Home / Browse projects / Nashik, Maharashtra / DARUSSALAM TOWER
DARUSSALAM TOWER
RG-MH-92288 · RERA P51600053411 · Last updated on MahaRERA portal: 22 Jul 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DARUSSALAM TOWER is a Others project by UNITY CONSTRUCTIONS in Nashik, Maharashtra, registered with MahaRERA as P51600053411 on 31 Oct 2023. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 6 months from the original filing. 35 of the 64 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameDARUSSALAM TOWER
- TypeOthers
- Location
- Wadala Road
- Saima Colony
- Wadala Shiwar
- Nashik
- Nashik (M Corp.)
- Nashik
- 422006
- Pincode422006
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600053411
- ReraGenie IDRG-MH-92288
Builder
- NameUNITY CONSTRUCTIONS
- Entity typePartnership
- PartnersFarhan Ahemad Quazi, Iqbal Ahmed zamirullah Khan
- Other registrations4 more →
- Completed2 of 5
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on31 Oct 2023
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed61 files
Current status
Figures as on 22 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Darussalam Tower | NA | 9 | 8 | 36 | 28 | 64 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Darussalam Tower: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 22 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed86
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Darussalam Tower | NA | Rs 9.70 cr | Rs 4.05 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kapil Thakkar and Associates |
| Engineer | Jayesh Makawana |
| Engineer | Aakif Aziz Sayyed |
| Chartered Accountant | CA Manoj G Khairnar |
| Chartered Accountant | JAY P & CO |
| Partner | Role in project |
|---|---|
| UNITY CONSTRUCTIONS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe physical progress of the project is completed however the process for completion certificate is initiated with Nashik Municipal corporation and the completion certificate is not yet received due to procedural compliances. As the completion date on MahaRERA portal is expiring on 31/12/2025 and later on the project will be shown as lapsed project hence I hereby request to accept this extension up to 30/06/2026.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Sep 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Sep 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed61
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Rera Form 1_31-03-2026.pdf | 22 Jul 2026 |
| Withdrawal Update Form 2File: Rera Form 2_31-03-2026.pdf | 22 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 22 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A.pdf | 22 Jul 2026 |
| Occupational CertificateFile: FULL OCCUPANCY CERTIFICATE.pdf | 22 Jul 2026 |
| Withdrawal Update Form 1File: Rera Form 1_31-03-2026.pdf | 17 Jun 2026 |
| Withdrawal Update Form 2File: Rera Form 2_31-03-2026.pdf | 17 Jun 2026 |
| Withdrawal Update Form 3File: Final_DT Form 3 Mar26.pdf | 17 Jun 2026 |
| Form 2A (FY 2024-2025)File: Form 2A March 25.pdf | 30 Dec 2025 |
| Form 5 (FY 2023-2024)File: RERA Audit Report 23-24.pdf | 30 Dec 2025 |
| Form 5 (FY 2024-2025)File: RERA Audit Report Darussalam 24-25.pdf | 30 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 27 Dec 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 27 Dec 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 27 Dec 2025 |
| Withdrawal Update Form 1File: 10-AR FORM - 1 UNITY DARUSSALAM TOWER - 6A+6B-.pdf | 9 Nov 2025 |
| Withdrawal Update Form 1File: 10-AR FORM - 1 UNITY DARUSSALAM TOWER - 6A+6B-.pdf | 9 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 June 25.pdf | 9 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 June 25.pdf | 9 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 DT June 25.pdf | 9 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 DT Sep 25.pdf | 9 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 March 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 March 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 March 25.pdf | 13 Oct 2025 |
| Form 1File: 09-AR FORM - 1 UNITY DARUSSALAM TOWER - 6A+6B-.pdf | 9 Jul 2025 |
| Form 3File: Rera C.A.Form -3 Darussalam Tower..pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Discloser of sold booked Inv. ( DT )..pdf | 9 Jul 2025 |
| Form 2File: Engineer Certificate.pdf | 9 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate DEC24.pdf | 3 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 DEC 24.pdf | 1 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 12 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Sep 24.pdf | 12 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 12 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 24_compressed (1).pdf | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 June24.pdf | 28 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Architect Certificate.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 21 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 21 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate for Darussalam tower for Rera.pdf | 13 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 13 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Darussalam Dec 23.pdf | 13 Feb 2024 |
| Declaration about Commencement CertificateFile: Declaration for commencement Certificate 1.pdf | 23 Oct 2023 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 3 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Darussalam 03 10 2023.pdf | 3 Oct 2023 |
| Proforma of Agreement for saleFile: Draft Agreement for sale Highlighted.pdf | 3 Oct 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank account declaration.pdf | 3 Oct 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Declaration for Allotment.pdf | 3 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Concerned to Finance and Legal.pdf | 13 Sep 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Concerned to Finance and Legal.pdf | 13 Sep 2023 |
| CERSAI detailsFile: Cersai Declaration.pdf | 13 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other oeg.pdf | 12 Sep 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 12 Sep 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report for AFS.pdf | 12 Sep 2023 |
| Layout approvalFile: Approved layout.pdf | 3 Sep 2023 |
| Building plan approvalFile: NMC Approved building plan_11zon.pdf | 3 Sep 2023 |
| PAN CardFile: PAN Unity.pdf | 3 Sep 2023 |
| Copy of Layout Approval (in case of layout)File: Approved layout.pdf | 3 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: NMC Approved building plan_11zon.pdf | 3 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NMC commencement certificate.pdf | 3 Sep 2023 |
| Declaration in FORM BFile: Form B.pdf | 3 Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 61 filed documents as one ZIP, foldered, with a manifest
Keep DARUSSALAM TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wadala Shiwar, Nashik4,100+ in Nashik
Filed coordinates, straight-line distance. 231 registered projects within 2 km.
SIGNIFICANT
IND DEVELOPERS
Shree Parshwanath
Darshan Anil Lodha
Anandsagar Annex Phase 1 ( L and M Wing )
Ravi Mahajan Builders & Developers Pvt. Lt
SHREEJI INSPERIA
Shreeji Landmarks LLP
Pawa Blossom
Pawa Construction
Bait E Muhammad Phase 1
Onyx Constructions
See every Nashik project, with the district possession charts
Builder: UNITY CONSTRUCTIONS
UNITY CONSTRUCTIONS has 5 registrations on MahaRERA, including SAI PRASAD and Mirage Tower. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if DARUSSALAM TOWER is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DARUSSALAM TOWER?
The registered promoter entity is UNITY CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DARUSSALAM TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DARUSSALAM TOWER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DARUSSALAM TOWER?
The professionals named in the filing: Architect: Kapil Thakkar and Associates; Engineer: Jayesh Makawana; Engineer: Aakif Aziz Sayyed; Chartered Accountant: CA Manoj G Khairnar; Chartered Accountant: JAY P & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DARUSSALAM TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback