Registered No litigation declared Residential / Group Housing project

DAHISAR UDAYACHAL CO OP HSG LTD

By MAA ENTREPRENEURS

RG-MH-67647 · RERA P51800005916 · Last updated on MahaRERA portal: 12 Mar 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 75 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 75 months from the original
9 of 11Construction stages donefurthest along: Staircases, 90%
12 of 92Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 132 documents Report an error

DAHISAR UDAYACHAL CO OP HSG LTD is a Residential / Group Housing project by MAA ENTREPRENEURS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005916 on 14 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 75 months from the original filing. 80 of the 92 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameDAHISAR UDAYACHAL CO OP HSG LTD
  • TypeResidential / Group Housing
  • Location
    • Shaniswar Maharaj Marg
    • Ashokvan
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800005916
  • ReraGenie IDRG-MH-67647

Builder

  • NameMAA ENTREPRENEURS
  • Entity typePartnership
  • PartnersKISHORKUMAR CHHOGMALJI JAIN, JIGAR PRAVIN THAKKAR, BABULAL HUKMICHAND JAIN
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseSep 2020Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Sep 2020)
  • Buildings1 building record
  • Documents filed132 files

Current status

87%80 of 92 units booked
97.5%Work done, per cost certificate

Figures as on 12 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAA SHAKTINA252392092

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

MAA SHAKTI: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes85%
Landscaping & Tree PlantingYes80%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes80%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered28
Open Space32

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,200 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Mar 2026

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI7668.56
Proposed, not sanctioned5,716 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBORIVALI EAST MUMBAI 400066
Estimated costRs 7.83 cr
Cost incurredRs 7.63 cr
Work done97.46%
BuildingWingEstimatedIncurred
MAA SHAKTINARs 7.05 crRs 6.89 cr
-NARs 78.29 lakhRs 73.89 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANDEEP SHEKHAR
ArchitectUmang Senghani
EngineerN H DESAI
EngineerN.D. Rathod & Associates
Chartered AccountantH. P. Jadeja & Associates
PartnerRole in project
MAA ENTREPRENEURS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800008386Sep 2020 → Sep 2021

Reason as filed by the promoterWaiting for statutory approvals from competent plan passing authority as per DCPR 2034

EXT51800015046Sep 2020 → Jun 2024

Reason as filed by the promoterAdditional FSI from MHADA

EXT51800027918Sep 2020 → Dec 2026

Reason as filed by the promoterConstruction of Further Floors as per FSI subsequent sale proceeds and Occupancy Certificate

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000197000Flat Purchasers of Maa MonarchMaa Enterprenuer13/05/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed132

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Q1 25-26 New.pdf12 Mar 2026
Withdrawal Update Form 1File: FORM 1 Q2 25-26 New.pdf12 Mar 2026
Withdrawal Update Form 1File: FORM 1 Q3 25-26 New.pdf12 Mar 2026
Withdrawal Update Form 2File: Form-2-Q1 FY-2526-FNL.pdf12 Mar 2026
Withdrawal Update Form 2File: Form-2-Q2 FY-2526-FNL.pdf12 Mar 2026
Withdrawal Update Form 2File: Form-2-Q3 FY-2526 FNL.pdf12 Mar 2026
Withdrawal Update Form 3File: Form 3 Q1 FY-2025-26 FNL.pdf12 Mar 2026
Withdrawal Update Form 3File: Form 3 Q2 FY-2025-26 FNL.pdf12 Mar 2026
Withdrawal Update Form 3File: Form 3 Q3 FY-2025-26 FNL.pdf12 Mar 2026
Certificates of CA (Form 3)File: FORM NO 03-Q4 FY-2024-25.pdf19 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory (2).pdf19 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 Q4 24-25.pdf13 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24 sign.pdf13 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Q3-FY-23-24.pdf9 May 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory 31 12 24.pdf20 Mar 2025
Declaration in FORM BFile: Form-B Dahisar Udyanchal.pdf19 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Q4-FY-22-23.pdf11 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Q2-FY-23-24.pdf11 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Q3-FY-23-24.pdf11 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Q4-FY-23-24.pdf11 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Q1-FY-24-25.pdf11 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Q2-FY-24-25.pdf11 Mar 2025
Certificates of CA (Form 3)File: Form-3 Q1-FY-23-24.pdf6 Mar 2025
Certificates of CA (Form 3)File: Form-3 Q2-FY-23-24.pdf6 Mar 2025
Certificates of CA (Form 3)File: Form-3 Q3-FY-23-24.pdf6 Mar 2025
Certificates of CA (Form 3)File: Form-3 Q4-FY-23-24.pdf6 Mar 2025
Certificates of CA (Form 3)File: Form-3 Q1-FY-24-25.pdf6 Mar 2025
Certificates of CA (Form 3)File: Form-3 Q2-FY-24-25.pdf6 Mar 2025
Certificates of CA (Form 3)File: Form-3 Q3-FY-24-25.pdf6 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Udyanchal Full CC.pdf3 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1Q12324.pdf21 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1Q22324.pdf21 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1Q32324.pdf21 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1Q42324.pdf21 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1Q12425.pdf21 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1Q22425.pdf21 Dec 2024
Declaration in FORM BFile: FORM B.pdf8 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 2020.pdf5 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 2021.pdf5 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 2023.pdf5 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf5 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: ME- RERA - FORM-5 (2017-18).pdf18 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ME- RERA - FORM-5 (2018-19).pdf18 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ME- RERA - FORM-5 (2019-20).pdf18 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ME- RERA - FORM-5 (2020-21).pdf18 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ME- RERA - FORM-5 (2021-22).pdf18 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ME- RERA - FORM-5 (2022-23).pdf18 Aug 2023
Certificates of CA (Form 3)File: Form-3 FY-2017-18.pdf11 Aug 2023
Certificates of CA (Form 3)File: Form-3 FY-2018-19.pdf11 Aug 2023
Certificates of CA (Form 3)File: Form-3 FY-2019-20.pdf11 Aug 2023
Certificates of CA (Form 3)File: Form-3 FY-2020-21.pdf11 Aug 2023
Certificates of CA (Form 3)File: Form-3 FY-2021-22.pdf11 Aug 2023
Certificates of CA (Form 3)File: Form-3 FY-2022-23.pdf11 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ME - ANNEXURE - C FORM 2022-23.pdf2 Aug 2023
Declaration in FORM BFile: Affidavit Cum Declaration Form B.pdf11 Jul 2023
Disclosure of sold/ booked inventoryFile: SOLD BOOK INVENTORY MAA ENTERPRENEURS.pdf9 Jun 2023
Building plan approvalFile: Amended IOD.pdf30 May 2023
Building plan approvalFile: IOD Plans.pdf30 May 2023
Building Plan Approval (IOD)File: Amended IOD.pdf30 May 2023
Building Plan Approval (IOD)File: IOD Plans.pdf30 May 2023
Declaration about Commencement CertificateFile: Declaration about CC.pdf30 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM NO 2A YEAR 2019-2020 MAA ENTERPRENEURS.pdf30 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM NO 2A YEAR 2020-2021 MAA ENTERPRENEUS.pdf30 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM NO 2A YEAR 2021-2022 MAA ENTERPRENEURS.pdf30 May 2023
Commencement Certificates / NA Order for plotted developmentFile: CC NEW MHADA.pdf22 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: MAA MONARCH.pdf15 Oct 2018
Layout approvalFile: BMC PLAN.pdf30 Jul 2017
Building plan approvalFile: BMC PLAN.pdf30 Jul 2017
Building plan approvalFile: 1.pdf30 Jul 2017
Building plan approvalFile: 2.pdf30 Jul 2017
Building plan approvalFile: 3.pdf30 Jul 2017
Building plan approvalFile: 4.pdf30 Jul 2017
Building plan approvalFile: 5.pdf30 Jul 2017
Building plan approvalFile: 6.pdf30 Jul 2017
Building plan approvalFile: 9.pdf30 Jul 2017
Building plan approvalFile: 7.pdf30 Jul 2017
Building plan approvalFile: 8.pdf30 Jul 2017
Building plan approvalFile: 10.pdf30 Jul 2017
Layout approvalFile: Amended plans approval letter.pdf30 Jul 2017
Building plan approvalFile: 11.pdf30 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
HIREN CO -OP HSG SOCIETY LTDGOKHALE ROAD KANDIVALI WEST MUMBAI 40006727CompletedSep 2013Late, Jan 2014

How this compares with Mumbai Suburban

87%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 75 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DAHISAR UDAYACHAL CO OP HSG LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ashokvan6,700+ in Mumbai Suburban

2 kmDAHISAR UDAYACHAL CO OP Completed 15Lapsed / revoked 17Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: MAA ENTREPRENEURS

MAA ENTREPRENEURS has 1 registration on MahaRERA, including DAHISAR UDAYACHAL CO OP HSG LTD. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if DAHISAR UDAYACHAL CO OP HSG LTD is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DAHISAR UDAYACHAL CO OP HSG LTD?

The registered promoter entity is MAA ENTREPRENEURS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DAHISAR UDAYACHAL CO OP HSG LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DAHISAR UDAYACHAL CO OP HSG LTD?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for DAHISAR UDAYACHAL CO OP HSG LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DAHISAR UDAYACHAL CO OP HSG LTD?

The professionals named in the filing: Architect: SANDEEP SHEKHAR; Architect: Umang Senghani; Engineer: N H DESAI; Engineer: N.D. Rathod & Associates; Chartered Accountant: H. P. Jadeja & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DAHISAR UDAYACHAL CO OP HSG LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DAHISAR UDAYACHAL CO OP HSG LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DAHISAR UDAYACHAL CO OP HSG LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.