DNYANGANGA
RG-MH-45507 · RERA P52100052228 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DNYANGANGA is a Others project by INDRAYANI VENTURES in Pune, Maharashtra, registered with MahaRERA as P52100052228 on 31 Jul 2023. Possession is promised by 31 Mar 2033.
At a glance
Project
- NameDNYANGANGA
- TypeOthers
- Location
- ALANDI (DEVACHI )
- ALANDI DEVACHI
- Khed
- Pune
- 412105
- Pincode412105
- RERA no.P52100052228
- ReraGenie IDRG-MH-45507
Builder
- NameINDRAYANI VENTURES
- Entity typeOthers
- Named personsMr. Ramchandra Krishnarao Randhave, Mr. Dnyaneshwar Maruti Waghmare, Mr. ANil Chandrakant Kurhade, Mr. Ramesh Babanrao Gavhane, Mr. Hemant Gulabrao Kurhade
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Jul 2023
- Promised completion31 Mar 2033
- Revised completionNone
- Buildings4 building records
- Documents filed67 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 10 | 0 | 0 | 0 | 0 |
| BUILDING B | NA | 10 | 0 | 0 | 0 | 0 |
| BUILDING C | NA | 9 | 0 | 0 | 0 | 0 |
| BUILDING D | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 60%.
BUILDING A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING B55%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
BUILDING C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed65
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| BUILDING A | 7 | 7 |
| BUILDING B | 36 | 36 |
| BUILDING C | 10 | 10 |
| BUILDING D | 12 | 12 |
Land and ownership21
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shashikant Rajaram Kapre | Pune (M Corp.) | Pune |
| BHALCHANDRA RAJARAM KAPRE | Pune (M Corp.) | Pune |
| VIJAYA DNYANESHWAR JADHAV | Pune (M Corp.) | Pune |
| MANDAR GOVIND GAIKWAD | Pune (M Corp.) | Pune |
| AMIT GOVIND GAIKWAD | Pune (CB) | Pune |
| BHIMA SHARADCHANDRA VYAVHARE | Alandi Rural | Pune |
| SUNANDA KALURAM ALHAT | Pune (M Corp.) | Pune |
| MEERA VASANT JADHAV | Mumbai City | Mumbai City |
| KALURAM DNYANOBA KURHADE | Alandi (M Cl) | Pune |
| HIRABAI DNYANOBA KURHADE | Alandi (M Cl) | Pune |
| VAISHALI DNYANOBA KURHADE ALIAS VARPE | Markal | Pune |
| MAHAVRAO ALIAS MAHADEVRAO BABURAO KURHADE | Alandi (M Cl) | Pune |
| SAHADU BABURAO KURHADE | Alandi (M Cl) | Pune |
| CHANDRAKANT BABURAO KURHADE | Alandi (M Cl) | Pune |
| SIDHESH VILAS KURHADE | Alandi (M Cl) | Pune |
| AKSHADA PRAFFULA MUNGASE | Kelgaon | Pune |
| KAILAS MADHAVRAO KURHADE | Alandi (M Cl) | Pune |
| BALASAHEB MADHAVRAO KURHADE | Alandi (M Cl) | Pune |
| KAMAL KUNDALIK HARPALE | Fursungi | Pune |
| REKHA UMAKANT BHELKE | Pune (M Corp.) | Pune |
| SUBHASH SAHADU KURHADE | Alandi (M Cl) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | TECHNO ARCH |
| Engineer | SANGRAM RAMESH GAVHANE |
| Chartered Accountant | S V SURVASE & CO CA |
| Chartered Accountant | Ulhas Mandhane andco |
| Partner | Role in project |
|---|---|
| INDRAYANI VENTURES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2033
Documents filed67
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: INDRAYANI VENTURES DG ARCH CERTIFICATE MARCH 2026_compressed.pdf | 20 Apr 2026 |
| Form 2File: ENGG CIRTIFICATE FORM 2 INDRAYNI VENTURE MARCH 2026.pdf | 20 Apr 2026 |
| Form 3File: Form 3 Indrayani.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory DNYANGANGA ABC AND D WING MARCH 2026.pdf | 20 Apr 2026 |
| Form 1File: ARCH LETTER DEC 2025 DG_compressed.pdf | 22 Jan 2026 |
| Form 2File: ENGG CIRTIFICATE FORM 2 INDRAYNI VENTURE DEC 25.pdf | 22 Jan 2026 |
| Form 3File: Form N0 3 DEC 2025 DG.pdf | 22 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory DNYANGANGA ABC AND D WING DEC 2025.pdf | 22 Jan 2026 |
| Form 2File: form 2.pdf | 18 Oct 2025 |
| Form 3File: Form-3 Signed.pdf | 18 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: old unsold.pdf | 18 Oct 2025 |
| Form 1File: form 1_compressed.pdf | 18 Oct 2025 |
| Form 5 (FY 2024-2025)File: Indrayani Ventures Form 5 2024-25.pdf | 30 Sep 2025 |
| Form 1File: f1.pdf | 2 Aug 2025 |
| Form 2File: f2.pdf | 2 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf | 2 Aug 2025 |
| Form 3File: f3_compressed.pdf | 2 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect Lettr April 2025.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CIRTIFICATE FORM 2 INDRAYNI VENTURE APRIL 2025.pdf | 9 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Indrayani Dec 2024_compressed.pdf | 1 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DG JAN 25_compressed.pdf | 12 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Word DNYANGANGA (1).pdf | 12 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Certificate_compressed.pdf | 25 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Indrayani Ventures Form 5 FY 2023-24.pdf | 25 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUL-20204.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OCT-2024.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUL2024.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: OCT-2024.pdf | 18 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: APRIL 2023.pdf | 21 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: APRIL 2024.pdf | 21 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: jan 2024.pdf | 5 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: april 2024.pdf | 5 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2- APR 2024.pdf | 5 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-March 2024_compressed.pdf | 5 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2-JAN2024.pdf | 15 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2A-APR2021.pdf | 15 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM2A-APR2022.pdf | 15 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: INDRAYANI -JUL23-A.pdf | 1 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH_FORM1_JUL23.pdf | 1 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH_FORM1_OCT23.pdf | 1 Jan 2024 |
| Copy of the legal title reportFile: Indrayani Ventures Title Report (1).pdf | 25 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf | 8 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 23 Apr 2023 |
| Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf | 30 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: 1 Proforma of Allotment letter Ttoday-merged.pdf | 28 Mar 2023 |
| Building plan approvalFile: C WING_11zon.pdf | 11 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: C WING_11zon.pdf | 11 Mar 2023 |
| Proforma of Agreement for saleFile: NEW AGREEMENT FOR RERA ( MODEL AGREEMENT ) (3).pdf | 10 Mar 2023 |
| Building plan approvalFile: 1 Building Plan Approval A_11zon (1).pdf | 8 Mar 2023 |
| Building plan approvalFile: 1 Building Plan Approval B_11zon (1).pdf | 8 Mar 2023 |
| Building plan approvalFile: 1 Building Plan Approval C_11zon (1).pdf | 8 Mar 2023 |
| Building plan approvalFile: 1 Building Plan Approval D_11zon (1).pdf | 8 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval A_11zon (1).pdf | 8 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval B_11zon (1).pdf | 8 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval C_11zon (1).pdf | 8 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval D_11zon (1).pdf | 8 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf | 1 Mar 2023 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf | 28 Feb 2023 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 10 Feb 2023 |
| CERSAI detailsFile: CERSAI.pdf | 10 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances.pdf | 26 Dec 2022 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances.pdf | 26 Dec 2022 |
| Layout approvalFile: layout).pdf | 25 Dec 2022 |
| PAN CardFile: PAN Card indrani venture pan.pdf | 25 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: layout).pdf | 25 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: indrayni कमेंट्समेंट सर्टिफिकेट.pdf | 25 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow | 25 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 67 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DNYANGANGA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ALANDI DEVACHI13,700+ in Pune
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: INDRAYANI VENTURES
INDRAYANI VENTURES has 1 registration on MahaRERA, including DNYANGANGA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if DNYANGANGA is delayed beyond 31 Mar 2033?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DNYANGANGA?
The registered promoter entity is INDRAYANI VENTURES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DNYANGANGA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DNYANGANGA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DNYANGANGA?
The professionals named in the filing: Architect: TECHNO ARCH; Engineer: SANGRAM RAMESH GAVHANE; Chartered Accountant: S V SURVASE & CO CA; Chartered Accountant: Ulhas Mandhane andco. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DNYANGANGA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback