Home / Browse projects / Pune, Maharashtra / Dosti Greenscapes - Phase 4
Dosti Greenscapes - Phase 4
RG-MH-07432 · RERA P52100077092 · Last updated on MahaRERA portal: 22 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Dosti Greenscapes - Phase 4 is a Commercial project by DOSTI REALTY LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100077092 on 23 Jul 2024. Possession is promised by 31 Aug 2027. 42 of the 98 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameDosti Greenscapes - Phase 4
- TypeCommercial
- Location
- Haveli Hadapsar
- Hadapsar
- Haveli
- Pune
- 411013
- Pincode411013
- RERA no.P52100077092
- ReraGenie IDRG-MH-07432
Builder
- NameDOSTI REALTY LIMITED
- Entity typeCompany
- CINU70102MH2008PLC178101
- GSTIN27AACCD7714K1ZH
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorDEEPAK KISHAN GORADIA
- DirectorsRAJESH PREMJI SHAH, RAJUL VRAJLAL VORA
- Other registrations4 more →
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Jul 2024
- Promised completion31 Aug 2027
- Revised completionNone
- Buildings1 building record
- Documents filed67 files
Current status
Figures as on 22 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Dosti Boulevard - Commercial | NA | 9 | 8 | 0 | 98 | 98 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 50%.
Dosti Boulevard - Commercial: 32% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed74
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| THE INDIAN HUME PIPE COMPANY LIMITED | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Dosti Boulevard - Commercial | NA | Rs 28.33 cr | Rs 8.03 cr |
| - | NA | Rs 2.80 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARCHITECT JAY R VORA |
| Engineer | Paras R Vishwakarma |
| Engineer | SWAPNIL LONDHE |
| Engineer | Vaibhav Raghunath Kalambate |
| Chartered Accountant | Manish Bardia And Co |
| Chartered Accountant | BAGADE AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| DOSTI REALTY LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 May 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Aug 2027
Documents filed67
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A - DRL Dosti Greenscapes Ph 4.pdf | 22 Jun 2026 |
| Withdrawal Update Form 1File: DRL Greenscapes Ph 4 Form 1 Mar26.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: DRL Greenscapes Ph 4 Form 2 Mar26.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: DRL Greenscapes Ph 4 Form 3 Mar26.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: DRL Greenscapes Ph 4 Form 1 Dec25.pdf | 28 Jan 2026 |
| Withdrawal Update Form 2File: DRL Greenscapes Ph 4 Form 2 Dec25.pdf | 28 Jan 2026 |
| Withdrawal Update Form 3File: DRL Greenscapes Ph 4 Form 3 Dec25.pdf | 28 Jan 2026 |
| Withdrawal Update Form 1File: DRL Greenscape Phase 4 Form 1 Sept25.pdf | 29 Nov 2025 |
| Withdrawal Update Form 2File: DRL Greenscape Phase 4 Form 2 Sept25.pdf | 29 Nov 2025 |
| Withdrawal Update Form 3File: DRL Greenscapes Ph 4 Form 3 Sept25.pdf | 29 Nov 2025 |
| Form 5 (FY 2024-2025)File: DRL Pune PH4.pdf | 12 Nov 2025 |
| Form 1File: Dosti Greenscape PH4 Arch certificate June2025.pdf | 25 Jul 2025 |
| Form 2File: Dosti Greenscape PH4 Engineer certificate June2025.pdf | 25 Jul 2025 |
| Form 3File: Dosti Greenscape PH4 CA certificate June2025.pdf | 25 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DRL Greenscape PH4 Sold Unsold June2025.pdf | 25 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Dosti Greenscape PH4.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Greenscape PH4 Achitect's certificate March2025.pdf | 11 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dosti Greenscape PH4 CA Certificate April2025.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dosti Greenscape PH4 Engineer certificate March2025.pdf | 11 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Dosti Greenscape PH4 Quality certificate Form2A March2025.pdf | 11 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Greenscape Phase-4 Architect certificate.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dosti Greenscape Phase-4 CA certificate.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dosti Greenscape Phase-4 Engineer certificate.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Dosti Greenscape Phase-4 Sold Unsold.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Dosti greenscape PH4.pdf | 18 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Greenscape PH4 Form1 Sep24.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dosti Greenscape PH4 Form3 Sep24.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dosti Greenscape PH4 Form2 Sep24.pdf | 15 Oct 2024 |
| Other - LegalFile: Dosti letter.pdf | 16 Jul 2024 |
| Other - TechnicalFile: Phase 4.pdf | 10 Jul 2024 |
| CERSAI detailsFile: REVISED CERSAI 1.pdf | 9 Jul 2024 |
| Other - TechnicalFile: Dosti_letter[1].pdf | 8 Jul 2024 |
| Other - TechnicalFile: Dosti GreenScape Pune 7-12 New.pdf | 27 Jun 2024 |
| Other - TechnicalFile: Dosti Greenscape Pune 7-12 Old.pdf | 27 Jun 2024 |
| CERSAI detailsFile: Phase 4 declaration on cresai.pdf | 10 Jun 2024 |
| Other - TechnicalFile: Phase 4 declaration on CC addl.pdf | 10 Jun 2024 |
| Proforma of Allotment letterFile: Allotment letter pdf.pdf | 30 May 2024 |
| Proforma of Agreement for saleFile: RERA AFS - Greenscapes Phase 4 - Final.pdf | 30 May 2024 |
| Deviation Report with respect to model copy of AgreementFile: RERA AFS - Greenscapes Phase 4 - Deviation.pdf | 30 May 2024 |
| Copy of the legal title reportFile: Title Certificate Hadapsar.pdf | 29 May 2024 |
| Details of encumbrances concerned to FinanceFile: FIncancial and Legal Encumbrances.pdf | 29 May 2024 |
| Details of encumbrances concerned to LegalFile: FIncancial and Legal Encumbrances.pdf | 29 May 2024 |
| Declaration about Commencement CertificateFile: Declaration on CC.pdf | 29 May 2024 |
| Declaration in FORM BFile: Form B.pdf | 29 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure 1.pdf | 29 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure 2.pdf | 29 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure 3.pdf | 29 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure 4.pdf | 29 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Phase 4 bank declaration.pdf | 29 May 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment letter.pdf | 29 May 2024 |
| Other - LegalFile: DRL - General Authority BR.pdf | 27 May 2024 |
| Building plan approvalFile: Commercial Plan.pdf | 24 May 2024 |
| Building plan approvalFile: Commercial Plan 2.pdf | 24 May 2024 |
| Building plan approvalFile: Commercial Plan 3.pdf | 24 May 2024 |
| PAN CardFile: DRL PAN CARD.pdf | 24 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Commercial Plan.pdf | 24 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Commercial Plan 2.pdf | 24 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Commercial Plan 3.pdf | 24 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC GREENSCAPE letter.pdf | 24 May 2024 |
| CERSAI detailsFile: Cresai Details.pdf | 24 May 2024 |
| CERSAI detailsFile: Cresai Details 2.pdf | 24 May 2024 |
| Layout approvalFile: COMMERCIAL CC LAYOUT PLAN FOR RERA-Model comp.pdf | 23 May 2024 |
| Copy of Layout Approval (in case of layout)File: COMMERCIAL CC LAYOUT PLAN FOR RERA-Model comp.pdf | 23 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Dosti Greenscapes Phase 4.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Dosti Greenscape Phase 4.pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer's Certificate Quality Assurance 1.pdf | 23 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate -Dosti Geenscape Phase-4.pdf | 23 May 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Dosti Imperia - Dosti Majesta | Chitalsar Manpada Ghodbunder Road Majivade Taluka and District Thane | 56 | Completed | Dec 2018 | Dec 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 67 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Dosti Greenscapes - Phase 4 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hadapsar13,700+ in Pune
Dosti Greenscapes - Phase 1
DOSTI REALTY LIMITED
Dosti Greenscapes - Phase 3
DOSTI REALTY LIMITED
Dosti Greenscapes - Phase 2
DOSTI REALTY LIMITED
Dosti Greenscapes - Phase 5
DOSTI REALTY LIMITED
Songs From The Wood - Phase 1
Total Environment Building Systems Private
Songs From The Wood -Phase 2
Total Environment Building Systems Private
Builder: DOSTI REALTY LIMITED
DOSTI REALTY LIMITED has 5 registrations on MahaRERA, including Dosti Greenscapes - Phase 1 and Dosti Greenscapes - Phase 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Dosti Greenscapes - Phase 4 is delayed beyond 31 Aug 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Dosti Greenscapes - Phase 4?
The registered promoter entity is DOSTI REALTY LIMITED, a company as per the filing. Its CIN U70102MH2008PLC178101 and GSTIN 27AACCD7714K1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Dosti Greenscapes - Phase 4?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Dosti Greenscapes - Phase 4?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Dosti Greenscapes - Phase 4?
The professionals named in the filing: Architect: ARCHITECT JAY R VORA; Engineer: Paras R Vishwakarma; Engineer: SWAPNIL LONDHE; Engineer: Vaibhav Raghunath Kalambate; Chartered Accountant: Manish Bardia And Co; Chartered Accountant: BAGADE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Dosti Greenscapes - Phase 4?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback