Home / Browse projects / Bengaluru Urban, Karnataka / CONCORDE SIENNA
CONCORDE SIENNA
By Concorde Housing Corporation Pvt Ltd
RG-KA-43928 · RERA PRM/KA/RERA/1251/446/PR/220626/008740 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
CONCORDE SIENNA is a Residential/Group Housing project by Concorde Housing Corporation Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/220626/008740 on 22 Jun 2026. Possession is promised by 27 Jul 2031. 40 of the 260 units on this registration are recorded sold or booked, and 0 of 17 construction stages are filed complete.
At a glance
Project
- NameCONCORDE SIENNA
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 562149
- Pincode562149
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/220626/008740
- ReraGenie IDRG-KA-43928
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on22 Jun 2026
- Promised completion27 Jul 2031
- Revised completionNone
- Buildings1 building record
- Documents filed131 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 260 | 0 | 260 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 17 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 15%.
Building: 1% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 15% |
| Foundation footing work | 0% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 0% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 0% |
| Gym | No | Not applicable |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
Land and ownership4
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Concorde Housing Corporation Pvt Ltd | - | - |
| Concorde Housing Corporation Pvt Ltd | - | - |
| Concorde Housing Corporation Pvt Ltd | - | - |
| Concorde Housing Corporation Pvt Ltd | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 85.48 cr | Rs 30.36 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 61.64 cr | Rs 3.21 lakh |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 45.92 cr | Rs 3.39 cr |
| On-site expenditure-Salaries of workers | Rs 29.55 cr | Rs 5.21 lakh |
| Payment of taxes | Rs 24.96 cr | Rs 17.49 lakh |
| On-site expenditure-Site Overhead | Rs 5.23 cr | Rs 1.87 cr |
| On-site expenditure-Consultants Fees | Rs 2.61 cr | - |
| Payment of cess | Rs 1.43 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. Dilip Srikanth Nadig |
| Engineer | Ajith Kumar D |
| Chartered Accountant | P Vinod Kumar |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed131
As listed on the registration, under the names the promoter filed them with; the newest 80 of 131 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/220626/008740 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Sienna.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Sienna arch.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Sienna engr.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CHCPL-Form 4 Sienna Q1.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Sienna Arch Cert.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Sienna Engr Cert.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| BUILDING PLAN APPROVAL LETTERFile: BUILDING PLAN APPROVAL LETTER.pdf | 19 Jun 2026 |
| CLU COPYFile: CHANGE OF LAND USE.pdf | 19 Jun 2026 |
| KSPCB NOC PAYMENT RECEIPT AND AFFIDAVITFile: KSPCB NOC AND AFFIDAVIT.pdf | 19 Jun 2026 |
| STRUCTURAL STABILITY CERTIFICATEFile: STRUCTURAL STABILTY CERTIFICATE.pdf | 18 Jun 2026 |
| STRUCTURAL ENGINEER LICENSEFile: H P YOGESH LICENSE STRUCTURAL CONSULTANT.pdf | 18 Jun 2026 |
| DEVELOPMENT PLANFile: DEVELOPMENT PLAN.pdf | 18 Jun 2026 |
| DEVELOPMENT PLAN LETTERFile: DEVELOPMENT PLAN LETTER.pdf | 18 Jun 2026 |
| PLAN SANCTION LETTERFile: SANCTION LETTER.pdf | 18 Jun 2026 |
| JOINT SURVEY SKETCHFile: JOINT SURVEY SKETCH.pdf | 18 Jun 2026 |
| GOOGLE COORDINATES OF THE PROJECTFile: GOOGLE COORDINATES.pdf | 18 Jun 2026 |
| FULL BUILDING PLANFile: APPROVED BUILDING PLAN.pdf | 18 Jun 2026 |
| NORTH SIDE ELEVATION PLANFile: NORTH SIDE ELEVATION PLAN.pdf | 18 Jun 2026 |
| SECTION PLANFile: SECTION Y Y PLAN.pdf | 18 Jun 2026 |
| KSPCB ACKNOWLEDGEMENTFile: KSPCB-CFE ACKNOWLEDGEMENT.pdf | 18 Jun 2026 |
| PROJECT BROCHUREFile: PROJECT BROCHURE.pdf | 18 Jun 2026 |
| AMENITIES DETAILSFile: AMENITIES DETAILS.pdf | 18 Jun 2026 |
| CLARIFICATIONSFile: CLARIFICATIONS.pdf | 18 Jun 2026 |
| SEIAA ACKNOWLEDGEMENTFile: MOEF ACKNOWLEDGEMENT.pdf | 18 Jun 2026 |
| AFFIDAVIT FOR KSPCB NOCFile: AFFIDAVIT-KSPCB.pdf | 18 Jun 2026 |
| AFFIDAVIT FOR SEIAA NOCFile: AFFIDAVIT-MOEF.pdf | 18 Jun 2026 |
| RTC, survey 108/1 | - |
| Mutation, survey 108/1 | - |
| Encumbrance Certificate, survey 108/1 | - |
| Conversion/Alienation Order, survey 108/1 | - |
| Sale/Title/Gift Deed, survey 108/1 | - |
| Khatha, survey 108/1 | - |
| RTC, survey 108/2 | - |
| Mutation, survey 108/2 | - |
| Encumbrance Certificate, survey 108/2 | - |
| Conversion/Alienation Order, survey 108/2 | - |
| Sale/Title/Gift Deed, survey 108/2 | - |
| Khatha, survey 108/2 | - |
| RTC, survey 108/3 | - |
| Mutation, survey 108/3 | - |
| Encumbrance Certificate, survey 108/3 | - |
| Conversion/Alienation Order, survey 108/3 | - |
| Sale/Title/Gift Deed, survey 108/3 | - |
| Khatha, survey 108/3 | - |
| RTC, survey 110/2 | - |
| Mutation, survey 110/2 | - |
| Encumbrance Certificate, survey 110/2 | - |
| Conversion/Alienation Order, survey 110/2 | - |
| Sale/Title/Gift Deed, survey 110/2 | - |
| Khatha, survey 110/2 | - |
| Registration CertificateFile: CHCPLCertificate of Incorporation.pdf | - |
| Memorandum of AssociationFile: CHCPLMOA.PDF | - |
| Article of AssociationFile: CHCPLAOA.pdf | - |
| GST CertificateFile: CHCPLGST Certifcate.pdf | - |
| Organization StructureFile: Organisation Chart of CHCPL Head Office.pdf | - |
| Certificate issued by CA Form 1File: FORM 1 CA CERTIFICATE.pdf | - |
| Certificate issued by Architect Form 2File: FORM 2 ARCHITECT CERTIFICATE.pdf | - |
| Certificate issued by Engineer Form 3File: FORM 3 ENGINEER CERTIFICATE.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: NO LITIGATION.pdf | - |
| Balance Sheet 2024 - 2025File: BS WITH SCHEDULES 2024-25.pdf | - |
| Balance Sheet 2023 - 2024File: BS WITH SCHEDULES 2023-24.pdf | - |
| Balance Sheet 2022 - 2023File: BS WITH SCHEDULE 2022-23.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: P AND L WITH SCHEDULES 2024-25.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: P AND L WITH SCHEDULES 2023-24.pdf | - |
Promoter's earlier projects9
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Concorde Neo | Sy No.98, Khatha No. 33/1/98, Thirumenahalli Village , Yelahanka Hobli | Ongoing | Oct 2029 | Not due yet |
| Concorde Antares | Sy No.26/1 & 26/2, Chikkabettahalli Village, Yelahanka Hobli, Bangalore North Taluk | Ongoing | Dec 2028 | Not due yet |
| Concorde Mayfair | Khatha No.911/140, Sy No.139/1, 140 & 141 , Yelahanka Village, Yelahanka Hobli , Bengaluru North | Ongoing | Nov 2028 | Not due yet |
| Concorde Equity Phase II | Sy.No.135/3 and 135/5 of Maliyappanahalli Village , Kasaba Hobli , Maluru | Ongoing | May 2027 | Not due yet |
| Concorde Spring Meadows | Sy No.5/1C & 7, Chikkasandra Village, Yeshwanthpura Hobli | Completed | - | No date filed |
| Concorde Luxepolis | No.29, K P Puttanna Chetty Road, Chamrajpet | Completed | - | No date filed |
| Concorde Equity | Sy.No.134/2,135/1,135/2,135/4,137/3,139/1,140/2,151,155/1and 155/2 of Maliyappanahalli Village, Kasaba Hobli, Malur Taluk | Completed | - | No date filed |
| Concorde Econex | Plot No.27A, Doddanekundi Industrial Area, 1st Phase, Doddanekundi Village,KR Puram Hobli, Bangalore East Taluk | Completed | - | No date filed |
| Concorde Auriga | Sy No.31/2B, 34/1 & 35, Medihalli Village, Bidarahalli Hobli, Bangalore East | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep CONCORDE SIENNA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Soul@Godrej Ananda
Universal Metro Properties LLP
Dioro & Beryl at Brigade El Dorado
Brigade Tetrarch Private Limited
Emerald & Luminaire Block at Brigade El Dorado
Brigade Tetrarch Private Limited
Northern Lights by Puravankara KVN
KVN Property Holdings LLP
Godrej Ananda Phase 2
Universal Metro Properties LLP
TVS EMERALD ALTURA
EMERALD HAVEN PROPERTIES PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: Concorde Housing Corporation Pvt Ltd
Concorde Housing Corporation Pvt Ltd has 11 registrations on RERA Karnataka, including Concorde Mayfair and Concorde Spring Meadows. Its filings declare 12 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if CONCORDE SIENNA is delayed beyond 27 Jul 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of CONCORDE SIENNA?
The registered promoter entity is Concorde Housing Corporation Pvt Ltd, a company as per the filing. Its CIN U70102KA2008PTC046886 and GSTIN 29AADCC4087F1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in CONCORDE SIENNA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at CONCORDE SIENNA?
The professionals named in the filing: Architect: Ar. Dilip Srikanth Nadig; Engineer: Ajith Kumar D; Chartered Accountant: P Vinod Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CONCORDE SIENNA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback