Home / Browse projects / Pune, Maharashtra / DESTINATION 24 AVENUE C BUILDING
DESTINATION 24 AVENUE C BUILDING
By M/S D R GAVHANE LANDMARKS LLP
RG-MH-22572 · RERA P52100032909 · Last updated on MahaRERA portal: 8 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 11 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DESTINATION 24 AVENUE C BUILDING is a Others project by M/S D R GAVHANE LANDMARKS LLP in Pune, Maharashtra, registered with MahaRERA as P52100032909 on 2 Feb 2022. Possession is promised by 30 Nov 2026. The completion date has moved by 11 months from the original filing. 138 of the 169 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameDESTINATION 24 AVENUE C BUILDING
- TypeOthers
- Location
- CHARHOLI
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100032909
- ReraGenie IDRG-MH-22572
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Feb 2022
- Promised completion30 Nov 2026
- Revised completionRevised to 30 Nov 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed191 files
Current status
Figures as on 8 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C BUILDING | NA | 14 | 14 | 133 | 36 | 169 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
C BUILDING: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 8 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed7
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership5
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MR CHINTAMANI RAGHURAJ PANDE | Pimpri Chinchawad (M Corp.) | Pune |
| MR RAJARAM SUDAM KALJE | CHARHOLI | Pune |
| MR SACHIN KUNDLIK KALJE | CHARHOLI | Pune |
| MR NILESH MURLIDHAR KALJE | - | Pune |
| MR ANKUSH BHAGVANT KALJE | Bhosari | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C BUILDING | NA | Rs 13.82 cr | Rs 13.82 cr |
| - | NA | Rs 1.39 cr | Rs 1.39 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | A DESIGN STUDIO |
| Engineer | NIKHIL SHAH ASSOCIATES |
| Engineer | VINOD SHIVAJI |
| Engineer | Niranjan Kumar Ram |
| Engineer | Rohinee Badgujar |
| Chartered Accountant | HARY KURUP AND ASSOCIATES hary kurap |
| Chartered Accountant | CMRS & ASSOCIATES LLP |
| Chartered Accountant | Parag Savale |
| Partner | Role in project |
|---|---|
| M/S D R GAVHANE LANDMARKS LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIt is respectfully submitted that the construction work of the project has been completed, and the Completion Certificate was received from the concerned authority. However, due to certain corrections required in the Completion application, the application was rejected. The promoter is now carrying out the necessary corrections and will reapply for the Completion Application. As the project registration on the MahaRERA portal has lapsed during this process, the promoter requests a 4-month extension to complete the required corrections and Completion. It is therefore requested that the Hon'ble
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Nov 2026
Documents filed191
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 191 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 March 26 (1).pdf | 8 Sep 2026 |
| Withdrawal Update Form 1File: Form 1 (33).pdf | 8 Sep 2026 |
| Withdrawal Update Form 2File: Form 2 March 26 (2).pdf | 8 Sep 2026 |
| Withdrawal Update Form 2File: Destination C Building Form 2 (2) (1).pdf | 8 Sep 2026 |
| Withdrawal Update Form 3File: Form 3 March 2026 (1).pdf | 8 Sep 2026 |
| Withdrawal Update Form 3File: Form 3 (38).pdf | 8 Sep 2026 |
| Form 2A (FY 2025-2026)File: Destination 24 Avenue c building (2) (1).pdf | 26 Aug 2026 |
| Form 2A (FY 2023-2024)File: destination 24 Avenue c building 23-24 (1).pdf | 7 Aug 2026 |
| Withdrawal Update Form 1File: Form-1 24 Avenue C bldg.pdf | 30 Jan 2026 |
| Withdrawal Update Form 2File: Form-2 24 Avenue C Bldg.pdf | 30 Jan 2026 |
| Withdrawal Update Form 3File: Destination 24 Avenue C Bldg_11zon.pdf | 30 Jan 2026 |
| Form 2A (FY 2024-2025)File: 24 Avenue C bldg 2024.pdf | 18 Dec 2025 |
| Form 5 (FY 2024-2025)File: 24 Avenue C Bldg Form 5.pdf | 29 Nov 2025 |
| Form 1File: Form-1 24 Avenue C Bldg (2).pdf | 25 Oct 2025 |
| Form 2File: Destination 24 Avenue C building sep 25 (1).pdf | 25 Oct 2025 |
| Form 3File: 24 A C Bld Form 3 Sept 2025_compressed.pdf | 25 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 24 Avenue C Bldg.pdf | 25 Oct 2025 |
| Form 2A (FY 2021-2022)File: F2A Destination 24 Avenue C budg.pdf | 21 Aug 2025 |
| Form 2A (FY 2022-2023)File: 2223333.pdf | 27 Jul 2025 |
| Form 5 (FY 2021-2022)File: 2122 51.pdf | 27 Jul 2025 |
| Form 5 (FY 2022-2023)File: 2223 53.pdf | 27 Jul 2025 |
| Form 5 (FY 2023-2024)File: 2324 52.pdf | 27 Jul 2025 |
| Form 1File: FORM 1 MAR 22.pdf | 22 Jul 2025 |
| Form 2File: FORM 2 MARCH 22.pdf | 22 Jul 2025 |
| Form 3File: FORM 3 MAR 22.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD MAR 22.pdf | 22 Jul 2025 |
| Form 1File: FORM 1 J22.pdf | 22 Jul 2025 |
| Form 2File: F2 J22.pdf | 22 Jul 2025 |
| Form 3File: F3 J22.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: S J22.pdf | 22 Jul 2025 |
| Form 1File: F1 S22.pdf | 22 Jul 2025 |
| Form 2File: Destination 24 Avenue sep 22.pdf | 22 Jul 2025 |
| Form 3File: F3 S22.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: S S22.pdf | 22 Jul 2025 |
| Form 1File: F1 D22.pdf | 22 Jul 2025 |
| Form 2File: F2 D22.pdf | 22 Jul 2025 |
| Form 3File: F3 D22.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: S D22.pdf | 22 Jul 2025 |
| Form 1File: 1.pdf | 22 Jul 2025 |
| Form 2File: F2 M23.pdf | 22 Jul 2025 |
| Form 3File: F3 M23.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: S M23.pdf | 22 Jul 2025 |
| Form 1File: 1.pdf | 22 Jul 2025 |
| Form 2File: F2 J 23.pdf | 22 Jul 2025 |
| Form 3File: F3 J 23.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: s.pdf | 22 Jul 2025 |
| Form 1File: 1.pdf | 22 Jul 2025 |
| Form 2File: F2 S23.pdf | 22 Jul 2025 |
| Form 3File: 3.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: s.pdf | 22 Jul 2025 |
| Form 1File: 1.pdf | 22 Jul 2025 |
| Form 2File: F2 D 23.pdf | 22 Jul 2025 |
| Form 3File: 3.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: s2.pdf | 22 Jul 2025 |
| Form 1File: 1.pdf | 22 Jul 2025 |
| Form 2File: 2.pdf | 22 Jul 2025 |
| Form 3File: 3.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: s.pdf | 22 Jul 2025 |
| Form 1File: 1.pdf | 22 Jul 2025 |
| Form 2File: F2 JUNE 24.pdf | 22 Jul 2025 |
| Form 3File: 3.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: s.pdf | 22 Jul 2025 |
| Form 1File: 1.pdf | 22 Jul 2025 |
| Form 2File: 2 nd.pdf | 22 Jul 2025 |
| Form 3File: 3.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: sold.pdf | 22 Jul 2025 |
| Form 1File: 1.pdf | 22 Jul 2025 |
| Form 2File: 2.pdf | 22 Jul 2025 |
| Form 3File: 3.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: sold (5).pdf | 22 Jul 2025 |
| Form 1File: 1.pdf | 22 Jul 2025 |
| Form 2File: 2.pdf | 22 Jul 2025 |
| Form 3File: 3.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: sold.pdf | 22 Jul 2025 |
| Form 1File: Form 1 24 Avenue C Bldg (1).pdf | 22 Jul 2025 |
| Form 2File: f2 j 25.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 24 Avenue C Bldg (1).pdf | 22 Jul 2025 |
| Form 3File: DRGL 24 Avenue C Wing_compressed.pdf | 22 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Destination 24 Avenue C Bldg_compressed.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 C Bldg 24 Avenue.pdf | 15 Apr 2025 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| DESTINATION OSTIA BLDG A | GAT NOO 216 1B 1 DUDULGAON PUNE 412105 | 109 | Completed | Oct 2019 | Late, Sep 2020 |
| DESTINATION OSTIA J AND K BUILDING | GAT NO 216 1B 2 DUDULGAON PIMPRI CHINCHWAD PUNE | 94 | Completed | Oct 2017 | Late, Dec 2017 |
| DESTINATION OSTIA PH II BLD HI | S NO 216 1B 2 LATE NIVRUTTI GANPAT SASTE PATIL ESTATE DUDULGAON PUNE 412105 | 140 | Completed | Jun 2017 | Late, Jul 2017 |
| DESTINATION OSTIA BLDG B C | S NO 216 1B 1 MOSHI ALANDI ROAD DUDULGAON | 189 | Completed | Jun 2016 | Late, Jul 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 191 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DESTINATION 24 AVENUE C BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHARHOLI13,700+ in Pune
Filed coordinates, straight-line distance. 70 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: M/S D R GAVHANE LANDMARKS LLP
M/S D R GAVHANE LANDMARKS LLP has 3 registrations on MahaRERA, including DESTINATION 24 AVENUE C BUILDING and Destination Ostia Building F1. Its filings disclose 5 earlier MahaRERA projects: declares 0 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if DESTINATION 24 AVENUE C BUILDING is delayed beyond 30 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DESTINATION 24 AVENUE C BUILDING?
The registered promoter entity is M/S D R GAVHANE LANDMARKS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DESTINATION 24 AVENUE C BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DESTINATION 24 AVENUE C BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DESTINATION 24 AVENUE C BUILDING?
The professionals named in the filing: Architect: A DESIGN STUDIO; Engineer: NIKHIL SHAH ASSOCIATES; Engineer: VINOD SHIVAJI; Engineer: Niranjan Kumar Ram; Engineer: Rohinee Badgujar; Chartered Accountant: HARY KURUP AND ASSOCIATES hary kurap. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DESTINATION 24 AVENUE C BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback