Home / Browse projects / Pune, Maharashtra / DEVESHWAR TEKADI- PHASE I- BUILDING: A,B,C,D,E

Registered No litigation declared Others project

DEVESHWAR TEKADI- PHASE I- BUILDING: A,B,C,D,E

By MAHADRISHTI SPACES LLP

RG-MH-15433 · RERA P52100024059 · Last updated on MahaRERA portal: 29 Oct 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 55Construction stages doneacross 5 buildings; furthest along: Basement (if any), 15%
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

DEVESHWAR TEKADI- PHASE I- BUILDING: A,B,C,D,E is a Others project by MAHADRISHTI SPACES LLP in Pune, Maharashtra, registered with MahaRERA as P52100024059 on 17 Jan 2020. Possession is promised by 30 Dec 2026.

At a glance

Project

  • NameDEVESHWAR TEKADI- PHASE I- BUILDING: A,B,C,D,E
  • TypeOthers
  • Location
    • SATARA ROAD
    • BHILAREWADI
    • Katraj
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • RERA no.P52100024059
  • ReraGenie IDRG-MH-15433

Builder

  • NameMAHADRISHTI SPACES LLP
  • Entity typePartnership
  • PartnersYATEEN VINAYAK LANJEKAR, SHRIKANT VISHNU SHETE

Key dates

this monthRegisteredJan 2020PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Jan 2020
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings5 building records
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA70000
BNA70000
CNA70000
DNA70000
ENA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 29 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Basement (if any), at 15%.

A9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C11%
ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D12%
ActivityProgress
Excavation100%
Basement (if any)15%
Podiums (if any)0%
Plinth15%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed105

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots105
Closed/Covered30
Open Space75
BuildingClosed/CoveredOpen SpaceTotal
A01515
B01515
C101525
D101525
E101525

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area16,770 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
MEGHA PRAKASH PATILKatrajPune
DEVIDAS BHIMRAO MUNDFANEPethPune
RAJENDRA DEVIDAS MUNDFANEPethPune
VIJAY DEVIDAS MUNDFANEPethPune
ATUL BHALCHANDRA ADKEPethPune
KIRAN BABASAHEB WARULEWadgaon BkPune

Approvals and building plan

Permissible FSI27102.34
Proposed, not sanctioned11,981 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSBI IFB PIMPRI NEAR KALASAGAR HOTEL PIMPRI PUNE 411034

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAKSHA KAPALEY
EngineerAsif E Khan
Chartered AccountantABHISHEK SHAH
PartnerRole in project
MAHADRISHTI SPACES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DT DEC 22_compressed.pdf29 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DT SEP 23_compressed (1).pdf29 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Mahadrishti LLP001_compressed.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: deveshwar tekadi form3_compressed.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf14 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (Mahadrishti LLP )001.pdf9 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mahadrishti LLP 10-7-2022001.pdf9 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mahadrishti LLP 02-7-2022001_compressed.pdf9 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Deveshwar Tekadi june_compressed.pdf9 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Deveshwar Tekadi sept 22_compressed.pdf9 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Deveshwar Tekadi001.pdf2 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Deveshwar Tekadi001.pdf2 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate Deveshwar Tekadi001.pdf2 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Mahadrishti LLP 2021-2022001.pdf2 Sep 2022
OtherFile: APPROVAL.pdf1 Mar 2022
OtherFile: Supplemental LLP Agreement.PDF26 Feb 2022
Declaration about Commencement CertificateFile: Declaration for commencement.pdf25 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200227943180_For_Asset_Based_Search_12_01_2022_14_47_33_605.pdf25 Jan 2022
OtherFile: Supplemental Deed.pdf24 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 CA Certificate-compressed.pdf17 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: New NA Order 28-12-2020_compressed.pdf13 Jan 2022
Declaration about Commencement CertificateFile: New NA Order 28-12-2020_compressed.pdf13 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A Engineers Certificate001_compressed.pdf13 Jan 2022
Disclosure of sold/ booked inventoryFile: Inventory sheet.pdf13 Jan 2022
Disclosure of sold/ booked inventoryFile: inventory declaration.pdf13 Jan 2022
Disclosure of sold/ booked inventoryFile: inventory sheet 2_compressed.pdf13 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200227007044_For_Debtor_Based_Search_31_12_2021_11_03_40_622.pdf12 Jan 2022
CERSAI detailsFile: Cersai Report No loan.pdf12 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: EARLIER CA AUDIT 2020.pdf12 Jan 2022
OtherFile: MCA Mahadrishti spaces llp.pdf10 Jan 2022
OtherFile: application for authorised signatory.pdf6 Jan 2022
OtherFile: application for change in promoter.pdf6 Jan 2022
OtherFile: Supplemental LLP Agreement.pdf6 Jan 2022
OtherFile: Supplemental Deed.pdf6 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certi mahadrishti.pdf29 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certi mahadrishti-compressed.pdf29 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: quality assurance mahadrishti-compressed.pdf29 Dec 2021
Disclosure of sold/ booked inventoryFile: MAHADRISHTI sold unsold.pdf29 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 DEC 2021.pdf29 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate 2 A.pdf18 Jun 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 1NEW.pdf18 Jun 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5.pdf18 Jun 2020
OtherFile: Form 3 Mahadrishti.pdf12 Jun 2020
OtherFile: Form 4 Mahadrishti.pdf12 Jun 2020
OtherFile: Supplemental Deed 05-05-2020.pdf12 Jun 2020
Commencement Certificates / NA Order for plotted developmentFile: Declaition Letter.pdf14 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: N A Order.pdf9 Jan 2020
Copy of the legal title reportFile: Search and Title Report- Page 1-3.pdf6 Jan 2020
Copy of the legal title reportFile: Search and Title Report- Page 4-6.pdf6 Jan 2020
Copy of the legal title reportFile: Search and Title Report- Page 7-9.pdf6 Jan 2020
Copy of the legal title reportFile: Search and Title Report- Page 10.pdf6 Jan 2020
Building plan approvalFile: Sanction Plan 1.pdf4 Jan 2020
Layout approvalFile: Sanction Plan 1.pdf4 Jan 2020
PAN CardFile: PAN.pdf4 Jan 2020
Details of encumbrancesFile: Non ENCUBERENCE Letter.pdf4 Jan 2020
Copy of Layout Approval (in case of layout)File: Sanction Plan 1.pdf4 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 1.pdf4 Jan 2020
Declaration in FORM BFile: Form B - Mahesh Nalawade.pdf4 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf4 Jan 2020
Proforma of Allotment letterFile: Proforma of Agreement for Sale.pdf4 Jan 2020
Proforma of Allotment letterFile: Allottment Letter.pdf4 Jan 2020
OtherFile: Certificate of LLP Incorporation.PDF4 Jan 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DEVESHWAR TEKADI- PHASE I- BUILDING: A,B,C,D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHILAREWADI13,700+ in Pune

Builder: MAHADRISHTI SPACES LLP

MAHADRISHTI SPACES LLP has 1 registration on MahaRERA, including DEVESHWAR TEKADI- PHASE I- BUILDING: A,B,C,D,E. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if DEVESHWAR TEKADI- PHASE I- BUILDING: A,B,C,D,E is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DEVESHWAR TEKADI- PHASE I- BUILDING: A,B,C,D,E?

The registered promoter entity is MAHADRISHTI SPACES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DEVESHWAR TEKADI- PHASE I- BUILDING: A,B,C,D,E?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DEVESHWAR TEKADI- PHASE I- BUILDING: A,B,C,D,E?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DEVESHWAR TEKADI- PHASE I- BUILDING: A,B,C,D,E?

The professionals named in the filing: Architect: RAKSHA KAPALEY; Engineer: Asif E Khan; Chartered Accountant: ABHISHEK SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DEVESHWAR TEKADI- PHASE I- BUILDING: A,B,C,D,E?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DEVESHWAR TEKADI- PHASE I- BUILDING: A,B,C,D,E. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DEVESHWAR TEKADI- PHASE I- BUILDING: A,B,C,D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.