Destination 24 Avenue D Building

By D R GAVHANE LANDMARKS LLP

RG-MH-33293 · RERA P52100080646 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 12 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Plinth, 90%
107 of 107Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Destination 24 Avenue D Building is a Commercial project by D R GAVHANE LANDMARKS LLP in Pune, Maharashtra, registered with MahaRERA as P52100080646 on 23 Jun 2025. Possession is promised by 30 Sep 2027. 0 of the 107 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameDestination 24 Avenue D Building
  • TypeCommercial
  • Location
    • Charholi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100080646
  • ReraGenie IDRG-MH-33293

Builder

  • NameD R GAVHANE LANDMARKS LLP
  • Entity typeOthers
  • GSTIN27AAKFD0139R1Z0
  • PartnersMr Ajit Damodar Gavhane damodar gavhane, Mrs Jija Chudaman Patil chudaman patil
  • Authorized SignatoryMr Amit Damodar Gavhane Damodar Gavhane
  • Other registrations12 more →
  • Completed6 of 13
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects17 →

Key dates

this monthRegisteredJun 2025PromisedSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jun 2025
  • Promised completion30 Sep 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

0%0 of 107 units booked
18.7%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D BuildingNA550107107

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 90%.

D Building: 17% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth90%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes85%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed479

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots479
Closed/Covered89
Open Space390

Land and ownership125

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,772 sq m
Land owned byThe promoter, with other names on the file
Named landowners125
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Aug 2025
LandownerVillageDistrict
Chintamani Raghuraj PandePashanPune
Haribhau Maruti GavhanePashanPune
Rohit Bhanudas KaljePashanPune
Shashikala Bhanudas KaljePashanPune
Bhikuji Dashrath KaljePashanPune
Kantabai Narayan KaljePashanPune
Baydabai Maruti SandbhorPashanPune
Alkabai Tukaram KatePashanPune
Madhukar Raghunath KaljePashanPune
Sambhaji Maruti GavhanePashanPune
Rajaram Sudam KaljePashanPune
Nitin Sudam KajlePashanPune
Kalabai Sudam KaljePashanPune
Mr Dinkar Sudam KaljePashanPune
Janabai Namdev KaljePashanPune
Suresh Namdev KaljePashanPune
Siddhi Suresh KaljePashanPune
Om Suresh KaljePashanPune
Rekha Suresh KaljePashanPune
Sandip Namdev KaljePashanPune
Sunil Namdev KaljePashanPune
Dinkar Sudam KaljePashanPune
Mrs. Durga Dinkar KaljePashanPune
Mr. Manoj Dinkar KaljePashanPune
Mr. Rajaram Sudam KaljePashanPune
Mr. Prathamesh Rajaram KaljePashanPune
Mrs.Dipali Rajaram KaljePashanPune
Mr. Nitin Sudam kaljePashanPune
Akshada Rajaram KaljePashanPune
Pranav Nitin KaljePashanPune
Nilima Nitin KaljePashanPune
Shrimati Kalabai Sudam KaljePashanPune
Manisha Harischandra WalkePashanPune
Namdev Bhagwant KaljePashanPune
Sarika Sunil KaljePashanPune
Sarthak Sunil KaljePashanPune
America Kailas LandePashanPune
Sangita Ashok GawarePashanPune
Vasant Bhagwant KaljePashanPune
Balasaheb Vasant KaljePashanPune
Kalyani Balasaheb KaljePashanPune
Damini Balasaheb KaljePashanPune
Komal Balasaheb KaljePashanPune
Atharav Balasaheb KaljePashanPune
Kalicharan Vasant KaljePashanPune
Sushma Kailcharan KaljePashanPune
Chaitrali Kalicharan KaljePashanPune
Rutuja Kalicharan KaljePashanPune
Shreya Kalicharan KaljePashanPune
Kaiwalya Kalicharan KaljePashanPune
Rohini Jalindar GalandePashanPune
Usha Avinash ChaundhePashanPune
Ankush Bhagwant KaljePashanPune
Damyanti Ankush KaljePashanPune
Rahul Ankush KaljePashanPune
Satyabhama Rahul KaljePashanPune
Swaraj Rahul KaljePashanPune
Hindavi Rahul KaljePashanPune
Vikas Ankush KaljePashanPune
Ujwala Vikas KaljePashanPune
Shambhuraje Vikas KaljePashanPune
Ashwni Sambhaji LonariPashanPune
Shivaji Bhagwant KaljePashanPune
sambhaji shivaji kaljePashanPune
Sarika Sambhaji kaljePashanPune
Jahanvi Sambhaji KaljePashanPune
Swara Sambhaji KaljePashanPune
Sunnya Shivaji KaljePashanPune
Supriya Sunnya kaljePashanPune
Manjushri Shrikant KadPashanPune
Babutai Mohan KaljePashanPune
Gulab Mohan KaljePashanPune
Vrushali Gulab KaljePashanPune
Malhar Gulab KaljePashanPune
Yuvraj Mohan KaljePashanPune
Snehal Yuvraj KaljePashanPune
Bharti Vishal WalkePashanPune
Subhadrabai Dnyanoba thoravePashanPune
Balasaheb Sopan KadPashanPune
Sachin Balasaheb KadPashanPune
Shrikant Balasaheb KadPashanPune
Shridhar Balasaheb KadPashanPune
Bhanudas Dashrath KadPashanPune
Yogesh Bhikuji KaljePashanPune
Yash Yogesh KaljePashanPune
Dnyanesh bhikuji KaljePashanPune
Archana Balasaheb InglePashanPune
Janabai Bhikuji KaljePashanPune
Kavita Yogesh KaljePashanPune
Mr Namdev Bhagwant KaljePashanPune
Mr Vasant Bhagwant KaljePashanPune
Mr Ankush Bhagwant KaljePashanPune
Mrs Shantabai Prabhakar KaljePashanPune
Mr Balasaheb Prabhakar KaljePashanPune
Mrs Sarika Balasaheb KaljePashanPune
Miss Vaishanavi Balasaheb KaljePashanPune
Miss Siddhi Balasaheb KaljePashanPune
Miss Dattatray Prabhakar KaljePashanPune
Mrs Rajashri Dattatray KaljePashanPune
Mrs Sunanda Vijay BahiratPashanPune
Mrs Kaveri Sunil KalapurePashanPune
Mr Ananda Maruti KaljePashanPune
Mrs Godhabai Ananda KaljePashanPune
Mr Ramdas Ananda KaljePashanPune
Mr Reshma Ramdas KaljePashanPune
Mr Dyanesh Ramdas KaljePashanPune
Miss Monali Ramdas KaljePashanPune
Mr Sunil Ananda KaljePashanPune
Mr Nanda Sunil KaljePashanPune
Mr Satvik Sunil KaljePashanPune
Mrs Usha Subhash KalbhorPashanPune
Mr Kundalik Vishawnath KaljePashanPune
Mrs Radhabai Kundalik KaljePashanPune
Mr Sachin Kundalik KaljePashanPune
Miss Rupali Sharad UmapPashanPune
Mrs Dipali Hanumant KutePashanPune
Mr Murlidhar Vishawnath KaljePashanPune
Mrs Minabai Murlidhar KaljePashanPune
Mr Nilesh Murlidhar KaljePashanPune
Mr Shivaji Bhagwant KaljePashanPune
Mrs Babubai Mohan KaljePashanPune
Mr Gulab Mohan KaljePashanPune
Mr Yuvraj Mohan KaljePashanPune
Mrs America Kailas LandePashanPune
Mr Prabhakar Maruti KaljePashanPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal corporation
Permissible FSI5401.49
Proposed, not sanctioned5,401 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop Nos 1,2,3,5,6 And 7, Business Centre, J Block, Midc, Telco Bhosari Road, Bhosari, Pimpri Chinchwad, Pune Dist., Maharashtra.411026
Estimated costRs 13.22 cr
Cost incurredRs 2.48 cr
Work done18.74%
BuildingWingEstimatedIncurred
D BuildingNARs 12.36 crRs 2.35 cr
-NARs 85.84 lakhRs 12.88 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSiddarth Harischandrakar
EngineerRohinee Badgujar
EngineerNiranjan Kumar Ram
Chartered AccountantCA Parag Savale
PartnerRole in project
D R GAVHANE LANDMARKS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 May 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 24 Avenue D Bldg.pdf24 Apr 2026
Withdrawal Update Form 2File: Form-2 24 Avenue D Bldg.pdf24 Apr 2026
Withdrawal Update Form 3File: 24 Avenue D Bld.pdf24 Apr 2026
Withdrawal Update Form 1File: Form-1 24 Avenue D bldg.pdf29 Jan 2026
Withdrawal Update Form 2File: Form-2 24 Avenue D Bldg.pdf29 Jan 2026
Withdrawal Update Form 3File: Revised Destination 24 Avenue D Bldg_compressed.pdf29 Jan 2026
Layout approvalFile: Main layout -No Revision.pdf27 Oct 2025
Building plan approvalFile: D Building LG 2 No Revision.pdf27 Oct 2025
Building plan approvalFile: D Building UG No Revision.pdf27 Oct 2025
Building plan approvalFile: D Building 13 No Revision.pdf27 Oct 2025
Building plan approvalFile: D Building 13 No Revision.pdf27 Oct 2025
Building plan approvalFile: D Building 15 No Revision.pdf27 Oct 2025
Building plan approvalFile: D Building 16 No Revision.pdf27 Oct 2025
Withdrawal Update Form 1File: Form-1 24 Avenue D Bldg (1).pdf27 Oct 2025
Withdrawal Update Form 2File: Enginneru0027s Certificate 24 Avenue D Bldg.pdf27 Oct 2025
Withdrawal Update Form 3File: Destination 24 Avenue D Building (1)_11zon.pdf27 Oct 2025
Withdrawal Update Form 1File: Form-1 24 Avenue D Bldg (1).pdf25 Oct 2025
Withdrawal Update Form 1File: Form-1 24 Avenue D Bldg (1).pdf25 Oct 2025
Withdrawal Update Form 2File: Enginneru0027s Certificate 24 Avenue D Bldg.pdf25 Oct 2025
Withdrawal Update Form 2File: Enginneru0027s Certificate 24 Avenue D Bldg.pdf25 Oct 2025
Withdrawal Update Form 3File: Destination 24 Avenue D Building form 3 sep 25 (1)_compressed (1).pdf25 Oct 2025
Withdrawal Update Form 3File: Destination 24 Avenue D Building form 3 sep 25 (1)_compressed (1).pdf25 Oct 2025
Form 1File: Form-1 24 Avenue D Building.pdf26 Jul 2025
Form 2File: Form 2.pdf26 Jul 2025
Form 3File: Form 3 24 Avenue D Wing.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 24 Avenue D Building.pdf26 Jul 2025
Building plan approvalFile: 17-15 D bldg_11zon.pdf6 Jun 2025
Building Plan Approval / NA Order for plotted developmentFile: 17-15 D bldg_11zon.pdf6 Jun 2025
Copy of the legal title reportFile: ilovepdf_merged (8) (1).pdf4 May 2025
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (9) (1) (1).pdf4 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (11) (1).pdf4 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Destination 24 Avenue D Bldg- (1)_11zon.pdf4 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Encumbrunce.pdf4 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Destination (1).pdf4 May 2025
Declaration in FORM BFile: 1 Declaration in FORM B (5) (1).pdf22 Apr 2025
Other - LegalFile: 492-493-494-2 बिगरशेती (1).pdf22 Apr 2025
Other - LegalFile: चऱ्होली बु_492_493_494_मोकळी जागा (2025) (1).pdf22 Apr 2025
Declaration about Commencement CertificateFile: Decalaration commencement.pdf22 Apr 2025
CERSAI detailsFile: CERSAI Report Decleration.pdf22 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Bank Declaratn (1).pdf22 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation report Allotment letter.pdf22 Apr 2025
Other - TechnicalFile: Annuxure A Order 50.pdf22 Apr 2025
Deviation Report with respect to model copy of AgreementFile: Deviation report Agreement.pdf22 Apr 2025
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (4) (1).pdf22 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Mr Ajit Damodar Gavhane.pdf22 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Mr Amit Damodar Gavhane.pdf22 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Mrs Jija Chudaman Patil.pdf22 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B) (22 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured-unsecured finance.pdf22 Apr 2025
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (16) (2) (1).pdf21 Apr 2025
Layout approvalFile: 2 Copy of Layout Approval (in case of layout) (2).pdf21 Apr 2025
Building plan approvalFile: 5 Building Plan Approval _ NA Order for plotted development (1) (1).pdf21 Apr 2025
Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development (1).pdf21 Apr 2025
Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development (1).pdf21 Apr 2025
Building plan approvalFile: LG plan_11zon.pdf21 Apr 2025
PAN CardFile: 1 PAN Card (1) (1).pdf21 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrunce docx.pdf21 Apr 2025
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (16) (2) (1).pdf21 Apr 2025
Copy of Layout Approval (in case of layout)File: 2 Copy of Layout Approval (in case of layout) (2).pdf21 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf21 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: LG plan_11zon.pdf21 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 4 Building Plan Approval _ NA Order for plotted development (1).pdf21 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan Approval _ NA Order for plotted development (1) (1).pdf21 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development (1).pdf21 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrunce docx.pdf21 Apr 2025

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Destination Osiyan Wing ABCTS No 492 1 492 2 492 3 493 1 494 1 Charholi124CompletedMar 2022Mar 2022
DESTINATION OSTIA BLDG AGat no 216 1B 194CompletedSep 2020Sep 2020
DESTINATION OSTIA J AND K BUILDINGGat no 216 1B 294CompletedDec 2017Dec 2017

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Destination 24 Avenue D Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Charholi13,700+ in Pune

2 kmDestination 24 Avenue D Completed 65Lapsed / revoked 32Other 98Dot size: filed unitsN

Filed coordinates, straight-line distance. 195 registered projects within 2 km.

Builder: D R GAVHANE LANDMARKS LLP

D R GAVHANE LANDMARKS LLP has 13 registrations on MahaRERA, including DESTINATION OSTIA and DESTINATION OSIYAN WING AB. Its filings disclose 17 earlier MahaRERA projects: declares 7 of 17 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Destination 24 Avenue D Building is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Destination 24 Avenue D Building?

The registered promoter entity is D R GAVHANE LANDMARKS LLP, an others as per the filing. Its GSTIN 27AAKFD0139R1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Destination 24 Avenue D Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Destination 24 Avenue D Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Destination 24 Avenue D Building?

The professionals named in the filing: Architect: Siddarth Harischandrakar; Engineer: Rohinee Badgujar; Engineer: Niranjan Kumar Ram; Chartered Accountant: CA Parag Savale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Destination 24 Avenue D Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Destination 24 Avenue D Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Destination 24 Avenue D Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.