Red flags

  • Completion date moved by 50 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 50 months from the original
23 of 44Construction stages doneacross 4 buildings; furthest along: Stilt Floor, 70%
23 of 43Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 132 documents Report an error

DESHMUKH ARCADE is a Residential / Group Housing project by JAY DESHMUKH CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100018597 on 21 Nov 2018. Possession is promised by 31 Dec 2028. The completion date has moved by 50 months from the original filing. 20 of the 43 units on this registration are recorded sold or booked, and 23 of 44 construction stages are filed complete.

At a glance

Project

  • NameDESHMUKH ARCADE
  • TypeResidential / Group Housing
  • Location
    • PATAS ROAD
    • DESHMUKH WASTI
    • Baramati Rural
    • Baramati
    • Pune
    • 413102
  • Pincode413102
  • RERA no.P52100018597
  • ReraGenie IDRG-MH-63070

Builder

  • NameJAY DESHMUKH CONSTRUCTION
  • Entity typePartnership
  • PartnersCHITRA DHANANJAY DESHMUKH, SMITA JAYSING KATEDESHMUKH, SHRIKANT MOHAN JADHAV
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2018First promiseOct 2024Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Nov 2018
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 16 Oct 2024)
  • Buildings4 building records
  • Documents filed132 files

Current status

47%20 of 43 units booked

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA80291443
BNA64000
CNA60000
DNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Stilt Floor, at 70%.

A39%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes25%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed99

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots99
Closed/Covered59
Open Space40
BuildingClosed/CoveredOpen SpaceTotal
A33033
B12021
C12021
D24024

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SHRIKANT MOHAN JADHAVBaramati RuralPune
JAY DESHMUKH CONSTRUCTIONBaramati RuralPune

Approvals and building plan

Permissible FSI10028.94
Proposed, not sanctioned10,029 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSN 5 TO 7 ANUSUYA CPLX, BHIGWAN RD, GALINDE NAGAR, BARAMATI 413102

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSMITA VIJAY TAWARE
Chartered AccountantSAMRAT ANIL GARULE
Chartered AccountantAKASH KHINVASARA
PartnerRole in project
JAY DESHMUKH CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025059Oct 2024 → Dec 2028

Reason as filed by the promoterProject Originally sectioned 12/09/2018 with four building name A,B,C,D. Building B with 2 wings are completed and got Part occupancy certificate 22/11/2021 and Building C got Part completion on 13/12/2022. However in between due to Covid 19 Pandemic for almost 2 year construction activity got disturbed and delayed which ultimately effect on expected proposed date of completion which was 16/10/2023. In between due to availability of addition FSI project plan is revised. Remaining Building A and D got revised sanction on 09/08/2022 and proposed date is revised to 16/10/2024. However, due to Del

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Aug 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Apr 2023

Documents filed132

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect Certificate 31 03 2026.pdf21 May 2026
Form 2File: FROM 2 Q4 Engineer certificate.pdf21 May 2026
Form 3File: SCAN FORM-3.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTRY Q4 SIGN.pdf21 May 2026
Form 1File: Form 1 - Architect Certificate 31122025.pdf17 Mar 2026
Form 2File: FROM 2 Q3 Engineer certificate.pdf17 Mar 2026
Form 3File: FORM 3 Q3 SIGN.pdf17 Mar 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTRY Q3 SIGN.pdf17 Mar 2026
Form 5 (FY 2024-2025)File: FORM 5-FY 24-25.pdf12 Mar 2026
Form 1File: Form 1 - Architect Certificate 31032025.pdf22 Jan 2026
Form 2File: FROM 2.pdf22 Jan 2026
Form 3File: FORM 3 01-01-2025 TO 31-03-2025.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTRY DESHMUKH ARCADE.pdf22 Jan 2026
Form 1File: Form 1 - Architect Certificate Q1.pdf22 Jan 2026
Form 2File: FROM 2 Q1.pdf22 Jan 2026
Form 3File: SCAN FORM 3 F.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: SCAN DISCLOSER OF SOLD INVENTRY F.pdf22 Jan 2026
Form 1File: Form 1 - Architect Certificate.pdf22 Jan 2026
Form 2File: FROM 2.pdf22 Jan 2026
Form 3File: SCAN FORM 3 F.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: SCAN DISCLOSURE SOLD INVENTRY F.pdf22 Jan 2026
Form 5 (FY 2023-2024)File: JAY DESHMUKH CON FORM 5 FY 23-24.pdf22 Jan 2026
Form 1File: 10 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf16 Dec 2025
Form 2File: FROM 2.pdf16 Dec 2025
Form 3File: SCAN FORM 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SCAN SOLD INVENTORY.pdf16 Dec 2025
Form 1File: 9 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf16 Dec 2025
Form 2File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf16 Dec 2025
Form 3File: 8 Certificates of CA (Form 3).pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: 4 Disclosure of sold_ booked inventory.pdf16 Dec 2025
Form 1File: 5 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf16 Dec 2025
Form 2File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf16 Dec 2025
Form 3File: 7 Certificates of CA (Form 3).pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory.pdf16 Dec 2025
Form 1File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf16 Dec 2025
Form 2File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf16 Dec 2025
Form 3File: 6 Certificates of CA (Form 3).pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf16 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SCAN FORM 1 31-12-24.pdf7 Jan 2025
Certificates of CA (Form 3)File: SCAN FORM 3.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: SCAN SOLD INVENTORY.pdf7 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FROM 2A 2023-24.pdf31 Dec 2024
Declaration in FORM BFile: Form B Promoter.pdf30 Dec 2024
Declaration in FORM BFile: Form B Land Owner.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SCAN FORM 1 31-3-24.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SCAN FROM 1 30-6-24.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SCAN FROM 1 30-6-24.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SCAN FORM 1 28-12-24.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SCAN FORM 1 31-3-24.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SCAN FROM 1 30-6-24.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SCAN FORM 1 30-9-24.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY 26-4-23.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY 31-3-24.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY 30-6-24.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY 30-9-24.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 311223.pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 310324.pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30062024.pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30092024 FF.pdf28 Dec 2024
Certificates of CA (Form 3)File: FORM 3 Q2 24-25.pdf27 Dec 2024
Certificates of CA (Form 3)File: FORM 3 Q1 24-25.pdf27 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: JAY DESHMUKH CON FORM 5 FY 23-24.pdf18 Oct 2024
Proforma of Agreement for saleFile: 1-7-2024 SATHEKHAT FORMAT.pdf2 Jul 2024
Certificates of CA (Form 3)File: FORM 3 310324.pdf24 Apr 2024
Certificates of CA (Form 3)File: FORM 3 30122023.pdf20 Jan 2024
Certificates of CA (Form 3)File: FORM 3 UPTO 300923_11zon.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5_JayDeshmukh F.pdf9 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A QUALITY ASSURANCE-2 1920.pdf2 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A QUALITY ASSURANCE-3 20-21.pdf2 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A QUALITY ASSURANCE-3 21-22.pdf2 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A QUALITY ASSURANCE-3 2223.pdf2 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_R1 (2).pdf27 Sep 2023
Certificates of CA (Form 3)File: FORM 3 160920223.pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_New.pdf27 Apr 2023
Certificates of CA (Form 3)File: jay desmukh cons form 3.pdf27 Apr 2023
Building plan approvalFile: CAPBC-22-ENTRY-16039_Validation_R1_1.pdf11 Apr 2023
Building plan approvalFile: CAPBC-22-ENTRY-16039_Validation_R1_2.pdf11 Apr 2023
Building Plan Approval (IOD)File: CAPBC-22-ENTRY-16039_Validation_R1_1.pdf11 Apr 2023
Building Plan Approval (IOD)File: CAPBC-22-ENTRY-16039_Validation_R1_2.pdf11 Apr 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Hindavi ClassicCTS 86 Ward no 4 Marvad Peth Baramati Dist Pune 41310217CompletedDec 2016Dec 2016

How this compares with Pune

47%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 50 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DESHMUKH ARCADE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DESHMUKH WASTI13,700+ in Pune

Builder: JAY DESHMUKH CONSTRUCTION

JAY DESHMUKH CONSTRUCTION has 1 registration on MahaRERA, including DESHMUKH ARCADE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if DESHMUKH ARCADE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DESHMUKH ARCADE?

The registered promoter entity is JAY DESHMUKH CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DESHMUKH ARCADE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DESHMUKH ARCADE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DESHMUKH ARCADE?

The professionals named in the filing: Architect: SMITA VIJAY TAWARE; Chartered Accountant: SAMRAT ANIL GARULE; Chartered Accountant: AKASH KHINVASARA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DESHMUKH ARCADE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DESHMUKH ARCADE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DESHMUKH ARCADE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.