Home / Browse projects / Nashik, Maharashtra / DARUSSALAM TOWER

Completed No litigation declared Others project

DARUSSALAM TOWER

By UNITY CONSTRUCTIONS

RG-MH-92288 · RERA P51600053411 · Last updated on MahaRERA portal: 22 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
29 of 64Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

DARUSSALAM TOWER is a Others project by UNITY CONSTRUCTIONS in Nashik, Maharashtra, registered with MahaRERA as P51600053411 on 31 Oct 2023. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 6 months from the original filing. 35 of the 64 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameDARUSSALAM TOWER
  • TypeOthers
  • Location
    • Wadala Road
    • Saima Colony
    • Wadala Shiwar
    • Nashik
    • Nashik (M Corp.)
    • Nashik
    • 422006
  • Pincode422006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600053411
  • ReraGenie IDRG-MH-92288

Builder

  • NameUNITY CONSTRUCTIONS
  • Entity typePartnership
  • PartnersFarhan Ahemad Quazi, Iqbal Ahmed zamirullah Khan
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2023First promiseDec 2025Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Oct 2023
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed61 files

Current status

55%35 of 64 units booked
41.8%Work done, per cost certificate

Figures as on 22 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Darussalam TowerNA98362864

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Darussalam Tower: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed86

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots86
Closed/Covered86

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area995 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jun 2025

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI3956.78
Proposed, not sanctioned3,957 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBodhale Nagar Nashik
Estimated costRs 9.70 cr
Cost incurredRs 4.05 cr
Work done41.75%
BuildingWingEstimatedIncurred
Darussalam TowerNARs 9.70 crRs 4.05 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKapil Thakkar and Associates
EngineerJayesh Makawana
EngineerAakif Aziz Sayyed
Chartered AccountantCA Manoj G Khairnar
Chartered AccountantJAY P & CO
PartnerRole in project
UNITY CONSTRUCTIONS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27122519066Dec 2025 → Jun 2026

Reason as filed by the promoterThe physical progress of the project is completed however the process for completion certificate is initiated with Nashik Municipal corporation and the completion certificate is not yet received due to procedural compliances. As the completion date on MahaRERA portal is expiring on 31/12/2025 and later on the project will be shown as lapsed project hence I hereby request to accept this extension up to 30/06/2026.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Rera Form 1_31-03-2026.pdf22 Jul 2026
Withdrawal Update Form 2File: Rera Form 2_31-03-2026.pdf22 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf22 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf22 Jul 2026
Occupational CertificateFile: FULL OCCUPANCY CERTIFICATE.pdf22 Jul 2026
Withdrawal Update Form 1File: Rera Form 1_31-03-2026.pdf17 Jun 2026
Withdrawal Update Form 2File: Rera Form 2_31-03-2026.pdf17 Jun 2026
Withdrawal Update Form 3File: Final_DT Form 3 Mar26.pdf17 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A March 25.pdf30 Dec 2025
Form 5 (FY 2023-2024)File: RERA Audit Report 23-24.pdf30 Dec 2025
Form 5 (FY 2024-2025)File: RERA Audit Report Darussalam 24-25.pdf30 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf27 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf27 Dec 2025
Withdrawal Update Form 3File: Form 3.pdf27 Dec 2025
Withdrawal Update Form 1File: 10-AR FORM - 1 UNITY DARUSSALAM TOWER - 6A+6B-.pdf9 Nov 2025
Withdrawal Update Form 1File: 10-AR FORM - 1 UNITY DARUSSALAM TOWER - 6A+6B-.pdf9 Nov 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 June 25.pdf9 Nov 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 June 25.pdf9 Nov 2025
Withdrawal Update Form 3File: Form 3 DT June 25.pdf9 Nov 2025
Withdrawal Update Form 3File: Form 3 DT Sep 25.pdf9 Nov 2025
Withdrawal Update Form 1File: Form 1 March 25.pdf13 Oct 2025
Withdrawal Update Form 2File: Form 2 March 25.pdf13 Oct 2025
Withdrawal Update Form 3File: Form 3 March 25.pdf13 Oct 2025
Form 1File: 09-AR FORM - 1 UNITY DARUSSALAM TOWER - 6A+6B-.pdf9 Jul 2025
Form 3File: Rera C.A.Form -3 Darussalam Tower..pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discloser of sold booked Inv. ( DT )..pdf9 Jul 2025
Form 2File: Engineer Certificate.pdf9 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate DEC24.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 DEC 24.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf12 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Sep 24.pdf12 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 24_compressed (1).pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 June24.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Architect Certificate.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf21 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate for Darussalam tower for Rera.pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Darussalam Dec 23.pdf13 Feb 2024
Declaration about Commencement CertificateFile: Declaration for commencement Certificate 1.pdf23 Oct 2023
Copy of the legal title reportFile: Legal Title Report.pdf3 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Darussalam 03 10 2023.pdf3 Oct 2023
Proforma of Agreement for saleFile: Draft Agreement for sale Highlighted.pdf3 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank account declaration.pdf3 Oct 2023
Deviation Report with respect to Allotment letterFile: Deviation Declaration for Allotment.pdf3 Oct 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Concerned to Finance and Legal.pdf13 Sep 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Concerned to Finance and Legal.pdf13 Sep 2023
CERSAI detailsFile: Cersai Declaration.pdf13 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other oeg.pdf12 Sep 2023
Proforma of Allotment letterFile: Allotment Letter.pdf12 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report for AFS.pdf12 Sep 2023
Layout approvalFile: Approved layout.pdf3 Sep 2023
Building plan approvalFile: NMC Approved building plan_11zon.pdf3 Sep 2023
PAN CardFile: PAN Unity.pdf3 Sep 2023
Copy of Layout Approval (in case of layout)File: Approved layout.pdf3 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: NMC Approved building plan_11zon.pdf3 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: NMC commencement certificate.pdf3 Sep 2023
Declaration in FORM BFile: Form B.pdf3 Sep 2023

How this compares with Nashik

55%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 6 months
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DARUSSALAM TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadala Shiwar, Nashik4,100+ in Nashik

2 kmDARUSSALAM TOWERCompleted 106Lapsed / revoked 32Other 93Dot size: filed unitsN

Filed coordinates, straight-line distance. 231 registered projects within 2 km.

Builder: UNITY CONSTRUCTIONS

UNITY CONSTRUCTIONS has 5 registrations on MahaRERA, including SAI PRASAD and Mirage Tower. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if DARUSSALAM TOWER is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DARUSSALAM TOWER?

The registered promoter entity is UNITY CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DARUSSALAM TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DARUSSALAM TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DARUSSALAM TOWER?

The professionals named in the filing: Architect: Kapil Thakkar and Associates; Engineer: Jayesh Makawana; Engineer: Aakif Aziz Sayyed; Chartered Accountant: CA Manoj G Khairnar; Chartered Accountant: JAY P & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DARUSSALAM TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DARUSSALAM TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DARUSSALAM TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.