RG-MH-17310 · RERA P52100028500 · Last updated on MahaRERA portal: 24 Feb 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Dreams Carnival- B Building is a Residential / Group Housing project by Sam Developers in Pune, Maharashtra, registered with MahaRERA as P52100028500 on 8 Mar 2021. The registration is recorded completed; possession was promised by 30 Apr 2024.
At a glance
Project
- NameDreams Carnival- B Building
- TypeResidential / Group Housing
- Location
- PUNE-ALANDI ROAD
- CHARHOLI PHATA
- CHARHOLI
- Haveli
- Pune
- 412105
- Pincode412105
- RERA no.P52100028500
- ReraGenie IDRG-MH-17310
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Mar 2021
- Promised completion30 Apr 2024
- Revised completionNone
- Buildings1 building record
- Documents filed61 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Dreams Carnival- B Building | NA | 15 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Dreams Carnival- B Building: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed36
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SAHEBRAO NARAYAN TAPKIR | CHARHOLI | Pune |
| TAPKIR SAHEBRAO NARAYAN | CHARHOLI | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MAHENDRA THAKUR |
| Engineer | R K RANDHAVE |
| Engineer | SHRIYASH TAPKIR |
| Chartered Accountant | CA VAIBHAV MODI |
| Partner | Role in project |
|---|---|
| Sam Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Feb 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Oct 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 Dec 2023
Documents filed61
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Upload com.pdf | 24 Feb 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation.pdf | 21 Dec 2024 |
| Status of ConveyanceFile: Upload Conveyance deed DREAMS CARIVAL A And B WING.pdf | 21 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Final Form 4.pdf | 7 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 PS.pdf | 31 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf | 12 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Upload.pdf | 10 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final Form 1.pdf | 10 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final Form 1.pdf | 10 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2.pdf | 10 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2 Upload.pdf | 10 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2.pdf | 10 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: final Form 2.pdf | 10 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29 31-12-2022 (1).pdf | 10 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29 31-03-2023 (1).pdf | 10 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29 30-06-2023 (1).pdf | 10 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Uploaded_compressed.pdf | 10 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 ca_compressed.pdf | 10 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 upload compressed.pdf | 10 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 compress.pdf | 10 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 DREAMS CARNIVAL B WING.pdf | 3 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2.pdf | 3 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A.pdf | 3 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: BOOKED INVENTORY B WING.pdf | 3 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Sam Dev Dreams Carnival B Building Form 5.PDF | 22 Oct 2022 |
| Layout approvalFile: Layout Approval final.pdf | 8 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Approval final.pdf | 8 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1.pdf | 16 Jul 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg form1-converted.pdf | 16 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FROM 2A_compressed.pdf | 16 Jul 2021 |
| Building plan approvalFile: 1_compressed.pdf | 15 Jul 2021 |
| Building plan approvalFile: 2_compressed.pdf | 15 Jul 2021 |
| Building plan approvalFile: 3_compressed.pdf | 15 Jul 2021 |
| Building plan approvalFile: 4_compressed.pdf | 15 Jul 2021 |
| Building plan approvalFile: 5_compressed.pdf | 15 Jul 2021 |
| Building plan approvalFile: 6_compressed.pdf | 15 Jul 2021 |
| Building plan approvalFile: 7_compressed.pdf | 15 Jul 2021 |
| Building plan approvalFile: 8_compressed.pdf | 15 Jul 2021 |
| Building plan approvalFile: 9_compressed.pdf | 15 Jul 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 1_compressed.pdf | 15 Jul 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 2_compressed.pdf | 15 Jul 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 3_compressed.pdf | 15 Jul 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 4_compressed.pdf | 15 Jul 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 5_compressed.pdf | 15 Jul 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 6_compressed.pdf | 15 Jul 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 7_compressed.pdf | 15 Jul 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 8_compressed.pdf | 15 Jul 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 9_compressed.pdf | 15 Jul 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE-compressed.pdf | 15 Jul 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Scanned FINAL.pdf | 26 Feb 2021 |
| Proforma of Allotment letterFile: Allotment Letter rera.pdf | 25 Feb 2021 |
| Proforma of Allotment letterFile: Agreement to sale.pdf | 25 Feb 2021 |
| Layout approvalFile: Layout final.pdf | 24 Feb 2021 |
| Building plan approvalFile: Layout final.pdf | 24 Feb 2021 |
| PAN CardFile: PAN CARD.pdf | 24 Feb 2021 |
| Copy of the legal title reportFile: Search Title.pdf | 24 Feb 2021 |
| Details of encumbrancesFile: Encumbrance letter.pdf | 24 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Layout final.pdf | 24 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout final.pdf | 24 Feb 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: commissiment certificate.pdf | 24 Feb 2021 |
| Declaration in FORM BFile: Form B Promoter_compressed.pdf | 24 Feb 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 61 filed documents as one ZIP, foldered, with a manifest
Keep Dreams Carnival- B Building on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHARHOLI PHATA13,700+ in Pune
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: Sam Developers
Sam Developers has 3 registrations on MahaRERA, including Dreams Carnival-A building and Dreams Carnival- B Building. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Dreams Carnival- B Building is delayed beyond 30 Apr 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Dreams Carnival- B Building?
The registered promoter entity is Sam Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Dreams Carnival- B Building?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Dreams Carnival- B Building?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Dreams Carnival- B Building?
The professionals named in the filing: Architect: MAHENDRA THAKUR; Engineer: R K RANDHAVE; Engineer: SHRIYASH TAPKIR; Chartered Accountant: CA VAIBHAV MODI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Dreams Carnival- B Building?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback