ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Destination 24 Avenue A Building

Registered No litigation declared Residential / Group Housing project

Destination 24 Avenue A Building

By D R GAVHANE LANDMARKS LLP

RG-MH-57013 · RERA P52100056255 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 12 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: External plumbing and external plaster, 90%
68 of 70Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

Destination 24 Avenue A Building is a Residential / Group Housing project by D R GAVHANE LANDMARKS LLP in Pune, Maharashtra, registered with MahaRERA as P52100056255 on 22 May 2024. Possession is promised by 31 Mar 2027. 2 of the 70 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameDestination 24 Avenue A Building
  • TypeResidential / Group Housing
  • Location
    • at Survey No. 492/493/494/2
    • 492/493/494
    • Plot No. B
    • Charholi
    • Pune- 412105.
    • Charholi
    • Pune- 412105.
    • CHARHOLI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100056255
  • ReraGenie IDRG-MH-57013

Builder

  • NameD R GAVHANE LANDMARKS LLP
  • Entity typeOthers
  • GSTIN27AAKFD0139R1Z0
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Named personsMr Ajit Damodar Gavhane, Mr Amit Damodar Gavhane, Mrs Jija Chudaman Patil
  • Other registrations12 more →
  • Completed6 of 13
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects17 →

Key dates

this monthRegisteredMay 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Current status

3%2 of 70 units booked
57.2%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA121270070

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.

A Building: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes45%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes85%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered18
Open Space6

Land and ownership125

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area540 sq m
Land owned byThe promoter, with other names on the file
Named landowners125
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Dec 2025
LandownerVillageDistrict
Mr. Dinkar Sudam KaljeBhosariPune
Mrs. Durga Dinkar Kalje,BhosariPune
Mr. Manoj Dinkar kaljeBhosariPune
Mr. Rajaram Sudam KaljeBhosariPune
Mr. Prathamesh Rajaram KaljeBhosariPune
Mrs. Dipali Rajaram KaljeBhosariPune
Mr Nitin Sudam kaljeBhosariPune
Mrs. Akshada Rajaram KaljeBhosariPune
Mr. Pranav Nitin KaljeBhosariPune
Mrs. Nilima Nitin KaljeBhosariPune
Shrimati. Kalabai Sudam KaljeBhosariPune
Sou. Manisha Harishchandra WalkeBhosariPune
Shri. Namdev Bhagwant KaljeBhosariPune
Sou. Janabai Namdev KaljeBhosariPune
Shri. Suresh Namdev KaljeBhosariPune
Kumar. Om Suresh kaljeBhosariPune
Kumari. Siddhi Suresh kaljeBhosariPune
Sou. Rekha Suresh KaljeBhosariPune
Shri. Sandip Namdev KaljeBhosariPune
Shri. Sunil Namdev KaljeBhosariPune
Sou. Sarika Sunil KaljeBhosariPune
Kumar. Sarthak Sunil kaljeBhosariPune
Shrimati. America kailas Lande,BhosariPune
Sou. Sangita Ashok GawareBhosariPune
Shri. Vasant Bhagwant kaljeBhosariPune
Shri. Balasaheb Vasant KaljeBhosariPune
Sou. Kalyani Balasaheb KaljeBhosariPune
Kumari. Damini Balasaheb KaljeBhosariPune
Kumari. Komal Balasaheb KaljeBhosariPune
Kumar. Atharav Balasaheb KaljeBhosariPune
Shri. Kalicharan Vasant KaljeBhosariPune
Sou. Sushma kalicharan kaljeBhosariPune
Kumari. Chaitrali Kalicharan KaljeBhosariPune
Kumari. Rutuja kalichran KaljeBhosariPune
Kumari. Shreya Kalichran KaljeBhosariPune
Kumar. Kaiwalya kalicharan KaljeBhosariPune
Usha Avinash ChaundheBhosariPune
Shri. Ankush bhagwant kaljeBhosariPune
Sou. Damyanti Ankush KaljeBhosariPune
Shri. Rahul Ankush KaljeBhosariPune
Sou. Satyabhama Rahul kaljeBhosariPune
Kumar Swaraj Rahul KaljeBhosariPune
Kumari Hindavi Rahul KaljeBhosariPune
Shri. Vikas ankush KaljeBhosariPune
Sou. Ujwala Vikas KaljeBhosariPune
Kumar. Shambhuraje Vikas kaljeBhosariPune
Sou. Ashwini Sambhaji LonariBhosariPune
Shri. Shivaji Bhagwant KaljeBhosariPune
Shri. Sambhaji Shivaji KaljeBhosariPune
Sou. Sarika Sambhaji KaljeBhosariPune
Kumari. Jahanvi Sambhaji kaljeBhosariPune
Kumari. Swara Sambhaji kaljeBhosariPune
Shri. Sunny Shivaji KaljeBhosariPune
Sou. Supriya Sunny KaljeBhosariPune
Manjushri Shrikant KadBhosariPune
Shri. Gulab Mohan KaljeBhosariPune
Sou. Vrushali Gulab kaljeBhosariPune
Kumar. Malhar Gulab KaljeBhosariPune
Shri. Yuvraj Mohan kaljeBhosariPune
Sou. Snehal Yuvraj kaljeBhosariPune
Sou. Bharati Vishal WalkeBhosariPune
Subhadrabai Dnyanoba thoraveBhosariPune
Shri. Balasaheb Sopan KadBhosariPune
Shri. Sachin Balasaheb KadBhosariPune
Shrikant Balasaheb KadBhosariPune
Shri. Shridhar Balasaheb KadBhosariPune
Sou. Rohini Jalinder galandeBhosariPune
Shri. Bhanudas Dashrath KaljeBhosariPune
Shri. Rohit Bhanudas KaljeBhosariPune
Sou. Shashikala Bhanudas KaljeBhosariPune
Shri. Bhikuji Dashrath KaljeBhosariPune
Sou. Kantabai Narayan KaljeBhosariPune
Sou. Baydabai Maruti SandbhorBhosariPune
Sou. Alkabai Tukaram KateBhosariPune
Shri. Yogesh Bhikuji KaljeBhosariPune
Master. Yash Yogesh KaljeBhosariPune
Sou. Archana Balasaheb IngleBhosariPune
Sou Janabai Bhikuji KaljeBhosariPune
Sou. Kavita Yogesh KaljeBhosariPune
Shri Chintamani Raghuraj PandeBhosariPune
Shri. Haribhau Maruti GavhaneBhosariPune
Shri. Sambhaji Maruti GavhaneBhosariPune
Mr. Madhukar Raghunath KaljeBhosariPune
Mr. Nitin Sudam KaljeBhosariPune
Mr. Kalabai Sudam KaljeBhosariPune
Mr. Namdev Bhagwant KaljeBhosariPune
Mr. Vasant Bhagwant KaljeBhosariPune
Mr. Ankush Bhagwant KaljeBhosariPune
Mr. Shivaji Bhagwant KaljeBhosariPune
Mrs. Babubai Mohan KaljeBhosariPune
Mr. Gulab Mohan KaljeBhosariPune
Mr. Yuvraj Mohan KaljeBhosariPune
Mrs. America Kailas LandeBhosariPune
Mr. Prabhakar Maruti KaljeBhosariPune
Mrs. Shantabai Prabhakar KaljeBhosariPune
Mr. Balasaheb Prabhakar KaljeBhosariPune
Mrs. Sarika Balasaheb KaljeBhosariPune
Miss. Vaishanavi Balasaheb KaljeBhosariPune
Miss. Siddhi Balasaheb KaljeBhosariPune
Mr. Dattatray Prabhkar KaljeBhosariPune
Mrs. Rajashri Dattatray KaljeBhosariPune
Mrs. Sunanda Vijay BahiratBhosariPune
Mrs. Kaveri Sunil KalapureBhosariPune
Mr. Ananda Maruti KaljeBhosariPune
Mrs. Godhabai Ananda KaljeBhosariPune
Mr. Ramdas Ananda KaljeBhosariPune
Mrs. Reshma Ramdas KaljeBhosariPune
Master. Dnyanesh Ramdas KaljeBhosariPune
Miss. Monali Ramdas KaljeBhosariPune
Mr. Sunil Ananda KaljeBhosariPune
Mrs. Nanda Sunil KaljeBhosariPune
Master. Satvik Sunil KaljeBhosariPune
Mrs. Usha Subhash KalbhorBhosariPune
Rajaram Sudam KaljeBhosariPune
Mr. Kundlik Vishawnath KaljeBhosariPune
Mrs. Radhabai Kundlik KaljeBhosariPune
Mr. Sachin Kundlik KaljeBhosariPune
Mrs. Rupali Sharad UmapBhosariPune
Mrs. Dipali Hanumant KuteBhosariPune
Mr. Murlidhar Vishwanath KaljeBhosariPune
Mrs. Minabai Murlidhar KaljeBhosariPune
Mr. Nilesh Murlidhar KaljeBhosariPune
Shri Dnyanesh Bhikuji KaljeBhosariPune
Babubai Mohan KaljeBhosariPune
Dinkar Sudam KaljeBhosariPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI6018.82
Proposed, not sanctioned6,019 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd, Shop No 1, 2, 3, 5, 6 And 7, Business Centre, J Block, Midc, Telco Bhosari Road, Bho
Estimated costRs 14.22 cr
Cost incurredRs 8.13 cr
Work done57.17%
BuildingWingEstimatedIncurred
A BuildingNARs 12.04 crRs 7.35 cr
-NARs 2.18 crRs 78.40 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectADS A Design Studio
EngineerRohinee Engineers
EngineerNiranjan Kumar Ram
Chartered AccountantCA Parag S savale and Associates
Chartered AccountantCA Maheshwar M Marathe
PartnerRole in project
D R GAVHANE LANDMARKS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 24 Avenue A Bldg (1).pdf16 Jul 2026
Withdrawal Update Form 2File: Form-2 24 Avenue A Bldg.pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3 24 Avenue A Bldg.pdf16 Jul 2026
Withdrawal Update Form 1File: Form-1 24 Avenue A Bldg.pdf24 Apr 2026
Withdrawal Update Form 2File: Form-2 24 Avenue A Bldg.pdf24 Apr 2026
Withdrawal Update Form 3File: 24 Avenue A wing (1).pdf24 Apr 2026
Withdrawal Update Form 1File: Form-1 24 Avenue A bldg.pdf23 Jan 2026
Withdrawal Update Form 2File: Form-2 24 Avenue A Bldg.pdf23 Jan 2026
Withdrawal Update Form 3File: form 3.pdf23 Jan 2026
Withdrawal Update Form 1File: Form-1 24 Avenue A Bldg.pdf20 Dec 2025
Withdrawal Update Form 1File: Form-1 24 Avenue A Bldg.pdf20 Dec 2025
Withdrawal Update Form 2File: Destination 24 Avenue A Building'' Form 2.pdf20 Dec 2025
Withdrawal Update Form 2File: Destination 24 Avenue A Building'' Form 2.pdf20 Dec 2025
Withdrawal Update Form 3File: 24 A A Bld Form 3 Sept 2025.pdf20 Dec 2025
Withdrawal Update Form 3File: 24 A A Bld Form 3 Sept 2025.pdf20 Dec 2025
Form 2A (FY 2024-2025)File: 24 Avenue A bldg 2024.pdf18 Dec 2025
Form 5 (FY 2024-2025)File: 24 Avenue A Bldg Form 5.pdf29 Nov 2025
Form 1File: Form-1 24 Avenue A Bldg (1).pdf25 Oct 2025
Form 2File: Destination 24 Avenue A Building sep 25 (1) (1).pdf25 Oct 2025
Form 3File: 24 A A Bld Form 3 Sept 2025.pdf25 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 24 Avenue A Bldg.pdf25 Oct 2025
Form 1File: Form-1 24 Avenue A Bldg (1).pdf20 Jul 2025
Form 2File: Destination 24 Avenue A Building'' Form 2.pdf20 Jul 2025
Form 3File: Destination 24 Avenue A Bldg Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD A BLDG 24 AVENUE (2).pdf20 Jul 2025
Form 1File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (9).pdf20 Jul 2025
Form 2File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (9).pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory (1).pdf20 Jul 2025
Form 3File: SEPT 24 F3.pdf20 Jul 2025
Form 1File: Form-1 24 Avenue A Building.pdf20 Jul 2025
Form 2File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2) (3).pdf20 Jul 2025
Form 3File: Destination 24 Aveune A Bldg.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold A Wing 24 Avenue.pdf20 Jul 2025
Form 1File: Form-1 A Bldg 24 Avenue (1).pdf20 Jul 2025
Form 2File: F2 MARCH 25 (1).pdf20 Jul 2025
Form 3File: 5 CA Certificate on Project Cost & Fund withdrawal (Form 3) (2).pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold A Bldg 24 Avenue (3).pdf20 Jul 2025
Form 1File: Form 1 24 Avenue A Bldg.pdf20 Jul 2025
Form 2File: Destination 24 Avenue A (1) (1).pdf20 Jul 2025
Form 3File: DRGL 24 Avenue A Wing.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold A Bldg 24 Avenue (3) (1).pdf20 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Destination 24 Avenue A building.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Destination 24 Avenue A Bldg_compressed.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 A Bldg 24 Avenue.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sold Unsold A Bldg 24 Avenue (1).pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold A Bldg 24 Avenue (1).pdf15 Apr 2025
Building plan approvalFile: Destination A wing Dec form 2 (1).pdf6 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 24 Avenue A Building.pdf6 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Destination 24 Aveune A Bldg (1)_compressed.pdf6 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Destination A wing Dec form 2 (1).pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Destination A wing Dec form 2 (1).pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold A Wing 24 Avenue (1).pdf6 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 24 AVENUE A BUILDING sep qu.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 24 Avenue A build form 2_11zon.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 24 Avenue A build form 2.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: 24 Avenue A wing Sold Unsold sep qu.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 24 Avenue A Bldg.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Destination 24 Avenue A Building'' Form 2.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD A BLDG 24 AVENUE.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Destination 24 Avenue A Bldg Form 3.pdf6 Jul 2024
Other - LegalFile: MONIKA DINKAR KALJE ( PA OF PURVANI KARARNAMA ) 1169-2015_11zon.pdf17 May 2024
Copy of the legal title reportFile: Legal Tital.pdf15 May 2024
Other - LegalFile: Court Case 714 2014 Prakash Kalje Tiwari.pdf4 May 2024
Other - LegalFile: 5 Other - Legal (4).pdf4 May 2024
Other - LegalFile: 5 Other - Legal (1).pdf4 May 2024
Other - LegalFile: 5 Other - Legal (2).pdf4 May 2024
Other - LegalFile: 5 Other - Legal (3).pdf4 May 2024
Other - LegalFile: MADHUKAR KALJE ( CORRECTION DEED ) 14470-2016_3_11zon.pdf2 May 2024
Other - LegalFile: PRABHAKAR KALJE ( CORRECTION DEED ) 16066-2016_1_11zon.pdf2 May 2024
Other - LegalFile: BHAGWANT KALJE ( CORRECTION DEED ) 14475_5_11zon_11zon (1).pdf2 May 2024
Other - LegalFile: Annexure A 24 avenue.pdf13 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC validation (1).pdf12 Mar 2024
Layout approvalFile: Adobe Scan Feb 23, 2024 (2).pdf28 Feb 2024
Copy of Layout Approval (in case of layout)File: Adobe Scan Feb 23, 2024 (2).pdf28 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report_200298502583_For_Asset_Based_Search_28_02_2024_14_31_39_274 (1).pdf26 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate.pdf26 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Devation Report Agreement to sale.pdf26 Feb 2024
Layout approvalFile: 13-1_11_11zon_rotated (1) (1).pdf23 Feb 2024
Layout approvalFile: Adobe Scan Feb 23, 2024 (1).pdf23 Feb 2024
Building plan approvalFile: 13-3_13_11zon.pdf23 Feb 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Destination Osiyan Wing ABCTS No 492 1 492 2 492 3 493 1 494 1 Charholi124CompletedMar 2022Mar 2022
DESTINATION OSTIA BLDG AGat no 216 1B 194CompletedSep 2020Sep 2020
DESTINATION OSTIA J AND K BUILDINGGat no 216 1B 294CompletedDec 2017Dec 2017

How this compares with Pune

3%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Destination 24 Avenue A Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Charholi, Pune- 412105.13,700+ in Pune

2 kmDestination 24 Avenue A Completed 57Lapsed / revoked 21Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 117 registered projects within 2 km.

Builder: D R GAVHANE LANDMARKS LLP

D R GAVHANE LANDMARKS LLP has 13 registrations on MahaRERA, including DESTINATION OSTIA and DESTINATION OSIYAN WING AB. Its filings disclose 17 earlier MahaRERA projects: declares 7 of 17 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Destination 24 Avenue A Building is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Destination 24 Avenue A Building?

The registered promoter entity is D R GAVHANE LANDMARKS LLP, an others as per the filing. Its GSTIN 27AAKFD0139R1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Destination 24 Avenue A Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Destination 24 Avenue A Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Destination 24 Avenue A Building?

The professionals named in the filing: Architect: ADS A Design Studio; Engineer: Rohinee Engineers; Engineer: Niranjan Kumar Ram; Chartered Accountant: CA Parag S savale and Associates; Chartered Accountant: CA Maheshwar M Marathe. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Destination 24 Avenue A Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Destination 24 Avenue A Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Destination 24 Avenue A Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.