Home / Browse projects / Chandrapur, Maharashtra / DEUL CONSTRUCTION MANDIRAYAN PHASE 1

Completed No litigation declared Residential / Group Housing project

DEUL CONSTRUCTION MANDIRAYAN PHASE 1

By PRASHANT SUDHAKARRAO KASHETTIWAR

RG-MH-78897 · RERA P50900018942 · Last updated on MahaRERA portal: 13 Nov 2021

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Chandrapur registration emailed to you, free during the pilot beta.
Jun 2021Possession promisedregistration recorded completed
12 of 44Construction stages doneacross 4 buildings; furthest along: Sanitary Fittings within the flats /..., 10%
0Complaints at MahaRERAon this registration
Jump to the 36 documents Report an error

DEUL CONSTRUCTION MANDIRAYAN PHASE 1 is a Residential / Group Housing project by PRASHANT SUDHAKARRAO KASHETTIWAR in Chandrapur, Maharashtra, registered with MahaRERA as P50900018942 on 17 Dec 2018. The registration is recorded completed; possession was promised by 30 Jun 2021.

At a glance

Project

  • NameDEUL CONSTRUCTION MANDIRAYAN PHASE 1
  • TypeResidential / Group Housing
  • Location
    • BHADRAVATI
    • Bhadravati (M Cl)
    • Chandrapur
    • 442902
  • Pincode442902
  • RERA no.P50900018942
  • ReraGenie IDRG-MH-78897

Builder

  • NamePRASHANT SUDHAKARRAO KASHETTIWAR
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredDec 2018PromisedJun 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Dec 2018
  • Promised completion30 Jun 2021
  • Revised completionNone
  • Buildings4 building records
  • Documents filed36 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SWASTIKAYANNA30000
SHANKHANADNA60000
SHUBHANGANNA60000
NADBRAMHANA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 13 Nov 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 10%.

SWASTIKAYAN30%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHANKHANAD30%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHUBHANGAN30%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
NADBRAMHA30%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Nov 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes25%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes20%
Street LightingYes20%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes10%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceYes10%
Open ParkingYes10%

Parking filed11

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots11
Closed/Covered1
Open Space10
BuildingClosed/CoveredOpen SpaceTotal
SWASTIKAYAN101
SHANKHANAD033
SHUBHANGAN033
NADBRAMHA044

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2698.0
Proposed, not sanctioned2,698 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFOREST CAMP MIDC CHANDRAPUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANISH SUDHAKAR KAMBLE
EngineerANAND KUKDE
EngineerA W KHAN
PartnerRole in project
PRASHANT SUDHAKARRAO KASHETTIWAR-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50900010811Jun 2021 → Jun 2022

Reason as filed by the promoterDeul construction ( manirayan phase -1 ) project not complete in 30/06/2021 the primary reason for delay in my project is that because the labour in my company were covid-19 positive and due to the pendamic we can not ask over labours to join back to work in this situation. according to rules of our city bhadrawati chandrapur the raw material was not available due to the shut down of the shops perahps the work was not able to proceed further. Another reason is that me and my family were covid-19 positive due to which i was anable to work. every were because of the pendamic all over market was

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Dec 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Dec 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed36

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM NO-2A 1ST QUARTER.pdf13 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM NO-2A 2ND QUARTER.pdf13 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM NO-2A 3RD QUARTER.pdf13 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM NO-2A 4TH QUARTER.pdf13 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM NO 5 18-19.pdf13 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM NO 5 19-20.pdf13 Nov 2021
Declaration about Commencement CertificateFile: M-1 DECLARATION LETER.pdf2 Nov 2021
Disclosure of sold/ booked inventoryFile: M-1 DEISCLOSURE LETTER.pdf2 Nov 2021
Architect’s Certificate on Completion of Project (Form 4)File: Mandirayan p-1-compressed.pdf17 Aug 2019
PAN CardFile: Prashant kasshatiwar PAN.pdf5 Jun 2019
Form 2AFile: mandirayan p 1.pdf5 Jun 2019
Certificates of CA (Form 3)File: CA CERTIFICATE M1.pdf11 Dec 2018
OtherFile: ARCHITECT CERTIFICATE M1 OTHER.pdf11 Dec 2018
Building plan approvalFile: PLAN APPROVAL PLOT 14-15.pdf10 Dec 2018
Building plan approvalFile: PLAN APPROVAL PLOT 16-17.pdf10 Dec 2018
Copy of the legal title reportFile: LEGAL TITLE REPORT 14 TO 17.pdf10 Dec 2018
Copy of the legal title reportFile: LEGAL TITLE REPORT 18 TO 21.pdf10 Dec 2018
Copy of the legal title reportFile: LEGAL TITLE REPORT 22 TO 25.pdf10 Dec 2018
Building Plan Approval (IOD)File: PLAN APPROVAL PLOT 14-15.pdf10 Dec 2018
Building Plan Approval (IOD)File: PLAN APPROVAL PLOT 16-17.pdf10 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf10 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 2.pdf10 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER CERTIFICATE 14 TO 17.pdf10 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER CERTIFICATE 18 TO 25.pdf10 Dec 2018
Layout approvalFile: LAYOUT APPROVAL.pdf8 Dec 2018
Details of encumbrancesFile: DETAILS OF ENCUMBRANCES.pdf8 Dec 2018
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL.pdf8 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATES.pdf8 Dec 2018
Building plan approvalFile: BLDG PLAN APPROVAL PLOT 18 TO 22.pdf25 Sep 2018
Building plan approvalFile: BLDG PLAN APPROVAL PLOT 23 TO 25.pdf25 Sep 2018
Building Plan Approval (IOD)File: BLDG PLAN APPROVAL PLOT 18 TO 22.pdf25 Sep 2018
Building Plan Approval (IOD)File: BLDG PLAN APPROVAL PLOT 23 TO 25.pdf25 Sep 2018
OtherFile: OTHER.pdf25 Sep 2018
Declaration in FORM BFile: DECLARATION IN FORM B.pdf27 Aug 2018
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf27 Aug 2018
Proforma of Allotment letterFile: PROFORMA OF AGREEMENT TO SALE.pdf27 Aug 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
DEUL PHASE 2IN FRONT OF NTPC POWER GREED GHANSHYAM NAGAR SUMTHANA BHADRAWATI DIST. CHANDRAPUR3CompletedDec 2016Late, Apr 2017
DEUL PHASE 1INFRONT OF NTPC POWER GREED GHANSHYAM NAGAR SUMTHANA BHADRAVATI DIST. CHANDRAPUR1CompletedMar 2015Late, Jun 2015

How this compares with Chandrapur

10%of Chandrapur projects moved their completion datethis one has not
39%of Chandrapur registrations have lapsed or been cancelledthis one is completed

Computed across the 220+ Chandrapur projects on ReraGenie, from their own filings.

Keep DEUL CONSTRUCTION MANDIRAYAN PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHADRAVATI220+ in Chandrapur

Builder: PRASHANT SUDHAKARRAO KASHETTIWAR

PRASHANT SUDHAKARRAO KASHETTIWAR has 3 registrations on MahaRERA, including DEVALAYA PHASE 1 and DEVALAYA PHASE 2. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Chandrapur district page.

Frequently asked questions

What are my rights if DEUL CONSTRUCTION MANDIRAYAN PHASE 1 is delayed beyond 30 Jun 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DEUL CONSTRUCTION MANDIRAYAN PHASE 1?

The registered promoter entity is PRASHANT SUDHAKARRAO KASHETTIWAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DEUL CONSTRUCTION MANDIRAYAN PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DEUL CONSTRUCTION MANDIRAYAN PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DEUL CONSTRUCTION MANDIRAYAN PHASE 1?

The professionals named in the filing: Architect: MANISH SUDHAKAR KAMBLE; Engineer: ANAND KUKDE; Engineer: A W KHAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DEUL CONSTRUCTION MANDIRAYAN PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DEUL CONSTRUCTION MANDIRAYAN PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DEUL CONSTRUCTION MANDIRAYAN PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.