ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / CRESCENT WTC - OSHIWARA

Registered Litigation declared Commercial project

CRESCENT WTC - OSHIWARA

By Crescent Realtors (India) Private Limited

RG-MH-99178 · RERA PC1180002501692 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Allotment letter deviates from the model form

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 50%
0Complaints at MahaRERAon this registration
Jump to the 8 documents Report an error

CRESCENT WTC - OSHIWARA is a Commercial project by Crescent Realtors (India) Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as PC1180002501692 on 5 Dec 2025. Possession is promised by 31 Dec 2030.

At a glance

Project

  • NameCRESCENT WTC - OSHIWARA
  • TypeCommercial
  • Location
    • S. V. Road
    • Jogeshwari West
    • Oshiwara
    • Andheri
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PC1180002501692
  • ReraGenie IDRG-MH-99178

Builder

  • NameCrescent Realtors (India) Private Limited
  • Entity typeCompany
  • CINU45400MH2008PTC179458
  • GSTIN27AAECC6616M1ZD
  • DirectorsMohammed Aahil Merchant, Hilal Merchant, Jitendra Singh
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Dec 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed8 files

Current status

1.8%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sale Commercial Building (Wing 'A')NA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 50%.

Sale Commercial Building (Wing 'A'): 6% average across the applicable activities

ActivityProgress
Excavation50%
Basement (if any)15%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,060 sq m
Land owned byNot the promoter
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jan 2026
LandownerVillageDistrict
Amanulla Hasankhan DalwaiOshiwaraMumbai Suburban
Shamsher Hasankhan DalwaiOshiwaraMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchACME PLAZA, C.T.S. NO. 32OPP. SANGAM TALKIES, ANDHERI-KURLA ROAD,'ANDHERI (E), MUMBAI 400 059
Estimated costRs 12.54 cr
Cost incurredRs 22.54 lakh
Work done1.8%
BuildingWingEstimatedIncurred
Sale Commercial Building (Wing 'A')NARs 11.29 crRs 22.54 lakh
-NARs 1.25 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYMS Consultants Limited
EngineerKAUNTEY PARIKH
Chartered AccountantSagar Rajput & Co
PartnerRole in project
Crescent Realtors (India) Private Limited-

Litigation declared1

CaseCourtStatus
269 of 2023/2023Bombay City Civil Court, DindoshiOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Oct 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed8

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Jan Mar 2026.pdf30 Apr 2026
Withdrawal Update Form 2File: Form 2 Jan Mar 2026.pdf30 Apr 2026
Withdrawal Update Form 3File: Form 3 Jan Mar 2026.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1 Final.pdf25 Apr 2026
Withdrawal Update Form 225 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf25 Apr 2026
Declaration and undertaking (Annexure A)File: Declaration Cum Undertaking Annexure A.pdf14 Nov 2025
Building plan approvalFile: Jogeshwari IOD Drawing.pdf29 Oct 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
LANDMARKP51800003163MAROL, Mumbai SuburbanAug 2017CompletedDec 2019Dec 2019

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CRESCENT WTC - OSHIWARA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jogeshwari West6,700+ in Mumbai Suburban

2 kmCRESCENT WTC - OSHIWARACompleted 138Lapsed / revoked 77Abeyance 1Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 358 registered projects within 2 km.

Builder: Crescent Realtors (India) Private Limited

Crescent Realtors (India) Private Limited has 1 registration on MahaRERA, including CRESCENT WTC - OSHIWARA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if CRESCENT WTC - OSHIWARA is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CRESCENT WTC - OSHIWARA?

The registered promoter entity is Crescent Realtors (India) Private Limited, a company as per the filing. Its CIN U45400MH2008PTC179458 and GSTIN 27AAECC6616M1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CRESCENT WTC - OSHIWARA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CRESCENT WTC - OSHIWARA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CRESCENT WTC - OSHIWARA?

The professionals named in the filing: Architect: YMS Consultants Limited; Engineer: KAUNTEY PARIKH; Chartered Accountant: Sagar Rajput & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CRESCENT WTC - OSHIWARA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CRESCENT WTC - OSHIWARA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CRESCENT WTC - OSHIWARA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.