ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Dinaco Darshan CHS LTD

Registered No litigation declared Residential / Group Housing project

Dinaco Darshan CHS LTD

By Dinaco Darshan CHSL

RG-MH-95369 · RERA P51800032422 · Last updated on MahaRERA portal: 5 Aug 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
7 of 11Construction stages donefurthest along: Slabs of Super Structure, 14%
31 of 54Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

Dinaco Darshan CHS LTD is a Residential / Group Housing project by Dinaco Darshan CHSL in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800032422 on 4 Jan 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 21 months from the original filing. 23 of the 54 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameDinaco Darshan CHS LTD
  • TypeResidential / Group Housing
  • Location
    • Damodar Mhatre Road
    • Dahisar West
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800032422
  • ReraGenie IDRG-MH-95369

Builder

  • NameDinaco Darshan CHSL
  • Entity typeSociety
  • SecretoryAshwini Harkishan Kapadia
  • ChairpersonShailesh Gajanand Vyas

Key dates

1 months past promisethis monthRegisteredJan 2022First promiseDec 2024Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Jan 2022
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed102 files

Current status

43%23 of 54 units booked
98.3%Work done, per cost certificate

Figures as on 5 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dinaco Darshan CHS LtdNA161554054

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 14%.

Dinaco Darshan CHS Ltd: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure14%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered20
Open Space13

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area961 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Dec 2025
LandownerVillageDistrict
Dinaco Darshan CHS LimitedBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MUNICIPAL CORPORATION
Permissible FSI2588.18
Proposed, not sanctioned941 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPranik Gardens and Arcade Mahavir Nagar Kandivali West Mumbai 400067
Estimated costRs 10.81 cr
Cost incurredRs 10.63 cr
Work done98.28%
BuildingWingEstimatedIncurred
Dinaco Darshan CHS LtdNARs 10.81 crRs 10.63 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUmesh Gawde
EngineerAnand Kulkarni
Chartered AccountantIshwarlal & co
PartnerRole in project
Dinaco Darshan CHSL-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800027500Dec 2024 → Jun 2025

Reason as filed by the promoterDue to Finishing and parking system installation in process the project not able to get completed in time. We would like to request you to further grant us extension for Six Month Le 30-06-2025. We request you kindly grant us the certificate at the earliest

EA27072621881Dec 2024 → Sep 2026

Reason as filed by the promoterOC Recived

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Dinaco Rera Letter.pdf5 Aug 2026
Withdrawal Update Form 1File: Dinaco Rera Letter.pdf5 Aug 2026
Withdrawal Update Form 1File: Dinaco Rera Letter.pdf5 Aug 2026
Withdrawal Update Form 1File: Dinaco Rera Letter.pdf5 Aug 2026
Withdrawal Update Form 2File: Dinaco Rera Letter.pdf5 Aug 2026
Withdrawal Update Form 2File: Dinaco Rera Letter.pdf5 Aug 2026
Withdrawal Update Form 2File: Dinaco Rera Letter.pdf5 Aug 2026
Withdrawal Update Form 2File: Dinaco Rera Letter.pdf5 Aug 2026
Withdrawal Update Form 3File: Dinaco_Form3_Q1_25-26.pdf5 Aug 2026
Withdrawal Update Form 3File: Dinaco_Form3_Q1_25-26.pdf5 Aug 2026
Withdrawal Update Form 3File: Dinaco_Form3_Q1_25-26.pdf5 Aug 2026
Withdrawal Update Form 3File: Dinaco_Form3_Q1_25-26.pdf5 Aug 2026
Form 2A (FY 2025-2026)File: Dinaco_Form 2A_2025-26.pdf25 Jul 2026
Form 2A (FY 2024-2025)File: Form_2A_-_Dinaco_2024-25.pdf23 Jul 2026
Withdrawal Update Form 1File: Dinaco_Form1_Q1_25-26.pdf13 Jul 2026
Withdrawal Update Form 2File: Dinaco_Form2_Q2_25-26.pdf13 Jul 2026
Withdrawal Update Form 3File: Dinaco_Form3_Q1_25-26.pdf13 Jul 2026
Disclosure of sold/ booked inventoryFile: Disclosure of inventory (3).pdf27 Feb 2025
Declaration about Commencement CertificateFile: CC Covering Letter.pdf27 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_21-22.pdf27 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_22-23.pdf27 Feb 2025
Declaration in FORM BFile: Form B (1) (1).pdf24 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 oct dec 24.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 dec 24.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 24.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of inventory Final.pdf11 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dinaco Darshan Form 1_Q3.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dinaco Darshan Form 3_Q3 (1).pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dinaco Darshan Form 2_Q3.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf8 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf16 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dinaco.pdf16 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dinaco.pdf16 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dinaco Form 1.pdf31 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dinaco Darshan_Form 2.pdf31 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dinaco Darshan_Form 3.pdf31 May 2024
Proforma of Agreement for saleFile: Dinaco Darshan_AFS_.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dinaco Darhsan Form 1.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dinaco Darhsan Form 2.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dinaco Drashan Form 3.pdf20 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Full CC.pdf19 Oct 2023
Layout approvalFile: Dinaco Darshan Approved Amend Plan_1-2.pdf18 Oct 2023
Layout approvalFile: Dinaco Darshan Approved Amend Plan_3-end.pdf18 Oct 2023
Copy of Layout Approval (in case of layout)File: Dinaco Darshan Approved Amend Plan_1-2.pdf18 Oct 2023
Copy of Layout Approval (in case of layout)File: Dinaco Darshan Approved Amend Plan_3-end.pdf18 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Further Stack Parking 1st to 13th Floor Annexure E.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dinaco Form 1_dt 13-10-2023.pdf14 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dinaco Darshan-Form - 2-Quarter 2.pdf14 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dinaco Darshan-Form - 3- Quarter 2.pdf14 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 April 22 to June 22 Dinaco CHSL.pdf2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 July 22 to Sep 22 Dinaco CHSL.pdf2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Oct 22 to Dec 22 Dinaco CHSL.pdf2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan 23 to March 23 Dinaco CHSL.pdf2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 FY 23-24 -Dinaco CHSL (1).pdf2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan 23 to March 23 Dinaco CHSL.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 FY 23-24 -Dinaco CHSL (1).pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 FY 23-24 -Dinaco CHSL (1).pdf1 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A April 23 -June 23.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan 23 to March 23 Dinaco CHSL.pdf30 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dinaco Form 1_dt 07-04-2023.pdf29 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dinaco Form 1_dt 16-01-2023.pdf29 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dinaco Form 1_dt 08-10-2022.pdf29 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dinaco Form 1_dt 05-07-2022.pdf29 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dinaco Form 1_dt 08-10-2022.pdf29 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dinaco Form 1_dt 16-01-2023.pdf29 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dinaco Form 1_dt 07-04-2023.pdf29 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 April 22 to June 22 Dinaco CHSL.pdf29 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 July 22 to Sep 22 Dinaco CHSL.pdf29 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Oct 22 to Dec 22 Dinaco CHSL.pdf29 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan 23 to March 23 Sati Darshan.pdf29 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 21-22 Dinaco CHSL.pdf29 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CERTIFICATE Q1.pdf29 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1.pdf29 Jul 2022

How this compares with Mumbai Suburban

43%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 21 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dinaco Darshan CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dahisar West6,700+ in Mumbai Suburban

2 kmDinaco Darshan CHS LTDCompleted 63Lapsed / revoked 46Other 108Dot size: filed unitsN

Filed coordinates, straight-line distance. 217 registered projects within 2 km.

Builder: Dinaco Darshan CHSL

Dinaco Darshan CHSL has 1 registration on MahaRERA, including Dinaco Darshan CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Dinaco Darshan CHS LTD is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dinaco Darshan CHS LTD?

The registered promoter entity is Dinaco Darshan CHSL, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dinaco Darshan CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dinaco Darshan CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dinaco Darshan CHS LTD?

The professionals named in the filing: Architect: Umesh Gawde; Engineer: Anand Kulkarni; Chartered Accountant: Ishwarlal & co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dinaco Darshan CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dinaco Darshan CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dinaco Darshan CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.