ReraGenieLog inGet a buyer report

Home / Browse projects / Sangli, Maharashtra / DAFFODILS APARTMENT

Registered No litigation declared Residential / Group Housing project

DAFFODILS APARTMENT

By Pranav Buildcon Pvt. Ltd.

RG-MH-14573 · RERA P53100029657 · Last updated on MahaRERA portal: 30 May 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 5 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
May 2027Possession promisedmoved 24 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 30%
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

DAFFODILS APARTMENT is a Residential / Group Housing project by Pranav Buildcon Pvt. Ltd. in Sangli, Maharashtra, registered with MahaRERA as P53100029657 on 14 Jun 2021. Possession is promised by 31 May 2027. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameDAFFODILS APARTMENT
  • TypeResidential / Group Housing
  • Location
    • VRINDAVAN VILLAS
    • NEAR VRINDAVAN VILLAS
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416415
  • Pincode416415
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100029657
  • ReraGenie IDRG-MH-14573

Builder

  • NamePranav Buildcon Pvt. Ltd.
  • Entity typeCompany
  • ChairpersonKishor Prabhakar Patwardhan
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects6 →

Key dates

this monthRegisteredJun 2021First promiseMay 2025Revised toMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jun 2021
  • Promised completion31 May 2027
  • Revised completionRevised to 31 May 2027 (originally 31 May 2025)
  • Buildings1 building record
  • Documents filed92 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DAFFODILS APARTMENTNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 30%.

DAFFODILS APARTMENT: 39% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed266

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots266
Closed/Covered266

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,127 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8272.64
Proposed, not sanctioned8,273 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchINDUSTRIAL ESTATE MADHAVNAGAR

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Pranav Buildcon Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53100028326May 2025 → May 2027

Reason as filed by the promoter1. Due to Covid wave and pandemic situation in 2020-21 and the second wave in further course of time the local authority declared lock down therefore the work was practically stopped. 2. In 2022 & 2023 the steel prices shoot up more than 50% & due to this the work was held up. 3. In 2021 &2024 due to high rainfall floods there was natural calamity in Sangli & Kolhapur district and the progress of work hampered due to this reason. 4. At present the customer’s response is for ready possession apartments and due to slow booking from customer the cash flow of the project is affected. Due to all th

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect1272023.pdf30 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects 11012024.pdf30 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 28062024.pdf30 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 08102024.pdf30 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 10012025.pdf30 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QUTER 1 2023.pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QUTER 2 2023.pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QUTER 3 2023.pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: qUTER 1 2024.pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QUTER 2 2024.pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: qUTER 3 2024.pdf28 May 2025
Commencement Certificates / NA Order for plotted developmentFile: COMMERCIAL CERTIFICATE.pdf28 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 2024.pdf28 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: form 5 2025.pdf28 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL 2024-2025.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024-2025.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: sold inventory.pdf30 Apr 2025
Declaration in FORM BFile: agreement 25042025.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged_compressed.pdf25 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: quality Assurance.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Q2_compressed.pdf26 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 june 2024.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate.pdf27 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf27 Jul 2024
Disclosure of sold/ booked inventoryFile: Adobe Scan 27-Jul-2024.pdf27 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure D Form 3_compressed.pdf27 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q-3 23-24_compressed.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 23-24-compressed.pdf1 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2-23-24-compressed.pdf1 Jan 2024
Other - FinanceFile: RERA circular 43.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 architect_ daffodils_22_23_compressed.pdf21 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other RERA project.pdf7 Oct 2023
Other - FinanceFile: Disclosure abt reconsilation of ac_compressed.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q4_ 22_2023_compressed.pdf6 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Lele sir 2022_23_compressed.pdf6 Oct 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold inventory form_3_10_2023.pdf3 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: cA From 5.pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA FORM 5.pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA FORM 5.pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA FORM 5.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 eng_cer_2022 end.pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 eng_cer_2023 end.pdf29 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A - 2019-2020.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 2020-2021.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 2022-2023.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2022-2023.pdf27 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Decl_Seperate Bank Ac_com.pdf8 Jul 2023
Other - FinanceFile: Notarised_Format A_Decl_cum_undertaking_bank Ac_compressed.pdf8 Jul 2023
Other - FinanceFile: Self Declaration by Promoter_ac_change.pdf8 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_quarter 3_22_23_comp.pdf5 Jul 2023
Building plan approvalFile: Daffodils revised CC plans_1_2.pdf12 Apr 2023
Building plan approvalFile: Daffodils revised CC plans_3.pdf12 Apr 2023
Building plan approvalFile: Daffodils revised CC plans_4.pdf12 Apr 2023
Building plan approvalFile: Daffodils revised CC plans_5.pdf12 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Daffodils revised CC plans_1_2.pdf12 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Daffodils revised CC plans_3.pdf12 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Daffodils revised CC plans_4.pdf12 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Daffodils revised CC plans_5.pdf12 Apr 2023
Declaration about Commencement CertificateFile: Declaration revised CC.pdf12 Apr 2023
Declaration about Commencement CertificateFile: Declaration revised draft agt to sale.pdf11 Apr 2023
Proforma of Agreement for saleFile: Final_Revised_Daffodils_Agreement to Sale_Flat_Daffodils.pdf11 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 quarter 2 21_22_comP.pdf23 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_quarter 1_21_22_comp.pdf23 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 quarter 3_21_22_comp.pdf23 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 quarter 4_21_22_compre.pdf23 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_quarter 1_22_23_comp.pdf23 Jan 2023
Declaration about Commencement CertificateFile: Declaration about CC _ 2021.pdf9 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annual Certificate Arch Sambhaji Patil.pdf9 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_ 21_22 Daffdils.pdf9 Dec 2022
Copy of the legal title reportFile: AUTHORITY.pdf7 Jun 2021
Copy of the legal title reportFile: LEGAL SEARCH.pdf7 Jun 2021
Details of encumbrancesFile: ENCUMBRANCE.pdf7 Jun 2021
Declaration in FORM BFile: AFFIDAVIT FORM B.pdf7 Jun 2021
Proforma of Allotment letterFile: Agreement of sale.pdf1 Jun 2021
Building plan approvalFile: 1 Basement.pdf19 May 2021
Building plan approvalFile: 2 Stilt floor.pdf19 May 2021
Building plan approvalFile: 3 Floors 1 to 7.pdf19 May 2021
Building plan approvalFile: 4 Elevation.pdf19 May 2021

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SAINANDAN ENCLAVES NO 17 2B 3 PLOT 10 11 12 44 MIRAJ41CompletedDec 2018Dec 2018
Amrapali ApartmentsS No 177 1 Plot no 16 and 17 Bakul Bag Miraj16CompletedMar 2016Mar 2016
Bakul Bag Twin Bunglows PH 2S No 177 Plot no 3and4 Bakul Bag Miraj5CompletedMar 2015Feb 2015
Bakul Bag Twin Bunglows PH 1S no 177 Plot no 1 and S no 178 Plot no 1 2 3 and 4 Bakul Bag Miraj10CompletedJun 2013Apr 2013
Orchid ResidencyS no 21 Plot no 135 and 136 Rama Udyan Miraj9CompletedMay 2013May 2013

How this compares with Sangli

11%of Sangli projects moved their completion datethis one moved by 24 months
29%of Sangli registrations have lapsed or been cancelledthis one is on the register

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep DAFFODILS APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR VRINDAVAN VILLAS790+ in Sangli

2 kmDAFFODILS APARTMENTCompleted 53Lapsed / revoked 17Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 90 registered projects within 2 km.

Builder: Pranav Buildcon Pvt. Ltd.

Pranav Buildcon Pvt. Ltd. has 3 registrations on MahaRERA, including SAINANDAN ENCLAVE and NISHIGANDH APRATMENTS. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if DAFFODILS APARTMENT is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DAFFODILS APARTMENT?

The registered promoter entity is Pranav Buildcon Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DAFFODILS APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DAFFODILS APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in DAFFODILS APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DAFFODILS APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DAFFODILS APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.