Home / Browse projects / DOSTI MEZZO 22

Registered No litigation declared Residential / Group Housing project

DOSTI MEZZO 22

By MAITRI ASSOCIATES

RG-MH-28785 · RERA P51900026976 · Last updated on MahaRERA portal: 7 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 9 months
  • 1 extension taken
  • Rs 2.00 crore secured on the land, in favour of Aditya Birla Finance limited

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Mar 2027Possession promisedmoved 9 months from the original
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
13 of 303Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 142 documents Report an error

DOSTI MEZZO 22 is a Residential / Group Housing project by MAITRI ASSOCIATES in SION, 400022, registered with MahaRERA as P51900026976 on 7 Nov 2020. Possession is promised by 31 Mar 2027. The completion date has moved by 9 months from the original filing. 290 of the 303 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameDOSTI MEZZO 22
  • TypeResidential / Group Housing
  • Location
    • ROAD NO 29
    • SION
    • 400022
  • Pincode400022
  • RERA no.P51900026976
  • ReraGenie IDRG-MH-28785

Builder

  • NameMAITRI ASSOCIATES
  • Entity typeOthers
  • Named personsDEEPAK KISHAN GORADIA, RAJUL VRAJLAL VORA, RAJESH PREMJI SHAH
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2020First promiseJun 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Nov 2020
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 30 Jun 2026)
  • Buildings2 building records
  • Documents filed142 files

Current status

96%290 of 303 units booked
92.0%Work done, per cost certificate

Figures as on 7 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DOSTI MEZZO 22 WING ANA36291090109
DOSTI MEZZO 22 WING BNA36291940194

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

DOSTI MEZZO 22 WING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
DOSTI MEZZO 22 WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed455

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots455
Closed/Covered455
BuildingClosed/CoveredTotal
DOSTI MEZZO 22 WING A224224
DOSTI MEZZO 22 WING B231231

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,544 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance limited
Secured amountRs 2.00 crore
Declared on17 Jul 2025

Approvals and building plan

Sanctioning authorityTMC
Permissible FSI31098.0
Proposed, not sanctioned26,823 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, MANEKJI WADIA BUILDING, NANIK MOTWANI MARG, MUMBAI 400001
Estimated costRs 270.00 cr
Cost incurredRs 248.52 cr
Work done92.05%
BuildingWingEstimatedIncurred
DOSTI MEZZO 22 WING ANARs 127.99 crRs 120.51 cr
DOSTI MEZZO 22 WING BNARs 127.99 crRs 120.51 cr
-NARs 14.03 crRs 7.50 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Jay R Vora
ArchitectRAMNANI & ASSOCIATES
EngineerSWAPNIL kambli
EngineerSwapnil Londhe
EngineerVaibhav Raghunath Kalambate
Chartered AccountantMANISH
Chartered AccountantBAGADE AND ASSOCIATES
PartnerRole in project
MAITRI ASSOCIATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20062621450Jun 2026 → Mar 2027

Reason as filed by the promoterWe are the promoters of a real estate project called “Dosti Mezzo 22” comprising of one Building having 2 Wings i.e. Wing A and Wing B (corresponding Wing A and Wing B as per Municipal sanctioned plan) situated on land bearing Survey No. 403 / 6 of Sion Division on F/N Ward, Plot no. 103 of Sion-Matunga Estate on Road No. 29 of Sion (East), Mumbai - 400 022 and duly registered with MahaRERA under registration no. P51900026976, (“Project”). The Project completion date as per the Registration Certificate issued by MahaRERA is 30th June, 2026. The construction of the Project building is already c

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503407narendra daulatrao jadhavMAITRI ASSOCIATES23/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed142

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 142 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architects Certificate Dosti Mezzo 22.pdf7 Aug 2026
Withdrawal Update Form 2File: Maitri Associates Mezzo Form 2 Jun26.pdf7 Aug 2026
Withdrawal Update Form 3File: Maitri Associates Mezzo Form 3 Jun26.pdf7 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A - MA Dosti Mezzo.pdf25 Jun 2026
Withdrawal Update Form 1File: Maitri Associates Mezzo Form 1 Mar26.pdf2 May 2026
Withdrawal Update Form 2File: Maitri Associates Mezzo Form 2 Mar26.pdf2 May 2026
Withdrawal Update Form 3File: Maitri Associates Mezzo Form 3 Mar26.pdf2 May 2026
Withdrawal Update Form 1File: Maitri Associates Mezzo Form 1 Dec25.pdf23 Jan 2026
Withdrawal Update Form 2File: Maitri Associates Mezzo Form 2 Dec25.pdf23 Jan 2026
Withdrawal Update Form 3File: Maitri Associates Mezzo Form 3 Dec25.pdf23 Jan 2026
Withdrawal Update Form 1File: Maitri Dosti Mezzo Form1 Sep25.pdf29 Nov 2025
Withdrawal Update Form 2File: Maitri Associates - Mezzo - Form 2 - Septu002725.pdf29 Nov 2025
Withdrawal Update Form 3File: Maitri Associates - Mezzo - Form 3 - Septu002725.pdf29 Nov 2025
Form 5 (FY 2024-2025)File: Maitri Mezzo22.pdf12 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Mezzo Arch Certificate.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dosti Mezzo CA Certificate April2025.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dosti Mezzo Engineer certificate March2025.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: Dosti Mezzo 22.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Dosti Mezzo Quality Certificate.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Mezzo Architect certificate Dec2024.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dosti Mezzo CA certificate Dec2024.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dosti Mezzo Engineer Certificate.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Dosti Mezzo 22.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: Dosti Mezzo22.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dosti Mezzo22 Form3 Sep2024.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Mezzo22 Form1 Sep24.pdf13 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dosti Mezzo22 Form3 Sep24.pdf13 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dosti Mezzo22 Form2 Sep24.pdf13 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Dosti Mezzo 22.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: 3-0 Dosti Mezzo22.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Mezzo22 Form1 Arch-June 2024.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dosti Mezzo22 Form2 Engg - June 2024.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dosti Mezzo22 Form3 CA- June 2024.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Dosti Mezzo22.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Dosti Mezzo 22.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Dosti Mezzo 22.pdf24 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Dosti mezzo22.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti Mezzo.pdf24 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Mezzo.pdf29 Mar 2024
Details of encumbrancesFile: Mezzo - Financial Encumbrances Certificate - for RERA upload.pdf19 Mar 2024
Disclosure of sold/ booked inventoryFile: Dosti Mezzo 22 MA.pdf4 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mezzo_Form 1 Dosti Mezzo Arch Certificate - Dec 2023 (1).pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Dosti Mezzo.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti Mezzo 22.pdf16 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 2404281_FurtherCC_signed.pdf12 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5-Dosti Mezzo-22.pdf28 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-Form-3- Mezzo-22-June23.pdf13 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-Form-3-Mezzo-22-Dec-23.pdf13 Dec 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part7.pdf29 Nov 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part8.pdf29 Nov 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part9.pdf29 Nov 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part10.pdf29 Nov 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part11.pdf29 Nov 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part12.pdf29 Nov 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part13.pdf29 Nov 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part14.pdf29 Nov 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part15.pdf29 Nov 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part16.pdf29 Nov 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part6.pdf29 Nov 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part5.pdf29 Nov 2023
Building plan approvalFile: Amendletter signed 28-11-23.pdf29 Nov 2023
Layout approvalFile: Extracted pages from Amended approved drawing 28-11-23.pdf29 Nov 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part2.pdf29 Nov 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part3.pdf29 Nov 2023
Layout approvalFile: Amended approved drawing 28-11-23 Part4.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Extracted pages from Amended approved drawing 28-11-23.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Amended approved drawing 28-11-23 Part2.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Amended approved drawing 28-11-23 Part3.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Amended approved drawing 28-11-23 Part4.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Amended approved drawing 28-11-23 Part5.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Amended approved drawing 28-11-23 Part6.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Amended approved drawing 28-11-23 Part7.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Amended approved drawing 28-11-23 Part8.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Amended approved drawing 28-11-23 Part9.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Amended approved drawing 28-11-23 Part10.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Amended approved drawing 28-11-23 Part11.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Amended approved drawing 28-11-23 Part12.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Amended approved drawing 28-11-23 Part13.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Amended approved drawing 28-11-23 Part14.pdf29 Nov 2023
Copy of Layout Approval (in case of layout)File: Amended approved drawing 28-11-23 Part15.pdf29 Nov 2023

Keep DOSTI MEZZO 22 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SION

Builder: MAITRI ASSOCIATES

MAITRI ASSOCIATES has 4 registrations on MahaRERA, including MAITRI AARAMBH and SHREE MAHALAXMI VILLAS PHASE-I. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if DOSTI MEZZO 22 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DOSTI MEZZO 22?

The registered promoter entity is MAITRI ASSOCIATES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DOSTI MEZZO 22?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DOSTI MEZZO 22?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for DOSTI MEZZO 22?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DOSTI MEZZO 22?

The professionals named in the filing: Architect: Architect Jay R Vora; Architect: RAMNANI & ASSOCIATES; Engineer: SWAPNIL kambli; Engineer: Swapnil Londhe; Engineer: Vaibhav Raghunath Kalambate; Chartered Accountant: MANISH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DOSTI MEZZO 22?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DOSTI MEZZO 22. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DOSTI MEZZO 22 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.