakharam Kulkarni14/01/2018
CC005000000010872VIPRA AMOL KARMARKARDEEPAK SAKHARAM KULKARNI14/01/2018
CC005000000010878Prasad JadhavDeepak Sakharam Kulkarni14/01/2018
CC005000000010886Siddharth Dhananjay VanarseDEEPAK SAKHARAM KULKARNI20/01/2018
CC005000000010887Yogita Makarand KulkarniDEEPAK SAKHARAM KULKARNI15/01/2018
CC005000000010897Yogesh Anil YalgudkarDeepak Sakharam Kulkarni14/01/2018
CC005000000010888SACHIN VAMANRAO SONAWANED.S.Kulkarni Developers LTD and Hemanti Deepak Kulkarn17/01/2018
CC005000000010893VASANT VISHNU VAIDYADEEPAK SAKHARAM KULKARNI15/01/2018
CC005000000010895SAGAR GAJANANRAO HAGEDEEPAK SAKHARAM KULKARNI14/01/2018
CC005000000010922SIDDHESH GANESH CHANDWANKARDEEPAK SAKHARAM KULKARNI18/01/2018
CC005000000010902abhay vasudevrao mulateDEEPAK SAKHARAM KULKARNI15/01/2018
CC005000000010908Amol Subhash JadhavDeepak Sakharam Kulkarni17/01/2018
CC005000000010907PRAFULL VISHWANATH DALVIDEEPAK SAKHARAM KULKARNI15/01/2018
CC005000000010909Pankaj Vinayak NeurgaonkarD S KULKARNI DEVELOPERS LTD16/02/2018
CC005000000010913suyog tajnedeepak sakharam kulkarni16/01/2018
CC005000000010935AVINASH BHIKAJI KIRTIKARVED S Kulkarni Developers18/01/2018
CC005000000010926VIVEK VISHWAS PESHAVEDeepak Sakharam Kulkarni16/01/2018
CC005000000010953GANESH BHALCHANDRA WADEKARD S KULKARNI DEVELOPERS LTD.25/01/2018
CC005000000010954Gururaj Sriniwas KulkarniDeepak Sakharam Kulkarni26/01/2018
CC005000000010961Pranav KumarD. S. Kulkarni Developers Ltd.24/01/2018
CC005000000010966Dr. Shilpa ThakurD. S. Kulkarni developers limited23/01/2018
CC005000000010970Sunita Mahesh KulkarniDeepak Sakharam Kulkarni24/01/2018
CC005000000011022Anuradha S. Renapurkar and OrsD.S. Kulkarni Developer Ltd Through its Directors05/03/2018
CC005000000011066Hemant MalekarD S Kulkarni developers05/03/2018
CC005000000011247Kartik Gurunathan Iyer through his POA holder Mr. Ashok SapreM/s D.S. Kulkarni Developers Ltd25/03/2018
CC005000000011075Vishakha KulkarniD. S. Kulkarni Developers Limited04/03/2018
CC005000000011081ROHINI ABHISHEK KALLIANPUR, ABHISHEK AJIT KALLIANPURDIPAK SAKHARAM KULKARNI (DSK BUILDER)05/03/2018
CC005000000011082Prashant HebareDeepak Sakharam Kulkarni28/02/2018
CC005000000011085Ketan InamdarD.S.Kulkarni Developers Ltd.06/03/2018
CC005000000011105Prakash karwaD.S.Kulkarni Developers Ltd.01/03/2018
CC005000000011111Akshay Arun JadhavD.S.Kulkarni Developers Ltd06/03/2018
CC005000000011158AMITA PRABHUDS Kulkarni Developers Ltd.11/03/2018
CC005000000011186Anujit Ajit ThuseD. S. Kulkarni Developers Ltd.15/06/2018
CC005000000011197Ashwini KashilkarD. S. Kulkarni Devlopers Ltd.25/03/2018
CC005000000011236Nikhil Nitin TanpureD. S. Kulkarni Developers Ltd.21/03/2018
CC005000000011422Chaitanya Vijay KarandikarD.S. Kulkarni28/04/2019
CC005000000011513GAJANAN BHASKAR MOTEGAONKARD.S.KULKARNI DEVELOPERS LTD17/07/2018
CC005000000011662Abhay GodboleD. S. KULKARNI DEVELOPERS LTD.16/02/2019
CC005000000011859Parth Dilip BalDS Kulkarni Developers Ltd.16/08/2018
CC005000000022230Parixit AsharD.S.Kulkarni Developers Ltd.15/11/2018
CC005000000022250SHUBHADA VILAS KULKARNID. S. KULKARNI DEVELOPERS LIMITED13/06/2019
CC005000000022481ASHISH AVINASH GORULED.S. KULKARNI DEVELOPERS LIMITED11/03/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed18

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Copy of the legal title reportFile: TITLE REPORT.pdf31 Jul 2017
Details of encumbrancesFile: Scan Mayurban.pdf31 Jul 2017
Certificates of CA (Form 3)File: DSK Mayurban CA Certificate.pdf31 Jul 2017
Proforma of Allotment letterFile: agreement - dsk mayurban- flat.pdf31 Jul 2017
Building plan approvalFile: 2.pdf30 Jul 2017
Building plan approvalFile: 3.pdf30 Jul 2017
Building plan approvalFile: 7.pdf30 Jul 2017
Building plan approvalFile: 11.pdf30 Jul 2017
Layout approvalFile: 1.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: 1.pdf30 Jul 2017
Building Plan Approval (IOD)File: 2.pdf30 Jul 2017
Building Plan Approval (IOD)File: 3.pdf30 Jul 2017
Building Plan Approval (IOD)File: 7.pdf30 Jul 2017
Building Plan Approval (IOD)File: 11.pdf30 Jul 2017
Declaration in FORM BFile: Form B_DSK Mayurban_DSKDL.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_DSK Mayurban_DSKDL.pdf30 Jul 2017
Proforma of Allotment letterFile: Allotment letter.pdf30 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DSK MAYURBAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pirangut13,700+ in Pune

2 kmDSK MAYURBANCompleted 6Lapsed / revoked 8Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: D S Kulkarni Developers Limited

D S Kulkarni Developers Limited has 6 registrations on MahaRERA, including DSK MAYURBAN and DSK NANDANVAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that DSK MAYURBAN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if DSK MAYURBAN is delayed beyond 30 Oct 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DSK MAYURBAN?

The registered promoter entity is D S Kulkarni Developers Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DSK MAYURBAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DSK MAYURBAN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for DSK MAYURBAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DSK MAYURBAN?

The professionals named in the filing: Architect: PLANARC. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DSK MAYURBAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DSK MAYURBAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DSK MAYURBAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.