Home / Browse projects / Ahmednagar, Maharashtra / CITY PRIDE
CITY PRIDE
RG-MH-58049 · RERA P52200015264 · Last updated on MahaRERA portal: 28 Jan 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Ahmednagar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CITY PRIDE is a Commercial project by VIPUL NANDANMAL BAFNA in Ahmednagar, Maharashtra, registered with MahaRERA as P52200015264 on 12 Feb 2018. The registration is recorded completed; possession was promised by 31 Jan 2020.
At a glance
Project
- NameCITY PRIDE
- TypeCommercial
- Location
- GHULEWADI
- SANGAMNER
- Ghulewadi (CT)
- Ahmednagar
- 422605
- Pincode422605
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52200015264
- ReraGenie IDRG-MH-58049
Builder
- NameVIPUL NANDANMAL BAFNA
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on12 Feb 2018
- Promised completion31 Jan 2020
- Revised completionNone
- Buildings1 building record
- Documents filed18 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CITY PRIDE | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
CITY PRIDE: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed8
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PUSHPABAI NANADANMAL BAFNA | Sangamner (MCL) | Ahmednagar |
| NANDANMAL BANDULAL BAFNA | Sangamner (MCL) | Ahmednagar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MADHUSUDAN BALKISAN KABRA |
| Partner | Role in project |
|---|---|
| VIPUL NANDANMAL BAFNA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Feb 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Feb 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Feb 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Oct 2021
Documents filed18
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 28 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: AUDIT REPORT 31032020 VIPUL.pdf | 1 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AUDIT REPORT 31 3-2021 VIPUL.pdf | 1 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Vipul 2a 31 march.pdf | 27 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: city pride inventory.pdf | 27 Oct 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: vipul architect certificate.pdf | 27 Oct 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETATION CERTIFICATE.pdf | 27 Oct 2021 |
| Layout approvalFile: lay out.PDF | 3 Feb 2018 |
| Building plan approvalFile: building plan.PDF | 3 Feb 2018 |
| PAN CardFile: pan card.pdf | 3 Feb 2018 |
| Copy of the legal title reportFile: legal title report.pdf | 3 Feb 2018 |
| Details of encumbrancesFile: Encumbrance Letterpdf.pdf | 3 Feb 2018 |
| Copy of Layout Approval (in case of layout)File: lay out.PDF | 3 Feb 2018 |
| Building Plan Approval (IOD)File: building plan.PDF | 3 Feb 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: commensment certificate.pdf | 3 Feb 2018 |
| Declaration in FORM BFile: FORM B PDF.pdf | 3 Feb 2018 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 3 Feb 2018 |
| Proforma of Allotment letterFile: AGREEMENT RERA - CITY PRIDE.pdf | 3 Feb 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ahmednagar
Computed across the 490+ Ahmednagar projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 18 filed documents as one ZIP, foldered, with a manifest
Keep CITY PRIDE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SANGAMNER490+ in Ahmednagar
Filed coordinates, straight-line distance. 8 registered projects within 2 km.
Sampurnam
KAMALGANGA BUILDCON
JAY BHADRA RESIDENCY
Santosh Ramesh Fatangare
Unicorn Nest II
Unicorn Developers
MORYA GANGAI
MORYA CONSTRUCTION
SAMARTHA PLAZA
YASHASHRI BUILDCON
Navrang Heights
Navrang Corporation
See every Ahmednagar project, with the district possession charts
Builder: VIPUL NANDANMAL BAFNA
VIPUL NANDANMAL BAFNA has 1 registration on MahaRERA, including CITY PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ahmednagar district page.
Frequently asked questions
What are my rights if CITY PRIDE is delayed beyond 31 Jan 2020?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CITY PRIDE?
The registered promoter entity is VIPUL NANDANMAL BAFNA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CITY PRIDE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CITY PRIDE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CITY PRIDE?
The professionals named in the filing: Architect: MADHUSUDAN BALKISAN KABRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CITY PRIDE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback