Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DCH CASTLE is a Others project by BLUSERA INFRASTRUCTURE in Amravati, Maharashtra, registered with MahaRERA as P50300052032 on 19 Jul 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 14 of the 30 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameDCH CASTLE
- TypeOthers
- Location
- 0
- RAJAPETH
- Amravati (M Corp.)
- Amravati
- 444606
- Pincode444606
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50300052032
- ReraGenie IDRG-MH-42275
Builder
- NameBLUSERA INFRASTRUCTURE
- Entity typePartnership
- PartnersRAJESH SITALDAS SEWANI, MANJU PAWAN RAWLANI, YASH SATISH BASANTWANI, KABIR RAKESH LUND, TUSHAR MANOJ BAKHTAR
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on19 Jul 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed98 files
Current status
Figures as on 27 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DCH CASTLE | NA | 8 | 8 | 18 | 12 | 30 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.
DCH CASTLE: 35% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed60
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| DCH CASTLE | NA | Rs 5.70 cr | Rs 5.49 cr |
| - | NA | Rs 10.00 lakh | Rs 10.00 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ROHIT PUNSHI CAPE DESIGN STUDIO |
| Engineer | PAWAN RAWLANI |
| Chartered Accountant | CA DEEPAK S ZAMBANI G A D AND ASSOCIATES |
| Chartered Accountant | AAYUSH ANILKUMAR NATHANI |
| Partner | Role in project |
|---|---|
| BLUSERA INFRASTRUCTURE | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed98
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Archi-Certif 31-12-25.pdf | 27 Feb 2026 |
| Form 2File: Engg-Certif 31-12-25.pdf | 27 Feb 2026 |
| Form 3File: CA Certificate 31-12-25.pdf | 27 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 31-12-25.pdf | 27 Feb 2026 |
| Withdrawal Update Form 1File: DCH- Archi june 24.pdf | 27 Feb 2026 |
| Withdrawal Update Form 2File: Engg-Certif 31-12-25.pdf | 27 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate 31-12-25.pdf | 27 Feb 2026 |
| Form 5 (FY 2023-2024)File: Form 5_DCH Castle 310324.pdf | 28 Nov 2025 |
| Form 1File: Blusera_Form 1_300925.pdf | 20 Nov 2025 |
| Form 2File: Blusera_Form 2_300925.pdf | 20 Nov 2025 |
| Form 3File: Blusera_Form 3_300925.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Blusera_Sold Unsold_300925.pdf | 20 Nov 2025 |
| Form 1File: DCH_Form 1 300923.pdf | 4 Aug 2025 |
| Form 2File: DCH_Form 2 300923.pdf | 4 Aug 2025 |
| Form 3File: DCH_Form 3 300923.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DCH_Sold Unsold 300923.pdf | 4 Aug 2025 |
| Form 1File: Blusera_Form 1.pdf | 4 Aug 2025 |
| Form 2File: Blusera_Form 2.pdf | 4 Aug 2025 |
| Form 3File: Blusera_Form 3.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Blusera_Sold.pdf | 4 Aug 2025 |
| Form 1File: DCH_Form 1_310324.pdf | 4 Aug 2025 |
| Form 2File: DCH_Form 2_310324.pdf | 4 Aug 2025 |
| Form 3File: DCH_Form 3_310324.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DCH_Sold Unsold_310324.pdf | 4 Aug 2025 |
| Form 1File: DCH- Archi june 24.pdf | 4 Aug 2025 |
| Form 2File: DCH Engr June 24.pdf | 4 Aug 2025 |
| Form 3File: DCH CA Certificate june 24.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DCH Sold Unsold.pdf | 4 Aug 2025 |
| Form 1File: Blusera_Form 1_Q2.pdf | 4 Aug 2025 |
| Form 2File: Blusera_Form 2_Q2.pdf | 4 Aug 2025 |
| Form 3File: Blusera_Form 3_Q2.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Blusera_Sold_Q2.pdf | 4 Aug 2025 |
| Form 1File: Architects Certificate.pdf | 4 Aug 2025 |
| Form 2File: Engineers Certificate.pdf | 4 Aug 2025 |
| Form 3File: DCH_Form 3.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 4 Aug 2025 |
| Form 1File: architech Certificate.pdf | 4 Aug 2025 |
| Form 2File: Engineers Certificate M.pdf | 4 Aug 2025 |
| Form 3File: CA Certificate.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Cert.pdf | 4 Aug 2025 |
| Form 1File: Arch cert.pdf | 4 Aug 2025 |
| Form 2File: Engr certificate.pdf | 4 Aug 2025 |
| Form 3File: Char cert.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: sold~Unsold.pdf | 4 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architech Certificate.pdf | 12 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 12 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate M.pdf | 12 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Cert.pdf | 12 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DCH_Form 3.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 17 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 17 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_DCH Castle 310324.pdf | 14 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Blusera_Form 1_Q2.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Blusera_Form 3_Q2.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Blusera_Form 2_Q2.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Blusera_Sold_Q2.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DCH- Archi june 24.pdf | 12 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DCH Engr June 24.pdf | 12 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DCH Sold Unsold.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DCH CA Certificate june 24.pdf | 12 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DCH_Form 1_310324.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DCH_Form 2_310324.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DCH_Sold Unsold_310324.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DCH_Form 3_310324.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Blusera_Form 1.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Blusera_Form 2.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Blusera_Sold.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Blusera_Form 3.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DCH_Form 1 300923.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DCH_Form 2 300923.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DCH_Sold Unsold 300923.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DCH_Form 3 300923.pdf | 20 Oct 2023 |
| Declaration about Commencement CertificateFile: Format D Changed.pdf | 11 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A Kabir.pdf | 28 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A Manju.pdf | 28 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A Rajesh.pdf | 28 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A Tushar.pdf | 28 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A Yash.pdf | 28 Jun 2023 |
| Proforma of Agreement for saleFile: ATS Blusera 280623.pdf | 28 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Amravati
Computed across the 450+ Amravati projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 98 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DCH CASTLE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RAJAPETH450+ in Amravati
Filed coordinates, straight-line distance. 36 registered projects within 2 km.
AURA LIFESTYLE
LIFESTYLE HOME SPACES
PARIKRAMA GREENS
NITIN JUGALKISHOR CHENDULKAR
CHANDANVADI
SHRI AMARNATH BUILDERS AND DEVELOPERS
SUMERU VEDANTA 2
MARIGOLD REALITY
Vedanta Heights
Vedanta Buildcon
Amarsukh Tower
Rajeshkumar Amarlal Talreja
See every Amravati project, with the district possession charts
Builder: BLUSERA INFRASTRUCTURE
BLUSERA INFRASTRUCTURE has 1 registration on MahaRERA, including DCH CASTLE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.
Frequently asked questions
What does it mean that DCH CASTLE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if DCH CASTLE is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DCH CASTLE?
The registered promoter entity is BLUSERA INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DCH CASTLE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DCH CASTLE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DCH CASTLE?
The professionals named in the filing: Architect: ROHIT PUNSHI CAPE DESIGN STUDIO; Engineer: PAWAN RAWLANI; Chartered Accountant: CA DEEPAK S ZAMBANI G A D AND ASSOCIATES; Chartered Accountant: AAYUSH ANILKUMAR NATHANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DCH CASTLE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback