ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Destination Ostia Building E1

Registered No litigation declared Residential / Group Housing project

Destination Ostia Building E1

By D R GAVHANE LANDMARKS LLP

RG-MH-71547 · RERA P52100053043 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 12 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Plinth, 90%
27 of 120Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

Destination Ostia Building E1 is a Residential / Group Housing project by D R GAVHANE LANDMARKS LLP in Pune, Maharashtra, registered with MahaRERA as P52100053043 on 10 Oct 2023. Possession is promised by 30 Apr 2027. 93 of the 120 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameDestination Ostia Building E1
  • TypeResidential / Group Housing
  • Location
    • 216/1B/1
    • Dudulgaon
    • Dudulgaon
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053043
  • ReraGenie IDRG-MH-71547

Builder

  • NameD R GAVHANE LANDMARKS LLP
  • Entity typeOthers
  • Named personsMr. Ajit Damodar Gavhane, Mr. Amit Damodar Gavhane, Mrs. Jija Chudaman Patil
  • Other registrations12 more →
  • Completed6 of 13
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects17 →

Key dates

this monthRegisteredOct 2023PromisedApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Oct 2023
  • Promised completion30 Apr 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed123 files

Current status

78%93 of 120 units booked
41.6%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Destination Ostia Building E1NA12121200120

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 90%.

Destination Ostia Building E1: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth90%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes75%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed274

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots274
Closed/Covered75
Open Space199

Land and ownership24

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area941 sq m
Land owned byThe promoter, with other names on the file
Named landowners24
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Dec 2025
LandownerVillageDistrict
Mr. Hiraman Nivrutti SastePimpri Chinchawad (M Corp.)Pune
Mrs. Sangeeta Hiraman SastePimpri Chinchawad (M Corp.)Pune
Mr. Om Hiraman SastePimpri Chinchawad (M Corp.)Pune
Miss.Samruddhi Hiraman SastePimpri Chinchawad (M Corp.)Pune
Mr. Chandrakant Nivrutti SastePimpri Chinchawad (M Corp.)Pune
Mrs. Sunita Chandrakant SastePimpri Chinchawad (M Corp.)Pune
Mr. Kamlesh Chandrakant SastePimpri Chinchawad (M Corp.)Pune
Mrs. Aarti Kamlesh SastePimple NilakhPune
Miss.Swara Kamlesh SastePimpri Chinchawad (M Corp.)Pune
Mr. Dayanand Chandrakant SastePimpri Chinchawad (M Corp.)Pune
Mr. Manik Nivrutti SastePimpri Chinchawad (M Corp.)Pune
Mrs. Surekha Manik SastePimpri Chinchawad (M Corp.)Pune
Mr. Anurag Manik SastePimpri Chinchawad (M Corp.)Pune
Mr. Dnyaneshwar Ganpat SastePimpri Chinchawad (M Corp.)Pune
Mrs. Vimal Dnyaneshwar SastePimpri Chinchawad (M Corp.)Pune
Mr Bhanudas Dnyaneshwar SastePimpri Chinchawad (M Corp.)Pune
Miss. Deepika Bhanudas SastePimpri Chinchawad (M Corp.)Pune
Mr. Sangram Bhanudas SastePimpri Chinchawad (M Corp.)Pune
Mrs. Vidya Umesh MorePimpri Chinchawad (M Corp.)Pune
Mrs.Sindhu Tanaji KarlePimpri Chinchawad (M Corp.)Pune
Mrs. Sunanda Arun ShindePimpri Chinchawad (M Corp.)Pune
Mrs. Aruna Ramesh MorePimpri Chinchawad (M Corp.)Pune
Mrs. Bhagyashree Gulab MarathePimpri Chinchawad (M Corp.)Pune
Mrs Sarika Santosh WadekarPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI10214.95
Proposed, not sanctioned10,215 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE - NASHIK ROAD, BHOSARI, PUNE - 411039
Estimated costRs 23.36 cr
Cost incurredRs 9.71 cr
Work done41.57%
BuildingWingEstimatedIncurred
Destination Ostia Building E1NARs 22.26 crRs 9.35 cr
-NARs 1.10 crRs 36.41 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVOUSSOIRS Sameer Valimbe
EngineerRohinee Engineers
EngineerGirish Kale
EngineerGirish Dilip Kale
Chartered AccountantParag S Savale & Associates
Chartered AccountantCMRS & ASSOCIATES LLP
PartnerRole in project
D R GAVHANE LANDMARKS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Ostia E1 Bldg.pdf24 Apr 2026
Withdrawal Update Form 2File: Form-2 Ostia E1 Bldg.pdf24 Apr 2026
Withdrawal Update Form 3File: Ostai E1.pdf24 Apr 2026
Form 2A (FY 2025-2026)File: Form-2A Ostia-E1(25-26).pdf1 Apr 2026
Withdrawal Update Form 1File: Form-1 Ostia E1 bldg.pdf23 Jan 2026
Withdrawal Update Form 2File: Form-2 Ostia E1.pdf23 Jan 2026
Withdrawal Update Form 3File: Destination Ostia E1 Bldg..pdf23 Jan 2026
Withdrawal Update Form 1File: Form-1 Ostia E1 Bldg.pdf1 Jan 2026
Withdrawal Update Form 2File: Ostia E1' Form 2.pdf1 Jan 2026
Withdrawal Update Form 3File: Ostia E1 Bld Form 3 Sept 2025.pdf1 Jan 2026
Form 5 (FY 2024-2025)File: Ostia E1 Bldg Form 5.pdf29 Nov 2025
Form 1File: Form-1 Ostia E1 Bldg (2).pdf25 Oct 2025
Form 2File: Ostia E1 sep 25 (1).pdf25 Oct 2025
Form 3File: Ostia E1 Bld Form 3 Sept 2025.pdf25 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Ostia E1 Bldg (1).pdf25 Oct 2025
Form 2A (FY 2023-2024)File: 2223e1.pdf27 Jul 2025
Form 2A (FY 2024-2025)File: 2324E1.pdf27 Jul 2025
Form 5 (FY 2023-2024)File: 23245.pdf27 Jul 2025
Form 1File: F1 DEC 23.pdf20 Jul 2025
Form 2File: F2 DECEM 23.pdf20 Jul 2025
Form 3File: f3 dec 23.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD DECE 23.pdf20 Jul 2025
Form 1File: F1 MARCH 24.pdf20 Jul 2025
Form 2File: F2 MARCH 24.pdf20 Jul 2025
Form 3File: form 3 march 24.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD MARCH 24.pdf20 Jul 2025
Form 1File: F1 JUNE 24.pdf20 Jul 2025
Form 2File: F2 JUNE 24.pdf20 Jul 2025
Form 3File: FORM 3 JUNE 2024.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD JUNE 24.pdf20 Jul 2025
Form 1File: F1 SEP 24.pdf20 Jul 2025
Form 2File: ostia e1 sept 24 (1).pdf20 Jul 2025
Form 3File: FORM 3SEPT 24.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold sept 24.PDF20 Jul 2025
Form 1File: Form-1 Ostia E1 Building.pdf20 Jul 2025
Form 2File: ostia e1 dec 24 (1).pdf20 Jul 2025
Form 3File: FORM 3 DEC 24.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Ostia E1 Wing.pdf20 Jul 2025
Form 1File: F1 MARCH 25.pdf20 Jul 2025
Form 2File: F2 MARCH 25.pdf20 Jul 2025
Form 3File: Destination Ostia E1 Bldg.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD MAR 25.pdf20 Jul 2025
Form 1File: Form 1 Ostia E1 Building (1).pdf20 Jul 2025
Form 2File: ostia E1 (1) (1).pdf20 Jul 2025
Form 3File: DRGL Ostia E1.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Ostia E1 Bldg.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 E1 Bldg Ostia (1).pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ostia E1 Building Engineer's Certificate.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold E1 Bldg Ostia (1).pdf15 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Destination Ostia Bldg E1.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 OSTIA E1 BUILDING.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate (2).pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Ostia E1 Sold Unsold.pdf22 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: F2a.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Ostia E1 Bldg.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ostia E1' Form 2.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD E1 OSTIA.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Destination Ostia E1 Form 3.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Ostia E1 Building.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Ostia E1'.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: E1 Ostia Sold unsold.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Destination Ostia E1 Building (1).pdf16 Apr 2024
Building plan approvalFile: 1_11zon.pdf7 Mar 2024
Building plan approvalFile: 2_11zon.pdf7 Mar 2024
Building plan approvalFile: 3_11zon.pdf7 Mar 2024
Building plan approvalFile: 4_11zon.pdf7 Mar 2024
Building plan approvalFile: 5_11zon.pdf7 Mar 2024
Building plan approvalFile: 6_11zon.pdf7 Mar 2024
Building plan approvalFile: 7_11zon (1).pdf7 Mar 2024
Building plan approvalFile: 8_11zon (1).pdf7 Mar 2024
Building plan approvalFile: 9_11zon (1).pdf7 Mar 2024
Building plan approvalFile: 10_11zon.pdf7 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 1_11zon.pdf7 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 2_11zon.pdf7 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 3_11zon.pdf7 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 4_11zon.pdf7 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 5_11zon.pdf7 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 6_11zon.pdf7 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 7_11zon (1).pdf7 Mar 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Destination Ostia Building F1Gat no 216 1B 1 Dudulgaon72OngoingDec 2026Dec 2026
DESTINATION OSTIA BLDG AGat no 216 1B 1 Dudulgaon109CompletedOct 2019Late, Sep 2020
DESTINATION OSTIAGat no 216 1B 2 Dudulgaon94CompletedOct 2017Oct 2017

How this compares with Pune

78%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Destination Ostia Building E1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dudulgaon13,700+ in Pune

2 kmDestination Ostia BuildiCompleted 65Lapsed / revoked 35Other 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 227 registered projects within 2 km.

Builder: D R GAVHANE LANDMARKS LLP

D R GAVHANE LANDMARKS LLP has 13 registrations on MahaRERA, including DESTINATION OSTIA and DESTINATION OSIYAN WING AB. Its filings disclose 17 earlier MahaRERA projects: declares 7 of 17 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Destination Ostia Building E1 is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Destination Ostia Building E1?

The registered promoter entity is D R GAVHANE LANDMARKS LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Destination Ostia Building E1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Destination Ostia Building E1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Destination Ostia Building E1?

The professionals named in the filing: Architect: VOUSSOIRS Sameer Valimbe; Engineer: Rohinee Engineers; Engineer: Girish Kale; Engineer: Girish Dilip Kale; Chartered Accountant: Parag S Savale & Associates; Chartered Accountant: CMRS & ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Destination Ostia Building E1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Destination Ostia Building E1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Destination Ostia Building E1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.