Home / Browse projects / Pune, Maharashtra / DESTINATION ANKUR C BUILDING

Completed No litigation declared Residential / Group Housing project

DESTINATION ANKUR C BUILDING

By KIRTI LANDMARKS

RG-MH-21205 · RERA P52100008620 · Last updated on MahaRERA portal: 27 Sep 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Nov 2020Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 44%
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

DESTINATION ANKUR C BUILDING is a Residential / Group Housing project by KIRTI LANDMARKS in Pune, Maharashtra, registered with MahaRERA as P52100008620 on 19 Aug 2017. The registration is recorded completed; possession was promised by 30 Nov 2020.

At a glance

Project

  • NameDESTINATION ANKUR C BUILDING
  • TypeResidential / Group Housing
  • Location
    • PUNE ALANDI ROAD
    • CHOVISAWADI
    • CHARHOLI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100008620
  • ReraGenie IDRG-MH-21205

Builder

  • NameKIRTI LANDMARKS
  • Entity typePartnership
  • PartnersARJUN PANDURANG YELBHAR, SHALAN SOMAJI GAVHANE, SAGAR ARJUN TAPKIR, NITA DILIP PHUGE, SANTOSH DADARAO SONAWANE, DATTATRYA CHANDRAKANT JAID, HARIBHAU MARUTI GAVHANE, SAMBHAJI MARUTI GAVHANE, SURESH KURMDAS GAVAHANE, AJIT DAMODAR GAVHANE, VIKRANT VILAS LANDE, SANTOSH MAHADEV DAPHAL and 3 more
  • Other registrations3 more →
  • Completed4 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017PromisedNov 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Aug 2017
  • Promised completion30 Nov 2020
  • Revised completionNone
  • Buildings1 building record
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING CNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Sep 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 44%.

BUILDING C: 31% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure44%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Sep 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes50%
Street LightingYes0%
Community BuildingsYes75%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Closed/Covered20
Open Space9

Land and ownership18

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,916 sq m
Land owned byThe promoter, with other names on the file
Named landowners18
LandownerVillageDistrict
SURYAKANT PATILBUAA TAPKIRCHARHOLIPune
ASHOK DATTU TAPKIRCHARHOLIPune
SHANKAR NATHU TAPKIRCHARHOLIPune
APPA NATHU TAPKIRCHARHOLIPune
KALYAN NIVRUTTI TAPKIRCHARHOLIPune
BABAN NIVRUTTI TAPKIRCHARHOLIPune
SUDAM RAGHUNATH TAPKIR-Pune
KRUSHNAKANT RAGHUNATH TAPKIRCHARHOLIPune
BABAN KISAN TAPKIRCHARHOLIPune
BHANUDAS KISAN TAPKIRCHARHOLIPune
PRABHAKAR ABU TAPKIRCHARHOLIPune
ROHIDAS SHIVAJI TAPKIRCHARHOLIPune
VAISHALI ROHIDAS TAPKIRCHARHOLIPune
UJJWALA PRAMOD TAPKIRCHARHOLIPune
MADHUKAR DNYANESHWAR TAPKIRCHARHOLIPune
RAJENDRA DNYANESHWAR TAPKIRCHARHOLIPune
NANDA DNAYNESHWAR TAPKIRCHARHOLIPune
ANITA RAMCHANDRA KADAMPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI2574.0
Proposed, not sanctioned2,574 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHOSARI PUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANUPAMA VASANT TAPKIR
Chartered AccountantCMRS AND ASSOCIATES LLP
PartnerRole in project
KIRTI LANDMARKS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Apr 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Sep 2021

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Socity Registration Certificate C Wing.pdf27 Sep 2021
Declaration about Commencement CertificateFile: Format D c bld - Page 1.pdf6 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A c bld_compressed.pdf6 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A c bld_compressed.pdf6 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A c bld_compressed.pdf6 Sep 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold c bld_compressed.pdf6 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Kirti C 18-19.pdf4 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: KIRTI FORM 5 C bldg 19-20.pdf4 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: C and D Compeition.pdf4 Sep 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 wing C.pdf4 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Kirti Landmarks C Bldg.pdf13 Aug 2021
Certificates of CA (Form 3)File: C building form march 2020.pdf9 Nov 2020
Certificates of CA (Form 3)File: C building form June 2020.pdf9 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: C Bld Form 1 Arch 3rd.pdf11 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: C Bld Form 2 Engineer Certificate.pdf11 Feb 2020
Certificates of CA (Form 3)File: RERA DEC 2019.pdf11 Feb 2020
Certificates of CA (Form 3)File: KIRTI C JUNE 2019.pdf3 Jan 2020
Certificates of CA (Form 3)File: KIRTI C SEPT 2019.pdf3 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 C building signed copy.pdf29 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 C Building Engineering.pdf27 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - C Bldg - June.pdf27 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - C Bldg - sept.pdf27 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf27 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - C bldg june.pdf27 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - C bldg sept.pdf27 Nov 2019
Certificates of CA (Form 3)File: Kirti C - Building.pdf27 Nov 2019
Certificates of CA (Form 3)File: C Building CA Certificate-min.pdf18 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ankur Fom 1.pdf15 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ankur Form 2.pdf15 Feb 2019
Certificates of CA (Form 5)File: FORM 5 C Building.pdf28 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf17 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_C Building_Form 2.pdf17 Aug 2018
Building plan approvalFile: c building 1 st floor.pdf2 Apr 2018
Building plan approvalFile: c building floor plan-.pdf2 Apr 2018
Building plan approvalFile: c wing elevationplan.pdf2 Apr 2018
Layout approvalFile: c building layout-ilovepdf-compressed.pdf2 Apr 2018
Copy of Layout Approval (in case of layout)File: c building layout-ilovepdf-compressed.pdf2 Apr 2018
Building Plan Approval (IOD)File: c building 1 st floor.pdf2 Apr 2018
Building Plan Approval (IOD)File: c building floor plan-.pdf2 Apr 2018
Building Plan Approval (IOD)File: c wing elevationplan.pdf2 Apr 2018
Layout approvalFile: LAYOUT 1-13.PDF31 Jul 2017
Building plan approvalFile: BLDG PLAN C 7-13.PDF31 Jul 2017
Building plan approvalFile: BLDG PLAN C 8-13.PDF31 Jul 2017
Building plan approvalFile: BLDG PLAN C 9-13.PDF31 Jul 2017
Building plan approvalFile: BLDG PLAN C 10-13.PDF31 Jul 2017
PAN CardFile: Kirti Landmarks Pan Card.pdf31 Jul 2017
Copy of the legal title reportFile: SEARCH REPORT ANKUR NEW.pdf31 Jul 2017
Details of encumbrancesFile: kirti 002 (1).pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT 1-13.PDF31 Jul 2017
Building Plan Approval (IOD)File: BLDG PLAN C 7-13.PDF31 Jul 2017
Building Plan Approval (IOD)File: BLDG PLAN C 8-13.PDF31 Jul 2017
Building Plan Approval (IOD)File: BLDG PLAN C 9-13.PDF31 Jul 2017
Building Plan Approval (IOD)File: BLDG PLAN C 10-13.PDF31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Letter_Latest.pdf31 Jul 2017
Declaration in FORM BFile: FORM B - PROMOTER.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form C Wing.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Ankur C Bldg.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 Bldg C.pdf31 Jul 2017
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf31 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DESTINATION ANKUR C BUILDING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHOVISAWADI13,700+ in Pune

2 kmDESTINATION ANKUR C BUILCompleted 14Lapsed / revoked 8Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: KIRTI LANDMARKS

KIRTI LANDMARKS has 4 registrations on MahaRERA, including DESTINATION ANKUR C BUILDING and Destination Ankur D Building. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if DESTINATION ANKUR C BUILDING is delayed beyond 30 Nov 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DESTINATION ANKUR C BUILDING?

The registered promoter entity is KIRTI LANDMARKS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DESTINATION ANKUR C BUILDING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DESTINATION ANKUR C BUILDING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DESTINATION ANKUR C BUILDING?

The professionals named in the filing: Architect: ANUPAMA VASANT TAPKIR; Chartered Accountant: CMRS AND ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DESTINATION ANKUR C BUILDING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DESTINATION ANKUR C BUILDING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DESTINATION ANKUR C BUILDING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.