Dnyanvishwa

By Dattakrupa Associates

RG-MH-26782 · RERA P52100014850 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 72 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 72 months from the original
31 of 40Construction stages doneacross 4 buildings; furthest along: Basement (if any), 0%
154 of 239Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 152 documents Report an error

Dnyanvishwa is a Others project by Dattakrupa Associates in Pune, Maharashtra, registered with MahaRERA as P52100014850 on 8 Jan 2018. Possession is promised by 31 Dec 2030. The completion date has moved by 72 months from the original filing. 85 of the 239 units on this registration are recorded sold or booked, and 31 of 40 construction stages are filed complete.

At a glance

Project

  • NameDnyanvishwa
  • TypeOthers
  • Location
    • Vadgoan Road
    • Dnyansagar Magal Karyalay
    • Alandi Rural
    • Khed
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100014850
  • ReraGenie IDRG-MH-26782

Builder

  • NameDattakrupa Associates
  • Entity typePartnership
  • PartnersVivekanand santram Botre, Ravindra Keru Lokhande, Akshay Nandkumar Thakur, Dnyaneshwar Maruti Waghmare
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJan 2018First promiseDec 2024Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jan 2018
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 1 Dec 2024)
  • Buildings4 building records
  • Documents filed152 files

Current status

36%85 of 239 units booked
88.7%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA111179483
B BuildingNA9864064
CommercialNA6602828
C BuildingNA9864064

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

31 of 40 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 0%.

A Building73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Building100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Commercial64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C Building71%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed812

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots812
Closed/Covered540
Open Space80
Stilt / Ground192
BuildingClosed/CoveredOpen SpaceStilt / GroundTotal
A Building181400221
B Building184400224
Commercial17500175
C Building00192192

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,106 sq m
Land owned byNot the promoter
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Oct 2025
LandownerVillageDistrict
Nandakumar DhabadeCHARHOLIPune
Balsheth ThakurSoluPune
Sachin KatePimpale SaudagarPune
Shankar KatePimpale SaudagarPune
Anil LokhandeMarkalPune
Sambhaji BhosleAlandi RuralPune

Approvals and building plan

Sanctioning authorityaalandi
Permissible FSI13969.18
Proposed, not sanctioned13,969 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAlandi
Estimated costRs 23.39 cr
Cost incurredRs 20.74 cr
Work done88.66%
BuildingWingEstimatedIncurred
A BuildingNARs 7.53 crRs 7.53 cr
B BuildingNARs 6.20 crRs 6.20 cr
C BuildingNARs 5.47 crRs 3.79 cr
CommercialNARs 2.48 crRs 2.36 cr
-NARs 1.71 crRs 85.57 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPravin Patil
Engineersamadhan kaldate
Chartered Accountantsvsurve andco
Chartered Accountantulhas mandhane
PartnerRole in project
Dattakrupa Associates-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA08102518060Dec 2024 → Dec 2030

Reason as filed by the promoterI am writing to formally request an extension for the ongoing construction project until 31/12/2030, due to several challenges we have encountered. These include financial constraints that delayed material procurement and labor, a shortage of skilled workers, and supply chain disruptions that hindered the timely delivery of essential materials. With sufficient funding now secured, we are actively addressing these issues and are confident the project will be completed by the new deadline.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Dec 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Dec 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 May 2024

Documents filed152

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 152 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCH CERTIFICATE JUN 26 DATTAKRUPA ASSOCIATE_removed.pdf20 Jul 2026
Withdrawal Update Form 2File: Revised Engineer Certificate JUN 2026 DV (1).pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 Dattakrupa Asso.pdf20 Jul 2026
Withdrawal Update Form 1File: DATTAKRUPA ASSOCIATES DV ARCH CERTIFICATE MARCH 2026_compressed.pdf20 Apr 2026
Withdrawal Update Form 2File: Revised Engineer Certificate MARCH 2026 DV.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Dattakrupa Asso.pdf20 Apr 2026
Withdrawal Update Form 1File: form 1_compressed.pdf22 Jan 2026
Withdrawal Update Form 2File: form 2.pdf22 Jan 2026
Withdrawal Update Form 3File: Form N0 3 DEC 2025 DV.pdf22 Jan 2026
Layout approvalFile: PLAN WITH DECLRATION.pdf13 Dec 2025
Building plan approvalFile: A BUILDING 06.pdf12 Dec 2025
Building plan approvalFile: A-BUILDING 05.pdf12 Dec 2025
Building plan approvalFile: B BUILDING 03.pdf12 Dec 2025
Building plan approvalFile: B BUILDING 04.pdf12 Dec 2025
Building plan approvalFile: C BUILDING 02.pdf12 Dec 2025
Building plan approvalFile: COMMERCIAL BUILDING 07.pdf12 Dec 2025
Layout approvalFile: LAYOUT.pdf28 Oct 2025
Building plan approvalFile: 2.pdf28 Oct 2025
Building plan approvalFile: 3.pdf28 Oct 2025
Building plan approvalFile: 4.pdf28 Oct 2025
Building plan approvalFile: 5.pdf28 Oct 2025
Building plan approvalFile: 6.pdf28 Oct 2025
Building plan approvalFile: 7.pdf28 Oct 2025
Withdrawal Update Form 1File: F1.pdf27 Oct 2025
Withdrawal Update Form 1File: form 1_compressed.pdf27 Oct 2025
Withdrawal Update Form 2File: F2.pdf27 Oct 2025
Withdrawal Update Form 2File: form 2.pdf27 Oct 2025
Withdrawal Update Form 3File: F3.pdf27 Oct 2025
Withdrawal Update Form 3File: CA.pdf27 Oct 2025
Form 1File: arc_page-0001.pdf8 Oct 2025
Form 2File: engg.pdf8 Oct 2025
Form 3File: ca 226.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOOD UN2026.pdf8 Oct 2025
Form 1File: F1.pdf4 Oct 2025
Form 2File: F2.pdf4 Oct 2025
Form 3File: F3.pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf4 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A-1.pdf4 Oct 2025
Form 5 (FY 2024-2025)File: Dattakrupa Asso Form 5 2024-25.pdf4 Oct 2025
Building plan approvalFile: 3.pdf24 Jun 2025
Building Plan Approval (IOD)File: 3.pdf24 Jun 2025
Building plan approvalFile: 2.pdf26 Apr 2025
Building plan approvalFile: 6.pdf26 Apr 2025
Building Plan Approval (IOD)File: 2.pdf26 Apr 2025
Building Plan Approval (IOD)File: 6.pdf26 Apr 2025
Declaration in FORM BFile: FORM B.pdf9 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DNYANVISHWA FORM 1 APRIL 2025.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30122022.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30122024.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30092024.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30062024.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30032024.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30122023.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30092023.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30062023.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30032023.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30092022.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30062022.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30032022.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30122021.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30092021.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30062021.pdf9 Apr 2025
Certificates of CA (Form 3)File: 30032021.pdf9 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Revised Engineer Certificate APRIL 2025 DV.pdf9 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Revised Engineer Certificate Feb2025.pdf25 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGGCIRTIFICATE 10 JAN 25.pdf14 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JULAY 2023.pdf12 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OCT 2023.pdf12 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Jan 2025.pdf12 Feb 2025
Certificates of CA (Form 3)File: Form 3 Sep 3_compressed.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory APRIL 2024.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory jan 2025.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory OCT 2024.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory JULY2024.pdf12 Feb 2025
Details of encumbrances concerned to FinanceFile: Financial Encumbrance Certificate1.pdf6 Feb 2025
Details of encumbrances concerned to FinanceFile: 2LEGAL encumbarance.pdf6 Feb 2025
CERSAI detailsFile: CERSAI DECLARATION.pdf6 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration of Separate Bank Account (1) (1).pdf6 Feb 2025
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf6 Feb 2025
Details of encumbrances concerned to LegalFile: 2LEGAL encumbarance.pdf6 Feb 2025

How this compares with Pune

36%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 72 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dnyanvishwa on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dnyansagar Magal Karyalay13,700+ in Pune

Builder: Dattakrupa Associates

DATTAKRUPA ASSOCIATES has 2 registrations on MahaRERA, including SIDDHA SAI and Dnyanvishwa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Dnyanvishwa is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dnyanvishwa?

The registered promoter entity is Dattakrupa Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dnyanvishwa?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dnyanvishwa?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dnyanvishwa?

The professionals named in the filing: Architect: Pravin Patil; Engineer: samadhan kaldate; Chartered Accountant: svsurve andco; Chartered Accountant: ulhas mandhane. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dnyanvishwa?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dnyanvishwa. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dnyanvishwa to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.