Home / Browse projects / Pune, Maharashtra / CLASSIC AMRUT

Registered No litigation declared Others project

CLASSIC AMRUT

By CLASSIC INFRA

RG-MH-96131 · RERA P52100054029 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 97%
25 of 71Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

CLASSIC AMRUT is a Others project by CLASSIC INFRA in Pune, Maharashtra, registered with MahaRERA as P52100054029 on 19 Dec 2023. Possession is promised by 24 Oct 2026. 46 of the 71 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameCLASSIC AMRUT
  • TypeOthers
  • Location
    • RAJGURUNAGAR
    • Rajgurunagar (CT)
    • Khed
    • Pune
    • 410505
  • Pincode410505
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054029
  • ReraGenie IDRG-MH-96131

Builder

  • NameCLASSIC INFRA
  • Entity typePartnership
  • GSTIN27AASFC4482G1Z2
  • PartnersDHANANJAY DWARKANATH BHAGWAT, DATTA MARUTI THORAT

Key dates

this monthRegisteredDec 2023PromisedOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Dec 2023
  • Promised completion24 Oct 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed80 files

Current status

65%46 of 71 units booked
96.3%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA77261137
BUILDING BNA6634034

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 97%.

BUILDING A63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.97%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.97%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed88

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots88
Closed/Covered18
Open Space70
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A103545
BUILDING B83543

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,670 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Sep 2024

Approvals and building plan

Sanctioning authorityRAJGURUNAGAR MUNICIPAL COUNCIL
Permissible FSI4121.0
Proposed, not sanctioned4,121 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAJGURUNAGAR
Estimated costRs 11.09 cr
Cost incurredRs 10.68 cr
Work done96.35%
BuildingWingEstimatedIncurred
BUILDING ANARs 5.88 crRs 5.75 cr
BUILDING BNARs 4.99 crRs 4.92 cr
-NARs 22.00 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANTHAN ARCHITECTS
EngineerRAVINDRA A. KARNAWAT
EngineerSHUBHAM RAMPURE
Chartered AccountantPGMJ AND ASSOCIATES
Chartered AccountantA S JANGADA & ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
CLASSIC INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 24 Oct 2026

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q1 FY 2026-27.pdf14 Jul 2026
Withdrawal Update Form 2File: Form 2 Q1 FY 2026-27.pdf14 Jul 2026
Withdrawal Update Form 3File: Form 3 Q1 FY 2026-27.pdf14 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf12 May 2026
Withdrawal Update Form 1File: Form 1 Q4 FY 2025-26.pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4 FY 2025-26.pdf9 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4 FY 2025-26.pdf9 Apr 2026
Withdrawal Update Form 1File: From 1.pdf15 Jan 2026
Withdrawal Update Form 2File: From -2.pdf15 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf15 Jan 2026
Form 5 (FY 2024-2025)File: From 5 Signed.pdf25 Nov 2025
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf15 Oct 2025
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf15 Oct 2025
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf15 Oct 2025
Withdrawal Update Form 1File: From 1-Upload.pdf9 Sep 2025
Withdrawal Update Form 2File: Engineer’s Certificate Form-Upload_compressed.pdf9 Sep 2025
Withdrawal Update Form 3File: Form 3 Final Upload.pdf9 Sep 2025
Form 1File: From -1-31-3-2025 final 1.pdf17 Jul 2025
Form 2File: Final Form 2.pdf17 Jul 2025
Form 3File: Form 3 CA Signed Final_compressed.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD CIRCULAR as on 31-3-2025.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From -1-31-3-2025 final 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Signed Final_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD CIRCULAR as on 31-3-2025.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: sold inventory.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf11 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold -Booked inventory -31-12-2024.pdf11 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24 Final.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Organised.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: sold inventory 1.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -Q1-05-07-2024.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Upload.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Upload.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Signed_compressed.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf6 May 2024
Layout approvalFile: Layout 1.pdf3 May 2024
Building plan approvalFile: Layout 2.pdf3 May 2024
Copy of Layout Approval (in case of layout)File: Layout 1.pdf3 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout 2.pdf3 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 4) CC.pdf3 May 2024
Declaration about Commencement CertificateFile: 3)DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: sold unsold inventery.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Final.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FINAL.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate FINAL.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate FINAL.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL.pdf12 Jan 2024
Proforma of Agreement for saleFile: AFS new.pdf8 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank declaration final upload.pdf2 Dec 2023
Copy of the legal title reportFile: Legal Title new.pdf24 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_compressed.pdf17 Nov 2023
Other - LegalFile: exchange deed_compressed.pdf17 Nov 2023
Other - LegalFile: 7 - 12.pdf17 Nov 2023
CERSAI detailsFile: Cersai report highlighted.pdf31 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexture A.pdf31 Oct 2023
Layout approvalFile: New layout highlighted.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: New layout highlighted.pdf27 Oct 2023
Details of encumbrances concerned to FinanceFile: Fin enc.pdf13 Oct 2023
Details of encumbrances concerned to LegalFile: Fin enc.pdf13 Oct 2023
Declaration about Commencement CertificateFile: Circular 32.pdf13 Oct 2023
Declaration in FORM BFile: form B.pdf13 Oct 2023
Proforma of Allotment letterFile: allotment letter.pdf13 Oct 2023
Deviation Report with respect to Allotment letterFile: No dev allot.pdf13 Oct 2023
Deviation Report with respect to model copy of AgreementFile: No dev agree.pdf13 Oct 2023
Building plan approvalFile: PLAN 2.pdf11 Oct 2023
Building plan approvalFile: PLAN 3.pdf11 Oct 2023
PAN CardFile: FIRM PAN CARD.pdf11 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 2.pdf11 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 3.pdf11 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf11 Oct 2023

How this compares with Pune

65%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CLASSIC AMRUT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAJGURUNAGAR13,700+ in Pune

2 kmCLASSIC AMRUTCompleted 9Lapsed / revoked 10Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 30 registered projects within 2 km.

Builder: CLASSIC INFRA

CLASSIC INFRA has 1 registration on MahaRERA, including CLASSIC AMRUT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if CLASSIC AMRUT is delayed beyond 24 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CLASSIC AMRUT?

The registered promoter entity is CLASSIC INFRA, a partnership as per the filing. Its GSTIN 27AASFC4482G1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CLASSIC AMRUT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CLASSIC AMRUT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CLASSIC AMRUT?

The professionals named in the filing: Architect: MANTHAN ARCHITECTS; Engineer: RAVINDRA A. KARNAWAT; Engineer: SHUBHAM RAMPURE; Chartered Accountant: PGMJ AND ASSOCIATES; Chartered Accountant: A S JANGADA & ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CLASSIC AMRUT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CLASSIC AMRUT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CLASSIC AMRUT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.