ReraGenieLog inGet a buyer report

Home / Browse projects / Ratnagiri, Maharashtra / CITY PRIDE

Registered No litigation declared Others project

CITY PRIDE

By Mahammad Salim Sayyad

RG-MH-30752 · RERA P52800031330 · Last updated on MahaRERA portal: 22 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
4 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 75%
53 of 85Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

CITY PRIDE is a Others project by Mahammad Salim Sayyad in Ratnagiri, Maharashtra, registered with MahaRERA as P52800031330 on 15 Oct 2021. Possession is promised by 31 Dec 2028. 32 of the 85 units on this registration are recorded sold or booked, and 4 of 33 construction stages are filed complete.

At a glance

Project

  • NameCITY PRIDE
  • TypeOthers
  • Location
    • NA
    • Mandangad
    • Ratnagiri
    • 415203
  • Pincode415203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800031330
  • ReraGenie IDRG-MH-30752

Builder

  • NameMahammad Salim Sayyad
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2021PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Oct 2021
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed84 files

Current status

38%32 of 85 units booked
36.1%Work done, per cost certificate

Figures as on 22 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1NA64292655
Building 2NA7416016
Building 3NA5414014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 75%.

Building 146%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building 30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered15
BuildingClosed/CoveredTotal
Building 177
Building 255
Building 333

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,031 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Sharad Shantaram LendeMandangadRatnagiri
Rajendra Shantaram LendeMandangadRatnagiri
Ratnaprabha Sharad LendeMandangadRatnagiri

Approvals and building plan

Sanctioning authorityOffice Of The Mandangad Nagarpanchayat
Permissible FSI3255.96
Proposed, not sanctioned3,256 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchApashchrya ,Ground Floor,Keshavshet Lende Nagar,At Post Mandangad,Dist Ratnagiri,Maharashtra 415203
Estimated costRs 6.36 cr
Cost incurredRs 2.30 cr
Work done36.14%
BuildingWingEstimatedIncurred
Building 1NARs 3.50 crRs 2.30 cr
Building 2NARs 1.50 cr-
Building 3NARs 1.36 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRavindra Mahadeo Patil
EngineerRavindra Mahadeo Patil
EngineerJayram Sidappa Kotera
Chartered AccountantShreyas Shrikant Kakirde
Chartered AccountantAparna Sachin Kulkarni
PartnerRole in project
Mahammad Salim Sayyad-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate 30-06-2025.pdf22 Dec 2025
Withdrawal Update Form 1File: Architect Certificate 30-09-2025.pdf22 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate 30-06-2025.pdf22 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate 30-09-2025.pdf22 Dec 2025
Withdrawal Update Form 3File: CA Certificate 30-06-2025.pdf22 Dec 2025
Withdrawal Update Form 3File: CA Certificate 30-09-2025.pdf22 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf22 Dec 2025
Form 5 (FY 2024-2025)File: Audit Report.pdf22 Dec 2025
Form 1File: Form 1 - Architect Certificate (31-12-2021).pdf16 Dec 2025
Form 2File: Form 2 - Engineer Certificate (31-12-2021).pdf16 Dec 2025
Form 3File: 1-CA Certificate 31-12-2021.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Ca Letter (30-06-2022).pdf16 Dec 2025
Form 1File: Form 1 - Architect Certificate (31-03-2022).pdf16 Dec 2025
Form 2File: Form 2 - Engineer Certificate (31-03-2022).pdf16 Dec 2025
Form 3File: 2-CA Certificate 31-03-2022.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory (31-03-2022).pdf16 Dec 2025
Form 1File: Form 1 - Architect Certificate (30-06-2022).pdf16 Dec 2025
Form 2File: Form 2 - Engineer Certificate (30-06-2022).pdf16 Dec 2025
Form 3File: 3-CA Certificate 30-06-2022.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory (30-06-2022).pdf16 Dec 2025
Form 1File: Form 1 - Architect Certificate (30-09-2022).pdf16 Dec 2025
Form 2File: Form 2 - Engineer Certificate (30-09-2022).pdf16 Dec 2025
Form 3File: 4-CA Certificate 30-09-2022.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory (30-09-2022).pdf16 Dec 2025
Form 1File: Form 1 - Architect Certificate (31-12-2022).pdf16 Dec 2025
Form 2File: Form 2 - Engineer Certificate (31-12-2022).pdf16 Dec 2025
Form 3File: 5-CA Certificate 31-12-2022.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory (31-12-2022).pdf16 Dec 2025
Form 1File: Form 1 - Architect Certificate (31-03-2023).pdf16 Dec 2025
Form 2File: Form 2 - Engineer Certificate (31-03-2023).pdf16 Dec 2025
Form 3File: 6-CA Certificate 31-03-2023.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory (31-03-2023).pdf16 Dec 2025
Form 1File: Form 1 - Architect Certificate (30-06-2023).pdf16 Dec 2025
Form 2File: Form 2 - Engineer Certificate (30-06-2023).pdf16 Dec 2025
Form 3File: 7-CA Certificate 30-06-2023.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory (30-06-2023).pdf16 Dec 2025
Form 1File: Form 1 - Architect Certificate (30-09-2023).pdf16 Dec 2025
Form 2File: Form 2 - Engineer Certificate (30-09-2023).pdf16 Dec 2025
Form 3File: 8-CA Certificate 30-09-2023.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory (30-09-2023).pdf16 Dec 2025
Form 1File: Form 1 - Architect Certificate (31-12-2023).pdf16 Dec 2025
Form 2File: Form 2 - Engineer Certificate (31-12-2023).pdf16 Dec 2025
Form 3File: 9-CA Certificate 31-12-2023.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory (31-12-2023).pdf16 Dec 2025
Form 1File: Form 1 - Architect Certificate (31-03-2024).pdf16 Dec 2025
Form 2File: Form 2 - Engineer Certificate (31-03-2024).pdf16 Dec 2025
Form 3File: 10-CA Certificate 31-03-2024.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory (31-03-2024).pdf16 Dec 2025
Form 1File: Form 1 - Architect Certificate (30-06-2024).pdf16 Dec 2025
Form 2File: Form 2 - Engineer Certificate (30-06-2024).pdf16 Dec 2025
Form 3File: 11-CA Certificate 30-06-2024.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory (30-06-2024).pdf16 Dec 2025
Form 1File: Form 1 - Architect Certificate (30-09-2024).pdf16 Dec 2025
Form 2File: Form 2 - Engineer Certificate (30-09-2024).pdf16 Dec 2025
Form 3File: 12-CA Certificate 30-09-2024.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory (30-09-2024).pdf16 Dec 2025
Form 1File: Form 1 - Architect Certificate (31-12-2024).pdf16 Dec 2025
Form 2File: Form 2 - Engineer Certificate (31-12-2024).pdf16 Dec 2025
Form 3File: 13-CA Certificate 31-12-2024.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory (31-12-2024).pdf16 Dec 2025
Form 1File: Form 1 - Architect Certificate (31-03-2025).pdf16 Dec 2025
Form 2File: Form 2 - Engineer Certificate (31-03-2025).pdf16 Dec 2025
Form 3File: 14-CA Certificate 31-03-2025.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory (31-03-2025).pdf16 Dec 2025
Layout approvalFile: Nakasha.pdf8 Oct 2021
Copy of Layout Approval (in case of layout)File: Nakasha.pdf8 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Format D.pdf8 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf8 Oct 2021
Copy of the legal title reportFile: Search Report.pdf1 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf1 Oct 2021
Building plan approvalFile: Blueprint 1.pdf28 Sep 2021
Building plan approvalFile: Blueprint 2.pdf28 Sep 2021
Building plan approvalFile: Blueprint 3.pdf28 Sep 2021
PAN CardFile: PAN Card.pdf28 Sep 2021
Details of encumbrancesFile: Encumbrance Certificate.pdf28 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Blueprint 1.pdf28 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Blueprint 2.pdf28 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Blueprint 3.pdf28 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 Sep 2021
Declaration about Commencement CertificateFile: Format D.pdf28 Sep 2021

How this compares with Ratnagiri

38%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep CITY PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mandangad1,100+ in Ratnagiri

2 kmCITY PRIDECompleted 2Lapsed / revoked 1Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: Mahammad Salim Sayyad

Mahammad Salim Sayyad has 2 registrations on MahaRERA, including Sayyad Complex and CITY PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if CITY PRIDE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CITY PRIDE?

The registered promoter entity is Mahammad Salim Sayyad, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CITY PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CITY PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CITY PRIDE?

The professionals named in the filing: Architect: Ravindra Mahadeo Patil; Engineer: Ravindra Mahadeo Patil; Engineer: Jayram Sidappa Kotera; Chartered Accountant: Shreyas Shrikant Kakirde; Chartered Accountant: Aparna Sachin Kulkarni. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CITY PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CITY PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CITY PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.