Home / Browse projects / Pune, Maharashtra / DNYANGANGA

Registered No litigation declared Others project

DNYANGANGA

By INDRAYANI VENTURES

RG-MH-45507 · RERA P52100052228 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2033Possession promisedno revision filed
4 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 60%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

DNYANGANGA is a Others project by INDRAYANI VENTURES in Pune, Maharashtra, registered with MahaRERA as P52100052228 on 31 Jul 2023. Possession is promised by 31 Mar 2033.

At a glance

Project

  • NameDNYANGANGA
  • TypeOthers
  • Location
    • ALANDI (DEVACHI )
    • ALANDI DEVACHI
    • Khed
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100052228
  • ReraGenie IDRG-MH-45507

Builder

  • NameINDRAYANI VENTURES
  • Entity typeOthers
  • Named personsMr. Ramchandra Krishnarao Randhave, Mr. Dnyaneshwar Maruti Waghmare, Mr. ANil Chandrakant Kurhade, Mr. Ramesh Babanrao Gavhane, Mr. Hemant Gulabrao Kurhade

Key dates

this monthRegisteredJul 2023PromisedMar 2033

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jul 2023
  • Promised completion31 Mar 2033
  • Revised completionNone
  • Buildings4 building records
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA100000
BUILDING BNA100000
BUILDING CNA90000
BUILDING DNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 60%.

BUILDING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
BUILDING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed65

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots65
Open Space65
BuildingOpen SpaceTotal
BUILDING A77
BUILDING B3636
BUILDING C1010
BUILDING D1212

Land and ownership21

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,790 sq m
Land owned byThe promoter, with other names on the file
Named landowners21
LandownerVillageDistrict
Shashikant Rajaram KaprePune (M Corp.)Pune
BHALCHANDRA RAJARAM KAPREPune (M Corp.)Pune
VIJAYA DNYANESHWAR JADHAVPune (M Corp.)Pune
MANDAR GOVIND GAIKWADPune (M Corp.)Pune
AMIT GOVIND GAIKWADPune (CB)Pune
BHIMA SHARADCHANDRA VYAVHAREAlandi RuralPune
SUNANDA KALURAM ALHATPune (M Corp.)Pune
MEERA VASANT JADHAVMumbai CityMumbai City
KALURAM DNYANOBA KURHADEAlandi (M Cl)Pune
HIRABAI DNYANOBA KURHADEAlandi (M Cl)Pune
VAISHALI DNYANOBA KURHADE ALIAS VARPEMarkalPune
MAHAVRAO ALIAS MAHADEVRAO BABURAO KURHADEAlandi (M Cl)Pune
SAHADU BABURAO KURHADEAlandi (M Cl)Pune
CHANDRAKANT BABURAO KURHADEAlandi (M Cl)Pune
SIDHESH VILAS KURHADEAlandi (M Cl)Pune
AKSHADA PRAFFULA MUNGASEKelgaonPune
KAILAS MADHAVRAO KURHADEAlandi (M Cl)Pune
BALASAHEB MADHAVRAO KURHADEAlandi (M Cl)Pune
KAMAL KUNDALIK HARPALEFursungiPune
REKHA UMAKANT BHELKEPune (M Corp.)Pune
SUBHASH SAHADU KURHADEAlandi (M Cl)Pune

Approvals and building plan

Sanctioning authorityANADI NAGAR
Permissible FSI17205.53
Proposed, not sanctioned17,206 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAlandi Devachi

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTECHNO ARCH
EngineerSANGRAM RAMESH GAVHANE
Chartered AccountantS V SURVASE & CO CA
Chartered AccountantUlhas Mandhane andco
PartnerRole in project
INDRAYANI VENTURES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2033

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: INDRAYANI VENTURES DG ARCH CERTIFICATE MARCH 2026_compressed.pdf20 Apr 2026
Form 2File: ENGG CIRTIFICATE FORM 2 INDRAYNI VENTURE MARCH 2026.pdf20 Apr 2026
Form 3File: Form 3 Indrayani.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory DNYANGANGA ABC AND D WING MARCH 2026.pdf20 Apr 2026
Form 1File: ARCH LETTER DEC 2025 DG_compressed.pdf22 Jan 2026
Form 2File: ENGG CIRTIFICATE FORM 2 INDRAYNI VENTURE DEC 25.pdf22 Jan 2026
Form 3File: Form N0 3 DEC 2025 DG.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory DNYANGANGA ABC AND D WING DEC 2025.pdf22 Jan 2026
Form 2File: form 2.pdf18 Oct 2025
Form 3File: Form-3 Signed.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: old unsold.pdf18 Oct 2025
Form 1File: form 1_compressed.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Indrayani Ventures Form 5 2024-25.pdf30 Sep 2025
Form 1File: f1.pdf2 Aug 2025
Form 2File: f2.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf2 Aug 2025
Form 3File: f3_compressed.pdf2 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect Lettr April 2025.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CIRTIFICATE FORM 2 INDRAYNI VENTURE APRIL 2025.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Indrayani Dec 2024_compressed.pdf1 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DG JAN 25_compressed.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Word DNYANGANGA (1).pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Certificate_compressed.pdf25 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Indrayani Ventures Form 5 FY 2023-24.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUL-20204.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OCT-2024.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUL2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: OCT-2024.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: APRIL 2023.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: APRIL 2024.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: jan 2024.pdf5 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: april 2024.pdf5 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2- APR 2024.pdf5 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-March 2024_compressed.pdf5 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2-JAN2024.pdf15 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2A-APR2021.pdf15 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM2A-APR2022.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: INDRAYANI -JUL23-A.pdf1 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH_FORM1_JUL23.pdf1 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH_FORM1_OCT23.pdf1 Jan 2024
Copy of the legal title reportFile: Indrayani Ventures Title Report (1).pdf25 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf8 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf23 Apr 2023
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf30 Mar 2023
Deviation Report with respect to model copy of AgreementFile: 1 Proforma of Allotment letter Ttoday-merged.pdf28 Mar 2023
Building plan approvalFile: C WING_11zon.pdf11 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: C WING_11zon.pdf11 Mar 2023
Proforma of Agreement for saleFile: NEW AGREEMENT FOR RERA ( MODEL AGREEMENT ) (3).pdf10 Mar 2023
Building plan approvalFile: 1 Building Plan Approval A_11zon (1).pdf8 Mar 2023
Building plan approvalFile: 1 Building Plan Approval B_11zon (1).pdf8 Mar 2023
Building plan approvalFile: 1 Building Plan Approval C_11zon (1).pdf8 Mar 2023
Building plan approvalFile: 1 Building Plan Approval D_11zon (1).pdf8 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval A_11zon (1).pdf8 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval B_11zon (1).pdf8 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval C_11zon (1).pdf8 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval D_11zon (1).pdf8 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf1 Mar 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf28 Feb 2023
Declaration in FORM BFile: Declaration in FORM B.pdf10 Feb 2023
CERSAI detailsFile: CERSAI.pdf10 Feb 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances.pdf26 Dec 2022
Details of encumbrances concerned to LegalFile: Details of encumbrances.pdf26 Dec 2022
Layout approvalFile: layout).pdf25 Dec 2022
PAN CardFile: PAN Card indrani venture pan.pdf25 Dec 2022
Copy of Layout Approval (in case of layout)File: layout).pdf25 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: indrayni कमेंट्समेंट सर्टिफिकेट.pdf25 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow25 Dec 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DNYANGANGA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ALANDI DEVACHI13,700+ in Pune

Builder: INDRAYANI VENTURES

INDRAYANI VENTURES has 1 registration on MahaRERA, including DNYANGANGA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if DNYANGANGA is delayed beyond 31 Mar 2033?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DNYANGANGA?

The registered promoter entity is INDRAYANI VENTURES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DNYANGANGA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DNYANGANGA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DNYANGANGA?

The professionals named in the filing: Architect: TECHNO ARCH; Engineer: SANGRAM RAMESH GAVHANE; Chartered Accountant: S V SURVASE & CO CA; Chartered Accountant: Ulhas Mandhane andco. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DNYANGANGA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DNYANGANGA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DNYANGANGA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.