Home / Browse projects / Pune, Maharashtra / DREAM PARK
DREAM PARK
RG-MH-27661 · RERA P52100034399 · Last updated on MahaRERA portal: 6 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DREAM PARK is a Residential / Group Housing project by D S Construction in Pune, Maharashtra, registered with MahaRERA as P52100034399 on 5 Apr 2022. Possession is promised by 31 Dec 2026. 29 of the 34 units on this registration are recorded sold or booked, and 33 of 66 construction stages are filed complete.
At a glance
Project
- NameDREAM PARK
- TypeResidential / Group Housing
- Location
- Jalochi
- Baramati
- Pune
- 413102
- Pincode413102
- RERA no.P52100034399
- ReraGenie IDRG-MH-27661
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Apr 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings6 building records
- Documents filed83 files
Current status
Figures as on 6 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RH - 01 to 12 | NA | 2 | 2 | 10 | 0 | 10 |
| Bungalow - 1 and 2 | NA | 2 | 2 | 2 | 0 | 2 |
| Bungalow 3 | NA | 2 | 2 | 1 | 0 | 1 |
| Twin - 01 to 04 and 09 to 12 | NA | 2 | 2 | 8 | 0 | 8 |
| Twin - 05 to 08 | NA | 2 | 2 | 2 | 0 | 2 |
| Building No 1 | NA | 6 | 5 | 11 | 0 | 11 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
33 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 95%.
RH - 01 to 1273%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Bungalow - 1 and 273%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Bungalow 373%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Twin - 01 to 04 and 09 to 1263%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 92% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 92% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Twin - 05 to 0865%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Building No 162%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Progress on shared amenities15
As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 60% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 90% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed9
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Shankarrao & Bharat Jamdade | Pune (CB) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RH - 01 to 12 | NA | Rs 80.42 lakh | Rs 68.42 lakh |
| Bungalow - 1 and 2 | NA | Rs 80.42 lakh | Rs 68.42 lakh |
| Bungalow 3 | NA | Rs 80.42 lakh | Rs 68.42 lakh |
| Twin - 01 to 04 and 09 to 12 | NA | Rs 80.42 lakh | Rs 68.42 lakh |
| Twin - 05 to 08 | NA | Rs 80.42 lakh | Rs 68.42 lakh |
| Building No 1 | NA | Rs 80.42 lakh | Rs 68.42 lakh |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shreeraj Associates |
| Architect | Amit Sadanand Gaikwad |
| Engineer | Shreeraj Associates |
| Engineer | Tajuddin M Shaikh |
| Chartered Accountant | M/s Anurag Meherwal And Co. |
| Chartered Accountant | R H Pothiwal & Associates |
| Chartered Accountant | Pravin Pise |
| Partner | Role in project |
|---|---|
| D S Construction | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed83
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: F1 Dream park Dec 2025.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: F1 Dream Park March 2026.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: F1 Dream park Dec 2025.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: F2 - Dream Park - Dec 2025.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: F2 - Dream Park -March 2026.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: F2 - Dream Park - Dec 2025.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: F3-DREAM PARK(DEC-25).pdf | 6 May 2026 |
| Withdrawal Update Form 3File: F3-DREAM PARK(MARCH-26).pdf | 6 May 2026 |
| Withdrawal Update Form 3File: F3-DREAM PARK(DEC-25).pdf | 6 May 2026 |
| Withdrawal Update Form 1File: Form 1 Jun 2025.pdf | 8 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Sep 2025.pdf | 8 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Jun 2025.pdf | 8 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Sep 25.pdf | 8 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate_Dreampark_Jun-25.pdf | 8 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate_Dreampark_Sep-25.pdf | 8 Apr 2026 |
| Form 1File: Ar - June 22.pdf | 1 Jul 2025 |
| Form 2File: ER - June 2022.pdf | 1 Jul 2025 |
| Form 3File: CA - jun 2022.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Jun 2022.pdf | 1 Jul 2025 |
| Form 1File: Ar - Sep 22.pdf | 1 Jul 2025 |
| Form 2File: ER - September 2022.pdf | 1 Jul 2025 |
| Form 3File: CA - sep 2022.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Sep 2022.pdf | 1 Jul 2025 |
| Form 1File: Ar - Dec 22.pdf | 1 Jul 2025 |
| Form 2File: ER - December 2022.pdf | 1 Jul 2025 |
| Form 3File: CA - Dec 2022.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 2022.pdf | 1 Jul 2025 |
| Form 1File: Ar - March 23.pdf | 1 Jul 2025 |
| Form 2File: ER - March 2023.pdf | 1 Jul 2025 |
| Form 3File: CA - March 2023.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 2023.pdf | 1 Jul 2025 |
| Form 1File: Ar - June 23.pdf | 1 Jul 2025 |
| Form 2File: ER - June 2023.pdf | 1 Jul 2025 |
| Form 3File: CA - jun 2023.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Jun 2023.pdf | 1 Jul 2025 |
| Form 1File: Ar - Sep 23.pdf | 1 Jul 2025 |
| Form 2File: ER - September 2023.pdf | 1 Jul 2025 |
| Form 3File: CA - Sep 2023.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Sep 2023.pdf | 1 Jul 2025 |
| Form 1File: Ar - Dec 2023.pdf | 1 Jul 2025 |
| Form 2File: ER - Dec 2023.pdf | 1 Jul 2025 |
| Form 3File: CA - Dec 2023.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 2023.pdf | 1 Jul 2025 |
| Form 1File: Ar - March 2024.pdf | 1 Jul 2025 |
| Form 2File: ER - March 2024.pdf | 1 Jul 2025 |
| Form 3File: CA - March 2024.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 2024.pdf | 1 Jul 2025 |
| Form 1File: Ar - June 24.pdf | 1 Jul 2025 |
| Form 2File: ER - June 2024.pdf | 1 Jul 2025 |
| Form 3File: CA - Jun 2024.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Jun 2024.pdf | 1 Jul 2025 |
| Form 1File: Ar - Sep 24.pdf | 1 Jul 2025 |
| Form 2File: ER - September 2024.pdf | 1 Jul 2025 |
| Form 3File: CA - Sep 2024.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Sep 2024.pdf | 1 Jul 2025 |
| Form 1File: Ar - Dec 2024.pdf | 1 Jul 2025 |
| Form 2File: ER - December 2024.pdf | 1 Jul 2025 |
| Form 3File: CA - Dec 2024.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 2024.pdf | 1 Jul 2025 |
| Form 1File: Ar - March 2025.pdf | 1 Jul 2025 |
| Form 2File: ER - March 2025.pdf | 1 Jul 2025 |
| Form 3File: CA - March 2025.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 2025.pdf | 1 Jul 2025 |
| Withdrawal Update Form 1File: Ar - March 2025.pdf | 1 Jul 2025 |
| Withdrawal Update Form 2File: ER - March 2025.pdf | 1 Jul 2025 |
| Withdrawal Update Form 3File: CA - March 2025.pdf | 1 Jul 2025 |
| CERSAI detailsFile: CERSAI Report.pdf | 22 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 22 Mar 2022 |
| Layout approvalFile: Layout.pdf | 17 Mar 2022 |
| Building plan approvalFile: Plan 1.pdf | 17 Mar 2022 |
| Building plan approvalFile: Plan 2.pdf | 17 Mar 2022 |
| Building plan approvalFile: Plan 3.pdf | 17 Mar 2022 |
| PAN CardFile: PAN Card.pdf | 17 Mar 2022 |
| Copy of the legal title reportFile: Title Search Report Annexure.pdf | 17 Mar 2022 |
| Details of encumbrancesFile: Encumbrance Certificate.pdf | 17 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 17 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf | 17 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 17 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf | 17 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 17 Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 83 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DREAM PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Baramati13,700+ in Pune
Vrundavan Park
Sunil Ganpati Aitavadekar
SAINAGAR
SHRIMUDRA CONSTRUCTION
MAGIC GREEN CITY PART 2
Magic Homes
ARYA SQUARE
SAIRAJ INFRA
SWAPNAPURTI
Mandar Shrikant Sikachi
Deshpande Somani Square
Somani Landmarks LLP
Builder: D S Construction
D S CONSTRUCTION has 4 registrations on MahaRERA, including SWAPNA PRIDE and DREAM PARK. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if DREAM PARK is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DREAM PARK?
The registered promoter entity is D S Construction, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DREAM PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DREAM PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DREAM PARK?
The professionals named in the filing: Architect: Shreeraj Associates; Architect: Amit Sadanand Gaikwad; Engineer: Shreeraj Associates; Engineer: Tajuddin M Shaikh; Chartered Accountant: M/s Anurag Meherwal And Co.; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DREAM PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback