Registered No litigation declared Commercial project

City Center Tower

By City Centre Developers

RG-MH-40007 · RERA P52600016314 · Last updated on MahaRERA portal: 3 May 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 54 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 54 months from the original
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

City Center Tower is a Commercial project by City Centre Developers in Solapur, Maharashtra, registered with MahaRERA as P52600016314 on 3 May 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 54 months from the original filing.

At a glance

Project

  • NameCity Center Tower
  • TypeCommercial
  • Location
    • VIP Road
    • Solapur (M Corp.)
    • Solapur North
    • Solapur
    • 413003
  • Pincode413003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600016314
  • ReraGenie IDRG-MH-40007

Builder

  • NameCity Centre Developers
  • Entity typePartnership
  • PartnersPrakash Bhandari, Navnath Indapure, Rajshekhar Basavraj Minajagi

Key dates

this monthRegisteredMay 2018First promiseJun 2022Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 May 2018
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 15 Jun 2022)
  • Buildings1 building record
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
City Centre TowerNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

City Centre Tower: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 3 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
UPS Battery BackUpYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered1
Open Space1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area802 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1690.0
Proposed, not sanctioned1,690 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDuffrin Chowk, Solapur

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTauhid Shaikh
PartnerRole in project
City Centre Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52600028170Jun 2022 → Dec 2026

Reason as filed by the promoterWe, City Centre Developers, hereby apply for extension u/s 7(3) of the registered project bearing vide no P52600016314. As prescribed under circular no 07/2019 dated 08 Feb 2019, the consent of 51% of the allottees is enclosed herewith.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 3 Q1 23.pdf3 May 2025
Certificates of CA (Form 3)File: Form 3 Q2 23.pdf3 May 2025
Certificates of CA (Form 3)File: Form 3 Q3 23.pdf3 May 2025
Certificates of CA (Form 3)File: Form 3 Q4 23.pdf3 May 2025
Certificates of CA (Form 3)File: Form 3 Q1 24.pdf3 May 2025
Certificates of CA (Form 3)File: Form 3 Q2 24.pdf3 May 2025
Certificates of CA (Form 3)File: Form 3 Q3 24.pdf3 May 2025
Certificates of CA (Form 3)File: Form 3 Q4 24.pdf3 May 2025
Certificates of CA (Form 3)File: Form 3 Q1 25 (1).pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - Engineer 1920.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Engineer 2021.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Inventory Disclosure - CCD.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Engineer 2122.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Engineer 2223.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Engineer 2324.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Engineer 2425.pdf3 May 2025
Declaration in FORM BFile: Scan27032025-3 (2)_compressed.pdf11 Apr 2025
Certificates of CA (Form 3)File: Form 3 - CA CCD Q123.pdf5 Apr 2025
Certificates of CA (Form 3)File: Form 3 - CA CCD Q223.pdf5 Apr 2025
Certificates of CA (Form 3)File: Form 3 - CA CCD Q323.pdf5 Apr 2025
Certificates of CA (Form 3)File: Form 3 - CA CCD Q423.pdf5 Apr 2025
Certificates of CA (Form 3)File: Form 3 - CA CCD Q124.pdf5 Apr 2025
Certificates of CA (Form 3)File: Form 3 - CA CCD Q224.pdf5 Apr 2025
Certificates of CA (Form 3)File: Form 3 - CA CCD Q324.pdf5 Apr 2025
Certificates of CA (Form 3)File: Form 3 - CA CCD Q424.pdf5 Apr 2025
Certificates of CA (Form 3)File: Form 3 - CA CCD Q125.pdf5 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - CA 2122.pdf5 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - CA 2223.pdf5 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - CA 2324.pdf5 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1 23.pdf15 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2 23.pdf15 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3 23.pdf15 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4 23.pdf15 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1 24.pdf15 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2 24.pdf15 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3 24.pdf15 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4 24.pdf15 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Q1 23.pdf15 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Q2 23.pdf15 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Q3 23.pdf15 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Q4 23.pdf15 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Q1 24.pdf15 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Q2 24.pdf15 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Q3 24.pdf15 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Q4 24.pdf15 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building City tower form1 04_18.pdf28 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCD f1 4-19.pdf28 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building City tower form1 01_19.pdf28 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building City tower form1 7_19.pdf28 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building City tower form02 40-97.pdf28 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building City tower form2 34-43.pdf28 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building City tower form2 40-97.pdf28 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building City tower form2 45-29.pdf28 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building City tower form2 47-95.pdf28 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Building City tower form2a.pdf28 Feb 2023
Certificates of CA (Form 3)File: Building City tower form3 34-43.pdf28 Feb 2023
Certificates of CA (Form 3)File: Building City tower form3 45-39.pdf28 Feb 2023
Certificates of CA (Form 3)File: Building City tower form3 47-95.pdf28 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CCD f5 04-22 (2).pdf28 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ccd f5 04-22.pdf28 Feb 2023
Building plan approvalFile: scan0548 new_compressed.pdf12 Nov 2019
Building Plan Approval (IOD)File: scan0548 new_compressed.pdf12 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: GST.pdf12 Nov 2019
Layout approvalFile: scan0548 new (1)_compressed.pdf30 Oct 2019
Copy of Layout Approval (in case of layout)File: scan0548 new (1)_compressed.pdf30 Oct 2019
Layout approvalFile: CCD Solapur No Layout Approval RERA Care.pdf2 May 2018
Copy of Layout Approval (in case of layout)File: CCD Solapur No Layout Approval RERA Care.pdf2 May 2018
Proforma of Allotment letterFile: CCD Solapur No Sale Deed Declaration RERA Care.pdf2 May 2018
Building plan approvalFile: CCD Building Plan RERA Care.pdf20 Apr 2018
PAN CardFile: CCD Pan Card RERA Care.pdf20 Apr 2018
Copy of the legal title reportFile: CCD Search Report RERA CARE.pdf20 Apr 2018
Details of encumbrancesFile: CCD Search Report RERA CARE.pdf20 Apr 2018
Building Plan Approval (IOD)File: CCD Building Plan RERA Care.pdf20 Apr 2018
Declaration in FORM BFile: CCD Form B.pdf20 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCD Architect Certificate RERA Care.pdf20 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CCD Engineer Certificate.pdf20 Apr 2018
Certificates of CA (Form 3)File: CCD CA Certificate RERA Care.pdf20 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: CCD Commencement Certificate.pdf19 Apr 2018

How this compares with Solapur

15%of Solapur projects moved their completion datethis one moved by 54 months
39%of Solapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep City Center Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIP Road550+ in Solapur

2 kmCity Center TowerCompleted 21Lapsed / revoked 13Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 53 registered projects within 2 km.

Builder: City Centre Developers

City Centre Developers has 1 registration on MahaRERA, including City Center Tower. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if City Center Tower is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of City Center Tower?

The registered promoter entity is City Centre Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in City Center Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for City Center Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at City Center Tower?

The professionals named in the filing: Architect: Tauhid Shaikh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in City Center Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About City Center Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save City Center Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.